Interim Report and Accounts for the Six Months Ended 30 June 2023

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary
Condor Gold plc announces unaudited interim financial results for the six-month period to 30 June 2023. Significant interest in the sale of the Company's assets. Land acquisition and site clearance progress. Positive gold and silver findings. Raised £1 million through warrant exercise. Sales process update with substantial interest and non-binding offers. Focus on executing successful asset sale.
Positive
  • Significant interest in the sale of the Company's assets
  • Land acquisition and site clearance progress
  • Positive gold and silver findings
  • Raised £1 million through warrant exercise
  • Sales process update with substantial interest and non-binding offers
Negative
  • None.

SURRY, BC / ACCESSWIRE / September 7, 2023 / Condor Gold plc ("Condor Gold", "Condor", the "Group" or the "Company"), (AIM:CNR)(TSX:COG) announces that it has today published its unaudited interim financial results for the six-month period to 30 June 2023.

It has been posted on the Company's websites www.condorgold.com and ca.condorgold.com. It is also available on SEDAR at www.sedar.com.

Highlights for six months to 30 June 2023

  • There continues to be significant interest in the sale of the Company's assets
  • The Company hosted 2 site visits in connection with the sale of the assets in Nicaragua during the first half of the year. There are currently 5 non-binding offers.
  • Land acquisition continued at the La India open pit and associated mine site infrastructure. To date, 99.6% of the core areas have been purchased.
  • Site clearance of 14 hectares has been completed for the processing plant location, including areas for offices, warehouses, a stockpile, and a buffer zone.
  • 0.66 g/t gold from an isolated high-level chalcedonic rock chip sample 400 m west of Cacao deposit indicates continuity of the hidden, deep-seated high-grade mineralised Cacao deposit to the west.
  • Up to 6.29 g/t gold from a 0.5 m thick quartz breccia in artisanal mine workings at the Twin Hills (Dos Gemelos) prospect confirm mineralisation along the Cacao trend some 2 km east of the Cacao deposit.
  • 26.1 g/t gold and 200 g/t silver from new artisanal mine working at the southern end of the main El Paraiso vein trend on the Rio Luna Concession extends the strike length of medium to high-grade mineralisation on the El Paraiso structure from 3.5 to over 4 km.

Post Period Highlights

  • 4 July 2023 the Company announced it had raised £1 million by way of the exercise of warrants by Galloway Limited, a company wholly owned by Burnbrae Group Limited, which is, in turn, wholly owned by Jim Mellon, Condor's Chairman, increasing Galloway's shareholding to 23% of Condor Gold.
  • 21 July 2023 the Company provide an update on the sales process.

Chairman's Statement for the Six Months to 30 June 2023

Dear Shareholder,

I continue to be impressed by the executive team' dedication to getting our project shovel ready, which is eliciting good interest in the current sales process.

We are very aware of the value of our assets and will not allow them to go at anything other than a fair price.

Jim Mellon

Chairman

CEO'S Report for the Six Months to 30 June 2023

Dear Shareholder,

I am pleased to present Condor Gold Plc's ("Condor", the "Company" or the "Group") interim report for the 6-month financial period to 30 June 2023 www.condorgold.com or, if you are viewing from Canada, ca.condorgold.com.

The focus during the 6 month period to 30 June 2023 has been on the sale of the Company's assets in Nicaragua. On 22 November 2022, the Company announced a strategy update and informed the market that it had appointed an advisor to sell its assets. The Board carefully reviewed the Company's options as the Project is "construction ready" with an18 month construction timeline. The options included going through a financing and construction phase as a single asset, single jurisdiction company with no existing gold production experience. The Board concluded that it is in the best interests of the Company and all stakeholders to sell the assets of the Company to a gold producer with mine building expertise, thus ensuring a new mine at La India, a significant investment made in the local area, which will regenerate the local communities. As a result of this strategy, the Board has reclassified the Nicaraguan assets as held for sale within the Group and Company Statements of Financial Position. The focus for 2023 is to execute on a successful sale of the assets while maintaining a social license to operate at the fully permitted La India Project.

