Canada Nickel Confirms High Grade Near-Surface Mineralization at Texmont
Canada Nickel Company has reported assay results from 12 drill holes at its Texmont property, confirming high-grade nickel mineralization over a 400-meter strike length. Highlights include:
- Hole 22-03: 5.2 meters of 2.60% nickel within a broader interval of 21.0 meters at 1.22% nickel.
- Hole 22-06: 4.0 meters at 2.43% nickel within 12.0 meters averaging 1.45% nickel.
The total drilling includes 39 holes over 9,670 meters, supporting the potential for near-term open-pit production. A mineral resource estimate is expected later this year.
- Confirmed high-grade nickel mineralization with multiple intervals exceeding 1% nickel.
- Drilling supports potential for near-term, smaller-scale open pit production.
- High-grade mineralization remains open to the north and at depth.
- None.
Highlights
- Nine of first twelve holes with intervals of greater than
1% nickel - First twelve holes confirm high grade mineralization over 400 metres of strike length that remains open to the north and at depth
- High grade intervals within thick mineralized sections include:
- Hole 22-03: 5.2 metres of
2.60% nickel within 21.0 metres of1.22% nickel within 91.5 metres of0.50% nickel from 58.5 metres - Hole 22-06: 4.0 metres of
2.43% nickel within 12.0 metres of1.45% nickel within 28.0 metres of0.77% nickel from 76.5 metres
The Company has drilled a total of 39 holes and 9,670 metres, completing its initial phase to support the development of a mineral resource at Texmont expected to be delivered later this year.
Texmont Nickel Property
The Texmont Property is located 36 kilometres south of
Table 1: Texmont exploration drilling results high grade highlights
Hole ID | From | To | Length* | Ni | Co | Pd | Pt | S |
(m) | (m) | (m) | ( %) | ( %) | (g/t) | (g/t) | ( %) | |
TEX22-01 | 22.0 | 44.1 | 22.1 | 0.52 | 0.01 | 0.042 | 0.036 | 0.34 |
TEX22-02 | 10.5 | 56.2 | 45.7 | 0.55 | 0.02 | 0.041 | 0.033 | 0.45 |
Including | 27.0 | 33.0 | 6.0 | 1.08 | 0.03 | 0.094 | 0.079 | 0.66 |
TEX22-03 | 58.5 | 150.0 | 91.5 | 0.50 | 0.01 | 0.031 | 0.023 | 0.45 |
Including | 129.0 | 150.0 | 21.0 | 1.22 | 0.03 | 0.108 | 0.070 | 1.09 |
Including | 138.8 | 144.0 | 5.2 | 2.60 | 0.06 | 0.265 | 0.226 | 2.46 |
And | 131.0 | 132.0 | 0.5 | 6.85 | 0.16 | 0.513 | 0.055 | 5.97 |
TEX22-04 | 127.3 | 161.5 | 34.2 | 0.56 | 0.02 | 0.046 | 0.046 | 0.33 |
Including | 145.5 | 151.0 | 4.4 | 0.99 | 0.03 | 0.073 | 0.056 | 0.61 |
TEX22-05 | 201.0 | 226.0 | 25.0 | 0.48 | 0.02 | 0.036 | 0.028 | 0.54 |
including | 219.0 | 226.0 | 7.0 | 0.74 | 0.02 | 0.063 | 0.048 | 0.85 |
TEX22-06 | 76.5 | 105 | 28.5 | 0.77 | 0.02 | 0.065 | 0.071 | 0.91 |
including | 82.5 | 94.5 | 12.0 | 1.45 | 0.04 | 0.137 | 0.156 | 1.74 |
including | 88.0 | 92.0 | 4.0 | 2.43 | 0.06 | 0.246 | 0.314 | 2.94 |
including | 90.1 | 90.6 | 0.5 | 10.6 | 0.25 | 1.200 | 1.680 | 12.4 |
TEX22-07 | 106.5 | 132.0 | 25.5 | 0.50 | 0.02 | 0.030 | 0.024 | 0.61 |
including | 106.5 | 114.0 | 7.5 | 0.79 | 0.02 | 0.068 | 0.046 | 0.97 |
TEX22-08 | 70.7 | 84.0 | 13.3 | 0.51 | 0.02 | 0.033 | 0.024 | 0.48 |
