Canada Nickel Completes Drill Program at Deloro with Resource Estimate Expected in July
Canada Nickel has completed its 2024 drilling program at Deloro, expanding the mineralized footprint by 50% to 1.2 km long and up to 700 m wide. Located 8 km south of Timmins, Deloro has shallow overburden and easy road and powerline access. Eleven drill holes were completed, with significant nickel mineralization noted, including 0.26% nickel over 431 meters and 0.27% nickel over 293 meters. A resource estimate is underway and expected by July 2024. CEO Mark Selby highlighted the success of the exploration program, which is part of a broader effort involving seven drill rigs across multiple properties.
- Increased mineralized footprint by 50% to 1.2 km long by up to 700 meters wide.
- Significant nickel mineralization in drill holes, including 0.26% over 431 meters and 0.27% over 293 meters.
- Deloro’s strategic location: 8 km south of Timmins with road and powerline access.
- Resource estimate expected by July 2024.
- Ongoing exploration with seven drill rigs across multiple properties.
- No specific negative financial data or risks reported in the press release.
Highlights
- 2024 drilling increases mineralized footprint by
50% to 1.2 kilometres long by up to 700 metres wide. Deloro is located just 8 kilometres south ofTimmins with direct road and powerline access and shallow overburden averaging less than 9 metres thick.- 11 holes successfully completed including DEL24-12 with
0.26% nickel over 431 metres and DEL24-17 with0.27% nickel over 293 metres. - Resource estimate is underway and expected to be completed in July 2024.
Mark Selby, CEO of Canada Nickel said, "We are very pleased with the 2024 drilling program at
Deloro Property
The Deloro Property is located just 8 km south of
Canada Nickel has completed a geological model of the deposit and expects an initial resource estimate to be completed in July.
BHID | From (m) | To (m) | Length (m)* | Ni % | Co % | Pd g/t | Pt g/t | Cr % | Fe % | S % |
DEL24-12 | 9.9 | 441.0 | 431.1 | 0.26 | 0.01 | 0.003 | 0.005 | 0.28 | 5.25 | 0.10 |
including | 103.5 | 130.5 | 30.0 | 0.30 | 0.01 | 0.003 | 0.005 | 0.20 | 5.00 | 0.03 |
DEL24-13 | 6.0 | 187.5 | 181.5 | 0.24 | 0.01 | 0.003 | 0.005 | 0.23 | 4.89 | 0.06 |
and | 222.0 | 277.0 | 55.0 | 0.25 | 0.01 | 0.003 | 0.005 | 0.22 | 5.25 | 0.05 |
and | 289.9 | 402.0 | 112.1 | 0.25 | 0.01 | 0.003 | 0.005 | 0.21 | 5.20 | 0.07 |
DEL24-14 | 5.3 | 92.7 | 87.4 | 0.22 | 0.01 | 0.003 | 0.005 | 0.19 | 4.75 | 0.05 |
DEL24-15 | 6.0 | 164.0 | 162.0 | 0.24 | 0.01 | 0.004 | 0.006 | 0.17 | 5.59 | 0.09 |
and | 202.6 | 377.6 | 175.0 | 0.25 | 0.01 | 0.003 | 0.005 | 0.24 | 5.35 | 0.10 |
DEL24-16 | 9.5 | 219.5 | 210.0 | 0.20 | 0.01 | 0.004 | 0.005 | 0.18 | 5.63 | 0.05 |
and | 234.0 | 286.5 | 52.5 | 0.23 | 0.01 | 0.003 | 0.004 | 0.24 | 5.70 | 0.04 |
and | 361.0 | 408.0 | 47.0 | 0.26 | 0.01 | 0.003 | 0.004 | 0.20 | 5.33 | 0.06 |
DEL24-17 | 35.8 | 329.1 | 293.3 | 0.27 | 0.01 | 0.003 | 0.003 | 0.18 | 5.13 | 0.05 |
and | 379.0 | 402.0 | 23.0 | 0.23 | 0.01 | 0.003 | 0.003 | 0.22 | 5.11 | 0.04 |
DEL24-18 | 9.0 | 233.5 | 224.5 | 0.26 | 0.01 | 0.003 | 0.005 | 0.18 | 4.84 | 0.08 |
and | 371.6 | 401.0 | 29.4 | 0.23 | 0.01 | 0.003 | 0.005 | 0.46 | 5.83 | 0.08 |
DEL24-19 | 12.0 | 67.0 | 55.0 | 0.17 | 0.01 | 0.006 | 0.006 | 0.33 | 7.52 | 0.01 |
and | 206.7 | 354.0 | 147.3 | 0.22 | 0.01 | 0.003 | 0.004 | 0.22 | 6.27 | 0.02 |
DEL24-20 | 3.0 | 319.6 | 316.6 | 0.24 | 0.01 | 0.003 | 0.005 | 0.13 | 4.88 | 0.10 |
DEL24-22 | 75.2 | 270.0 | 194.8 | 0.19 | 0.01 | 0.007 | 0.011 | 0.38 | 6.84 | 0.04 |
*True width undetermined. All lengths are drillhole lengths. DEL24-21 drilled parallel on a barren dyke. |
Table 2: Drillhole Orientation
Hole ID | Easting (mE) | Northing (mN) | Azimuth (⁰) | Dip (⁰) | Length (m) |
DEL24-12 | 480334 | 5361525 | 71 | -50 | 441 |
DEL24-13 | 480905 | 5361212 | 250 | -50 | 404 |
DEL24-14 | 480905 | 5361212 | 70 | -50 | 102 |
DEL24-15 | 481013 | 5360908 | 250 | -50 | 405 |
DEL24-16 | 480926 | 5361048 | 250 | -50 | 408 |