The last update on the sales process was on 21 July 2023, my quote in the RNS: "There remains substantial interest from gold producers to acquire the Company's assets. Wholly owned, fully permitted, construction ready gold mines with potential production of 150,000 oz gold per annum, in major Gold Districts, with the land and a new SAG Mill package purchased and a construction period of only 18 months are rare. There are currently eight companies under NDAs, five non-binding offers received and three site visits completed. Companies under NDAs have access to a virtual data room, which includes all drill data, technical studies to Feasibility Study level, details of permits to construct and operate a mine and financial models. While the sales process is taking longer than anticipated, new enquires continue to be received and the Board is confident that a binding agreement will be reached. Investors will be updated in due course."

The Company's strategy has been to develop the fully permitted La India Project in two stages using the new SAG Mill that has already been purchased. The delivery of a Feasibility Study Technical Report ("2022 FS") on 26 October 2022 on La India open pit, with an average of 81,524 oz gold per annum for the initial six years for a relatively low total upfront capital cost of US$106 million is a landmark and significantly de-risks the Project. At US$1,600 oz gold, the La India open pit Mineral Reserve produces total revenues of US$888 million, the total operating costs of mining, processing and G&A are US$480 million, leading to an operating profit of US$408 million or a 46% operating margin. After government and other royalties, but before sustaining capital, the operating profit is US$355 million, which in Condor's opinion is ample to repay any project debt on the relatively low upfront capex. At US$2,000 oz gold after paying royalties, but before sustaining capital the operating profit is US$563 million. In reality, two permitted high grade feeder pits will be added during the early years of production thus increasing production ounces of gold. Early production is targeted at 100,000 oz gold p.a.

The plan would be to materially expand production by converting existing Mineral Resources into Mineral Reserves and an associated integrated mine plan. On 25 October 2021, the Company announced the results of a Preliminary Economic Assessment and filed on SEDAR a technical report entitled "Condor Gold Technical Report on the La Indian Gold Project, Nicaragua, 2021" detailing average annual production of 150,000 oz of gold over the initial nine years of production from open pit and underground Mineral Resources and providing an indication of production targets.

The 2022 MRE update was prepared by SRK Consulting (UK) Limited ("SRK") and uses the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Standards on Mineral Resources and Mineral Reserves (May 2014).

The updated Mineral Resource Estimate is 9,672 kt at 3.5g/t gold for 1,088,000 oz gold in the indicated mineral resource category and 8,642 kt at 4.3g/t gold for 1,190,000 oz gold in the inferred mineral resource category. The 2022 FS was conducted on La India Open Pit which has a Mineral Resource Estimate of 8,487 kt at 3.0g/t gold in for 827,000 oz gold in the indicated mineral resource category and 893 Kt at 2.4 g/t gold for 69,000 oz gold in the inferred mineral resource category. The La India Open Pit Mineral resource is inclusive of a Probable Mineral Reserve of 7.3Mt at 2.56g/t gold for 602,000 oz gold.

Outside the main La India open pit Mineral Reserve (the subject of the 2022 FS), there is a historical estimate, outlined in the 2021 Preliminary Economic Assessment, of additional open pit Mineral Resources on four deposits (America, Mestiza, Central breccia and Cacao) which represent an aggregate 206 Kt at 9.9 g/t gold for 66,000 oz in the indicated Mineral Resource category and 2.1Mt at 3.3 g/t gold for 223,000 oz gold in the inferred Mineral Resource category. In addition, there is an aggregate underground Mineral Resource (La India, America, Mestiza, Central Breccia San Lucas, Cristalito-Tatescame, and Cacao) of 979Kt at 6.2 g/t for 194,000 oz gold in the indicated mineral resource category and 5.6Mt at 5.0 g/t gold for 898,000 oz gold in the inferred mineral resource category.