including | 70.7 | 74.0 | 3.3 | 1.12 | 0.03 | 0.097 | 0.065 | 1.13 |
TEX22-11 | 93.0 | 139.5 | 46.5 | 0.57 | 0.02 | 0.036 | 0.033 | 0.67 |
including | 94.5 | 109.5 | 15.0 | 1.06 | 0.03 | 0.081 | 0.073 | 1.32 |
* True widths are unknown |
Table 2: Texmont exploration drilling results - downhole average
Hole ID | From | To | Length* | Ni | Co | Pd | Pt | Cr | Fe | S |
(m) | (m) | (m) | ( %) | ( %) | (g/t) | (g/t) | ( %) | ( %) | ( %) | |
TEX22-01 | 8.3 | 249.0 | 240.7 | 0.29 | 0.01 | 0.015 | 0.014 | 0.17 | 6.01 | 0.44 |
TEX22-02 | 6.0 | 126.0 | 120.0 | 0.34 | 0.01 | 0.021 | 0.019 | 0.12 | 5.35 | 0.47 |
TEX22-03 | 1.8 | 150.0 | 148.2 | 0.40 | 0.01 | 0.021 | 0.017 | 0.14 | 5.26 | 0.39 |
TEX22-04 | 127.3 | 307.5 | 200.2 | 0.31 | 0.01 | 0.019 | 0.017 | 0.15 | 5.72 | 0.33 |
TEX22-05 | 39.0 | 401.8 | 362.8 | 0.18 | 0.01 | 0.010 | 0.010 | 0.14 | 6.75 | 0.25 |
Including | 189.7 | 345.5 | 155.8 | 0.28 | 0.01 | 0.014 | 0.012 | 0.13 | 5.51 | 0.31 |
TEX22-06 | 14.2 | 300.0 | 285.8 | 0.24 | 0.01 | 0.013 | 0.014 | 0.11 | 5.97 | 0.37 |
TEX22-07 | 6.0 | 300.0 | 294.0 | 0.24 | 0.01 | 0.011 | 0.011 | 0.16 | 6.32 | 0.45 |
and | 199.8 | 300.0 | 100.2 | 0.33 | 0.01 | 0.010 | 0.009 | 0.15 | 5.31 | 0.47 |
TEX22-08 | 9.3 | 282.0 | 272.7 | 0.22 | 0.01 | 0.008 | 0.008 | 0.15 | 5.77 | 0.28 |
Including | 61.5 | 163.5 | 102.0 | 0.31 | 0.01 | 0.010 | 0.009 | 0.15 | 5.27 | 0.33 |
TEX22-09 | 9.0 | 252.0 | 243.0 | 0.20 | 0.01 | 0.010 | 0.010 | 0.14 | 6.68 | 0.34 |
Including | 110.0 | 159.3 | 49.3 | 0.35 | 0.01 | 0.017 | 0.013 | 0.14 | 5.84 | 0.49 |
and | 180.0 | 244.5 | 64.5 | 0.28 | 0.01 | 0.008 | 0.008 | 0.18 | 5.60 | 0.39 |
TEX22-10 | 7.5 | 255.0 | 247.5 | 0.18 | 0.01 | 0.007 | 0.007 | 0.16 | 6.19 | 0.66 |
Including | 86.5 | 151.7 | 65.2 | 0.25 | 0.01 | 0.006 | 0.006 | 0.16 | 5.20 | 0.22 |
TEX22-11 | 6.6 | 222.8 | 216.2 | 0.28 | 0.01 | 0.013 | 0.014 | 0.18 | 6.37 | 0.41 |
including | 93.0 | 222.8 | 129.8 | 0.37 | 0.01 | 0.017 | 0.017 | 0.16 | 5.90 | 0.44 |
and | 236.1 | 303.0 | 66.9 | 0.25 | 0.01 | 0.008 | 0.009 | 0.15 | 5.51 | 0.28 |
TEX22-12 | 62.0 | 141.6 | 79.6 | 0.23 | 0.01 | 0.007 | 0.007 | 0.15 | 5.27 | 0.21 |
and | 164.0 | 211.0 | 47.0 | 0.21 | 0.01 | 0.006 | 0.005 | 0.18 | 6.12 | 0.37 |
TEX22-01 was collared directly over komatiite, and intersected a thick sequence of mineralized peridotite, ending in strongly serpentinized dunite, with minor dykes encountered near the top of the hole. The hole averaged
TEX22-02 was collared 100 metres northeast of TEX22-01 and intersected mineralized komatiite 6 metres below surface, intersecting mineralized peridotite for a length of 120.0 metres until encountering gabbro at the lower contact. The hole averaged
TEX22-03 was collared with an east azimuth 20 metres southwest of the existing mining shaft and intersected mineralized peridotite from 1.8 meters to the end of hole at 150.0 metres. The hole averaged
TEX22-04 was collared within the hanging wall intersecting mafic volcanics and then gabbro before encountering mineralized peridotite. The mineralized peridotite averaged