DEL24-17 | 480549 | 5361266 | 70 | -50 | 402 |
DEL24-18 | 480640 | 5360665 | 70 | -50 | 401 |
DEL24-19 | 480640 | 5360665 | 250 | -50 | 402 |
DEL24-20 | 480980 | 5360569 | 60 | -60 | 396 |
DEL24-21 | 480824 | 5360648 | 62 | -50 | 168 |
DEL24-22 | 480824 | 5360648 | 225 | -50 | 402 |
Quality Assurance and Control, Drilling and Assaying
Edwin Escarraga, MSc, P.Geo., a "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"), is responsible for the on-going drilling and sampling program, including quality assurance (QA) and quality control (QC). The core is collected from the drill in sealed core trays and transported to the core logging facility. The core is marked and sampled at 1.5 metre lengths and cut with a diamond blade saw. One set of samples is transported in secured bags directly from the Canada Nickel core shack to Actlabs Timmins, while a second set of samples is securely shipped to SGS Lakefield for preparation, with analysis performed at SGS Burnaby or SGS Callao (
Qualified Person and Data Verification
Stephen J. Balch P.Geo. (ON), VP Exploration of Canada Nickel and a "qualified person" as such term is defined by NI 43-101, has verified the data disclosed in this news release, and has otherwise reviewed and approved the technical information in this news release on behalf of Canada Nickel Company Inc.
About Canada Nickel Company
Canada Nickel Company Inc. is advancing the next generation of nickel-sulphide projects to deliver nickel required to feed the high growth electric vehicle and stainless steel markets. Canada Nickel Company has applied in multiple jurisdictions to trademark the terms NetZero NickelTM, NetZero CobaltTM, NetZero IronTM and is pursuing the development of processes to allow the production of net zero carbon nickel, cobalt, and iron products. Canada Nickel provides investors with leverage to nickel in low political risk jurisdictions. Canada Nickel is currently anchored by its
For further information, please contact:
Mark Selby
CEO
Phone: 647-256-1954
Email: info@canadanickel.com
This press release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward looking information includes, but is not limited to, drill and exploration results relating to the target properties described herein (the "Properties"), the significance of drill results, the ability to continue drilling, the impact of drilling on the definition of any resource, the potential of the Crawford Nickel Sulphide Project and the Properties, timing and completion (if at all) of mineral resource estimates, the ability to sell marketable materials, strategic plans, including future exploration and development plans and results, and corporate and technical objectives. Forward-looking information is necessarily based upon several assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information. Factors that could affect the outcome include, among others: future prices and the supply of metals, the future demand for metals, the results of drilling, inability to raise the money necessary to incur the expenditures required to retain and advance the property, environmental liabilities (known and unknown), general business, economic, competitive, political and social uncertainties, results of exploration programs, risks of the mining industry, delays in obtaining governmental approvals, failure to obtain regulatory or shareholder approvals. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Canada Nickel disclaims any intention or obligation to update or revise any forward-looking information, whether because of new information, future events or otherwise, except as required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/canada-nickel-completes-drill-program-at-deloro-with-resource-estimate-expected-in-july-302162530.html
SOURCE Canada Nickel Company Inc.
FAQ
What is the significance of Canada Nickel's 2024 drilling program at Deloro?
When is the resource estimate for Deloro expected?
What are the key nickel assay results from Canada Nickel's drilling at Deloro?
Where is Deloro located?