Highlights: Feasibility Study La India Open Pit only

The 2022 FS demonstrates a robust and economically viable base case for the La India open pit:

  • Probable Mineral Reserve of 7.3Mt at 2.56g/t gold for 602,000 oz gold
  • Production averages 81,545 oz gold per annum for the first six years of an 8.4 year mine life
  • An Internal Rate of Return ("IRR") of 23% and a post-tax, post upfront capital cost NPV of US$86.9 million using a discount rate of 5% and price of US$1,600 oz gold (Mineral Reserve Case).
  • An Internal Rate of Return ("IRR") of 43% and a post-tax, post upfront capital cost NPV of US$205.2 million using a discount rate of 5% and price of US$2,000 oz gold.
  • Low initial capital requirement of US$105.5 million (including contingency and EPCM contract)
  • Low average Life of Mine All-in Sustaining cash costs US$1,039 per oz gold.

The Company's strategy of a two-stage approach to production is supported by a technical study released in October 2021, when Condor Gold announced the key findings of a technical report on the La India Gold Project prepared by SRK. This technical report (the "Technical Report") presented the results of a strategic mining study to Preliminary Economic Assessment ("PEA") standards. The strategic study covers two scenarios: Scenario A, in which the mining is undertaken from four open pits, termed La India, America, Mestiza and Central Breccia Zone ("CBZ"), which targets a plant feed rate of 1.225 million tonnes per annum ("Mtpa"); and Scenario B, where the mining is extended to include three underground operations at La India, America and Mestiza, in which the processing rate is increased to 1.4 Mtpa. The 2021 Technical Report was issued in October 2021 and filed on SEDAR and the Company's websites for public disclosure to NI 43-101 standards.

Highlights 1.225 Mtpa PEA La India Open Pit + Feeder Pits:

  • IRR of 58% and a post-tax Net Present Value ("NPV") of US$302 million, at a discount rate of 5% and gold price of US$1,700/oz.
  • Average annual production of ~120,000 oz of gold over the initial 6 years of production.
  • 862,000 oz of gold produced over 9-year Life of Mine.
  • Initial capital requirement of US$153 million (including contingency).
  • Payback period 12 months.
  • All-in Sustaining Costs ("AISC") of US$813 per oz gold.
  • Robust Base Case presents an IRR of 48% and a post-tax NPV of US$236 million at a discount rate of 5% and gold price of US$1,550/oz.

Highlights: 1.4Mtpa PEA Open Pit + Underground Operations

  • IRR of 54% and a post-tax NPV of US$418 million, after deducting upfront capex, at a discount rate of 5% and gold price of US$1,700/oz.
  • Average annual production of ~150,000 oz of gold over the initial 9 years of production.
  • 1,469,000 oz of gold produced over 12-year Life Of Mine.
  • Initial capital requirement of US$160 million (including contingency), where the underground development is funded through cash flow.
  • Payback period 12 months.
  • All-in Sustaining Costs of US$958 per oz gold over Life Of Mine.

The Company remains convinced that the 587 sq km La India Project is a major gold district with the potential for significant future discoveries. Condor's geologists have identified two major north-northwest-striking mineralised basement feeder zones traversing the Project, the "La India Corridor", which hosts 90% of Condor's gold mineral resource and the "Andrea Los Limones Corridor". Numerous geophysics, soil geochemistry and surface rock chips indicate the possibility for further mineralisation along strike. The updated MRE 2022 for the Cacao deposit increased the MRE in the inferred mineral resource category by 69% to 101,000 oz gold at 2.5 g/t gold, the interpretation is that drilling has clipped the top of a fully preserved epithermal vein system with a strike length of at least 1km with the potential to host over 1 million oz gold.

The Company continues to enhance its social engagement and activities in the community, thereby maintaining its social licence to operate. Condor has strengthened its community team and stepped-up social activities and engagement programmes. The main local focus is the drinking water programme, implemented in April 2017. A total of 740 families are currently benefiting from the program and currently receive five-gallon water dispensers each week. In May 2021, the Company installed a water purification plant at a cost of approximately US$250,000 to provide drinking water to the local communities.

In January 2018 Condor initiated ‘Involvement Programmes', which now extend to six groups in the local village to benefit communities which may be affected by the mine. Taking the Elderly Group as an example, a committee of six people has been formed. The Company allocates monthly support to the Elderly Group, which decides how this money is spent to benefit the elderly in the Community. Projects include a garden for medicinal herbs which are made into products which are used by group members and sold to others in the community.