TEX22-05 was collared in hanging wall mafic volcanics and was aimed to cut across the strike length of the mineralized komatiite. The hole intersected 362.8 metres of peridotite averaging
TEX22-06 was drilled 100 m southeast of TEX22-03 in komatiite and intersected mineralized peridotite, with minor intersections of late dykes. The hole averaged
TEX22-07 was collared 100 southeast of TEX22-03, intersecting komatiite followed by a moderate to strongly mineralized peridotite, interrupted by minor diabase dykes. The hole averaged
TEX22-08 was collared 50 metres south of TEX22-07 and drilled to the west. The hole started in komatiite and continued into peridotite, ending in peridotite. The hole averaged
TEX22-09 was collared at the same location as TEX22-08 but at a steeper dip (-70o versus -50o). The hole started in komatiite and continued into peridotite, ending in peridotite. Mineralization averaged
TEX22-10 was collared 50 metres south of TEX22-08 and intersected a thick section of mineralized peridotite interrupted by a minor sliver of metasedimentary rocks. The hole averaged
TEX22-11 was collared at the same location as TEX22-10 but drilled at a steeper angle. The hole intersected two sections of mineralized peridotite,
TEX22-12 was collared 50 metres south of TEX22-10 and intersected 2 sections of mineralized peridotite separated by metasediments, the upper section averaging
Table 1: Texmont Drillhole Orientation
Hole ID | Easting (mE) | Northing (mN) | Azimuth (⁰) | Dip (⁰) | Length (m) |
TXT22-01 | 484872 | 5334590 | 270 | -78 | 249 |
TXT22-02 | 484872 | 5334590 | 270 | -50 | 126 |
TXT22-03 | 484802 | 5334530 | 90 | -65 | 150 |
TXT22-04 | 484985 | 5334595 | 270 | -50 | 345 |
TXT22-05 | 485012 | 5334504 | 270 | -50 | 420 |
TXT22-06 | 484890 | 5334471 | 270 | -50 | 300 |
TXT22-07 | 484890 | 5334471 | 270 | -70 | 300 |
TXT22-08 | 484855 | 5334421 | 270 | -50 | 282 |
TXT22-09 | 484855 | 5334420 | 270 | -70 | 252 |
TXT22-10 | 484850 | 5334364 | 270 | -48 | 255 |
TXT23-11 | 484850 | 5334364 | 270 | -65 | 303 |
TXT23-12 | 484830 | 5334318 | 270 | -52 | 222 |
Assays, Quality Assurance/Quality Control and Drilling and Assay
Qualified Person and Data Verification
The magnetic images shown in this press release were created from
About Canada Nickel Company
For further information, please contact:
Chair and CEO
Phone: 647-256-1954
Email: info@canadanickel.com
Cautionary Statement Concerning Forward-Looking Statements
This press release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward looking information includes, but is not limited to, drill and exploration results relating to the target properties described herein (the "Properties"), the potential of the
View original content to download multimedia:https://www.prnewswire.com/news-releases/canada-nickel-confirms-high-grade-near-surface-mineralization-at-texmont-301763829.html
SOURCE
FAQ
What are the latest assay results from Canada Nickel Company (CNIKF)?
How many drill holes were reported by Canada Nickel Company (CNIKF)?
What is the significance of the drilling results for Canada Nickel Company (CNIKF)?
When can we expect the mineral resource estimate from Canada Nickel Company (CNIKF)?