Condor continues to have very constructive meetings with key Ministries that granted the Environment Permit (EP) for the La India, La Mestiza and America open pits. The Company has been operating in Nicaragua since 2006 and, as a responsible gold exploration and development company, continues to add value to the local communities and environment by generating sustainable socio-economic and environmental benefits. This includes skills training. The new mine would potentially create approximately 1,000 jobs during the construction period, with priority to be given to suitably skilled members of the local community. The upfront capital cost of approximately US$106 million as detailed in the 2022 FS will have a significant positive impact on the economy. The Government and local communities will benefit significantly from future royalties and taxes.

On 4 July 2023 the Company announced it had raised £1 million by way of the exercise of warrants by Galloway Limited, a company wholly owned by Burnbrae Group Limited, which is, in turn, wholly owned by Jim Mellon, Condor's Chairman, increasing Galloway's shareholding to 23% of Condor Gold (See RNS for details).

Turning to the financial results for the 2023 interims, the Group's loss for the period was £565,8159 (2022: £1,372,390). The Company raised a total of £73,438 after expenses during the financial period (2022: £3,304,002). The net cash balance of the Group at 30 June 2023 was £584,837 (2022: £2,453,607). During the period, there was a £2,294,117 foreign exchange loss (2022 £3,270,705 gain). This is as a result of significant changes in USD against GBP. The Board is aware of currency fluctuations and is working to mitigate any further losses.

The focus for 2023 is to execute on a successful sale of the assets while maintaining a social license to operate at the fully permitted La India Project.

Mark Child

CEO

CONDOR GOLD PLC

CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
FOR THE SIX MONTHS TO 30 JUNE 2023


Six months
to 30.06.23
unaudited
£
Six months
to 30.06.22
unaudited
£
Revenue
- -

Share based payments
(162,425) (288,906)
Administrative expenses
(810,702) (1,085,069)

Operating loss
(973,127) (1,373,975)

Finance income
7,312 1,585

Loss before income tax
(965,815) (1,372,390)

Income tax expense
- -

Loss for the period
(965,815) (1,372,390)


Other comprehensive income/(loss):
Currency translation differences
(2,294,117) 3,270,705
Other comprehensive income/(loss) for the period
(2,924,117) 3,270,705

Total comprehensive income/(loss) for the period
(3,259,932) 1,898,315


Earnings per share expressed in pence per share:
Basic and diluted (in pence)Note 7
(0.61) (0.92)


CONDOR GOLD PLC

CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2023


30.06.23
unaudited
£
31.12.22
audited
£
30.06.22
unaudited
£
ASSETS:
NON-CURRENT ASSETS
Property, plant and equipment
- - 7,818,025
Intangible assets
- - 32,752,758

- - 40,570,783

CURRENT ASSETS
Assets classified as held for sale
41,785,894 42,937,116 -
Trade and other receivables
634,310 916,963 862,775
Cash and cash equivalents
584,837 2,444,093 2,453,607

43,005,041 46,298,172 3,316,382

TOTAL ASSETS
43,005,041 46,298,172 43,887,165

LIABILITIES:
CURRENT LIABILITIES
Trade and other payables
137,145 406,207 221,966


TOTAL LIABILITIES
137,145 406,207 221,966

NET CURRENT ASSETS
42,867,896 45,891,965 3,094,416

NET ASSETS
42,867,896 45,891,965 43,665,199


SHAREHOLDERS' EQUITY ATTRIBUTABLE TO OWNERS OF THE PARENT
Called up share capital
31,748,067 31,747,809 31,707,573
Share premium
46,754,815 46,681,635 43,451,199
Exchange difference reserve
(1,543,545) 750,572 788,667
Retained earnings
(34,091,441) (33,288,051) (32,282,240)
TOTAL EQUITY
42,867,896 45,891,965 43,665,199


CONDOR GOLD PLC

CONDENSED COMPANY STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2023


30.06.23
unaudited
£
31.12.22
audited
£
30.06.22
unaudited
£
ASSETS:
NON-CURRENT ASSETS
Property, plant and equipment
- - 4,309,955
Investments
751,977 751,977 751,977
Other receivables
44,944,687 43,500,630 41,614,215

45,696,664 44,252,607 46,676,147

CURRENT ASSETS
Assets classified as held for sale
4,474,402 4,474,402 -
Trade and other receivables
77,772 333,101 81,971
Cash and cash equivalents
542,713 2,407,187 2,390,197

5,094,887 7,214,690 2,472,168

TOTAL ASSETS
50,791,551 51,467,297 49,148,315

LIABILITIES:
CURRENT LIABILITIES
Trade and other payables
147,626 249,357 343,663


TOTAL LIABILITIES
147,626 249,357 343,663

NET CURRENT ASSETS
4,947,261 6,965,333 2,128,505

NET ASSETS
50,643,925 51,217,940 48,804,652


SHAREHOLDERS' EQUITY ATTRIBUTABLE TO OWNERS OF THE PARENT
Called up share capital
31,748,067 31,747,809 31,707,573
Share premium
46,754,815 46,681,635 43,451,199
Retained earnings
(27,858,957) (27,211,504) (26,354,120)
TOTAL EQUITY
50,643,925 51,217,940 48,804,652


CONDOR GOLD PLC

CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
AS AT 30 JUNE 2023

Share capital Share premium Exchange difference reserve Retained earnings Total equity
£ £ £ £ £

At 1 January 2022
29,326,143 42,528,627 (2,482,038) (31,198,756) 38,173,976


Loss for the period
- - - (1,372,390) (1,372,390)
Other comprehensive income:
- - - - -
Currency translation differences
- - 3,270,705 - 3,270,705



Total comprehensive income
- - 3,270,705 (1,372,390) 1,898,315

New shares issued
2,381,430 922,572 - - 3,304,002
Issue costs
- - - - -
Share based payment
- - - 288,906 288,906
Total contributions by & distributions to owners of the parent, recognised directly in equity
2,381,430 922,572 - 288,906 3,592,908

At 30 June 2023
31,707,573 43,451,199 788,667 (32,282,240) 43,665,199

At 1 January 2023
31,747,809 46,681,635 750,572 (33,288,051) 45,891,965


Loss for the period
- - - (965,815) (965,815)
Other comprehensive income:
- - - - -
Currency translation differences
- - (2,294,117) - (2,294,117)


Total comprehensive income
- - (2,294,117) (965,815) (3,259,932)

New shares issued
258 73,180 - - 73,438
Issue costs
- - - - -
Share based payment
- - - 162,425 162,425
Total contributions by & distributions to owners of the parent, recognised directly in equity
258 73,180 - 162,425 235,863

At 30 June 2023
31,748,067 46,754,815 (1,543,545) (34,091,441) 42,867,896

CONDOR GOLD PLC

CONDENSED COMPANY STATEMENT OF CHANGES IN EQUITY
AS AT 30 JUNE 2023

Share capital Share premium Retained earnings Total
£ £ £ £
At 1 January 2022
29,326,143 42,528,627 (25,461,018) 46,393,752

Comprehensive income:
Loss for the period
- - (1,182,008) (1,182,008)

Total comprehensive income
- - (1,182,008) (1,182,008)

New shares issued
2,381,430 922,572 - 3,354,002
Issue costs
- - - -
Share based payment
- - 288,906 288,906

Total transactions with owners recognised directly in equity
2,381,430 922,572 288,906 3,592,908

At 30 June 2022
31,707,573 43,451,199 (26,354,120) 48,804,652


At 1 January 2023
31,747,809 46,681,635 (27,211,504) 51,217,940

Comprehensive income:
Loss for the period
- - (809,878) (809,878)

Total comprehensive income
- - (809,878) (809,878)

New shares issued
258 73,180 - 73,438
Issue costs
- - - -
Share based payment
- - 162,425 162,425

Total transactions with owners recognised directly in equity
258 73,180 162,425 235,863

At 30 June 2023
31,748,067 46,754,815 (27,858,957) 50,643,925

CONDOR GOLD PLC

CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS TO 30 JUNE 2023


Six months
to 30.06.23
unaudited
£
Six months
to 30.06.22
unaudited
£
Loss before tax
(965,815) (1,372,390)
Share based payment
162,425 288,906
Depreciation charges
27,461 34,301
Finance income
(7,312) (1,585)

(783,241) (1,050,768)


Increase in trade and other receivables
282,653 (87,082)
(Decrease)/increase in trade and other payables
(269,062) (26,210)


Net cash used in operating activities
(769,650) (1,164,060)

Cash flows from investing activities
Purchase of intangible fixed assets
(1,067,405) (1,805,216)
Purchase of tangible fixed assets
(11,014) (62,363)
Interest received
7,312 1,585


Net cash used in investing activities
(1,071,107) (1,865,994)

Cash flows from financing activities
Net proceeds from share issue
73,438 3,304,002


Net cash generated from financing activities
73,438 3,304,002



Increase/(decrease) in cash and cash equivalents
(1,767,319) 273,948
Cash and cash equivalents at beginning of period
2,444,093 2,072,046
Exchange gains on cash and bank
(91,937) 107,613

Cash and cash equivalents at end of period
584,837 2,453,607

CONDOR GOLD PLC

CONDENSED COMPANY STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS TO 30 JUNE 2023


Six months Six months

to 30.06.23 unaudited to 30.06.22 unaudited

£ £
Cash flows from operating activities
Loss before tax
(809,878) (1,182,008)
Share based payment
162,425 288,906
Finance income
(4,899) (1,585)

(652,352) (894,687)

(Increase) / Decrease in trade and other receivables
255,329 (48,642)
Increase / (Decrease) in trade and other payables
(101,731) 174,207

Net cash used in operating activities
(498,754) (769,122)

Cash flows from investing activities
Purchase of tangible fixed assets
- -
Interest received
4,899 1,585
Loans to subsidiaries
(1,444,057) (2,102,735)

Net cash used in investing activities
(1,439,158) (2,101,150)

Cash flows from financing activities
Proceeds from share issue

73,438 3,304,002
Net cash from financing activities
73,438 3,304,002

Increase / (Decrease) in cash and cash equivalents
(1,864,474) 433,730


Cash and cash equivalents at beginning of year
2,407,187 1,956,467

Cash and cash equivalents at end of year
542,713 2,390,197


CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

1. COMPLIANCE WITH ACCOUNTING STANDARDS

Basis of preparation

This condensed set of financial statements has been prepared in accordance with IAS 34 Interim Financial Reporting as adopted by the European Union and also as issued by the International Accounting Standards Board ("IASB"). It has been prepared using accounting policies consistent with International Financial Reporting Standards ("IFRS") and should be read in conjunction with the annual financial statements for the year ended 31 December 2022 which have been prepared in accordance with IFRS as adopted by the EU and as issued by the IASB.

The interim results for the six months to 30 June 2023 are unaudited and the accounts in this interim report do not therefore constitute statutory accounts in accordance with Section 434 of the Companies Act 2006.

Statutory accounts for the year ended 31 December 2022 have been filed with the Registrar of Companies and the auditor's report was unqualified and did not contain any statement under Section 498(2) or 498(3) of the Companies Act 2006. The statutory accounts contained a material uncertainty in respect of going concern which referred to the Group's need to raise further funding in order to progress exploration activity. There were no other matters drawn to the attention of the users of the financial statements in the auditor's report.

The interim financial information for the six months ended 30 June 2023 was approved by the Board on X September 2023.

The directors do not propose an interim dividend.

The directors consider the going concern basis to be appropriate based on cash flow forecasts and projections and current levels of commitments, and cash and cash equivalents. Additionally, the company raised £1,000,000 as a result of an exercise in warrants in July 2023. It is expected this will fund future plans for at least 6 months. The company continues to enjoy the support of its chairman, Jim Mellon. The comparative period presented is that of the six months ended 30 June 2022.

The Directors are of the opinion that due to the nature of the Group's activities and the events during that period these are the most appropriate comparatives for the current period. Copies of these financial statements are available on the Company's website and on www.Sedar.com.

2. ACCOUNTING POLICIES

The interim financial information for the six months ended 30 June 2023 has been prepared on the basis of the accounting policies set out in the most recently published financial statements for the Group for the year ended 31 December 2022, which are available on the Company's website www.condorgold.com and on SEDAR at www.sedar.com, as the Company does not anticipate the addition of new standards to the Group's results for the year ended 31 December 2022 would materially impact the results.

3. REVENUE AND SEGMENTAL REPORTING

The Group has not generated any revenue during the period. The Group's operations are located in the United Kingdom and Nicaragua.

The following is an analysis of the carrying amount of segment assets, and additions to plant and equipment, analysed by geographical area in which the assets are located.

CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

The Group's results by reportable segment for the six-month period ended 30 June 2023 are as follows:



UK

Six months to 30.06.2023

£

Nicaragua

Six months to 30.06.2023

£

Consolidation

Six months to 30.06.2023

£

RESULTS
Operating loss

(942,557

)

(30,570

)

(973,127

)
Finance income

7,312

-

7,312

Income tax

-

-

-

Loss for period

(935,245

)

(30,570

)

(965,815

)

Assets

All transactions between each reportable segment are accounted for using the same accounting policies as the Group uses.


UK
30.06.2023
£
Nicaragua
30.06.2023
£
Consolidation
30.06.2023
£
ASSETS
Total assets
5,844,460 37,999,560 43,844,020

UK
30.06.2023
£
Nicaragua
30.06.2023
£
Consolidation
30.06.2023
£
LIABILITIES
Total liabilities
(147,626) 10,481 (137,145)

CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

The Group's results by reportable segment for the six-month period ended 30 June 2022 are as follows:


UK
Six months to 30.06.2022
£
Nicaragua
Six months to 30.06.2022
£
Consolidation
Six months to 30.06.2022
£
RESULTS
Operating loss
(1,288,746) (85,229) (1,373,975)

Finance income
1,585 - 1,585

Income tax
- - -

Loss for period
(1,287,161) (85,229) (1,372,390)

Assets and liabilities

All transactions between each reportable segment are accounted for using the same accounting policies as the Group uses.


UK
30.06.2022
£
Nicaragua
30.06.2022
£
Consolidation
30.06.2022
£
ASSETS
Total assets
7,531,696 37,025,917 44,557,613

UK
30.06.2022
£
Nicaragua
30.06.2022
£
Consolidation
30.06.2022
£
LIABILITIES
Total liabilities
(343,663) 121,697 (221,966)

CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

4. TAXATION

There is no current tax charge/(credit) for the period. The condensed financial statements do not include a deferred tax asset in respect of unused tax losses as the Directors are unable to assess that there will be probable future taxable profits available against which the unused tax losses can be utilised.

5. INTANGIBLE FIXED ASSETS

During the six months ended 30 June 2023, the Group acquired assets with a cost of £1,067,405 (six months ended 30 June 2022: £1,805,216).

6. EQUITY-SETTLED SHARE OPTION SCHEME AND WARRANTS

The estimated fair value of the options and warrants granted and charged to profit or loss in the period was;

Six Six
months
to 30.06.2023
unaudited
£
months
to 30.06.2022
unaudited
£
Share options charge
162,425 288,906

The fair value of options has been recognised within profit or loss, on a pro-rata basis over the vesting period. This fair value has been calculated using the Black-Scholes option pricing model. The latest inputs into the model were as follows:


2023 2022
Share price
25.5p 25.5p
Exercise price
33p 33p
Expected volatility
35.6% 35.6%
Expected life (yrs.)
5 5
Risk free rate
0.5% 0.5%
Expected dividend yield
- -

CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

7. EARNINGS PER SHARE

Basic earnings per share is calculated by dividing the loss attributable to ordinary shareholders by the weighted average number of ordinary shares outstanding during the period.

A reconciliation is set out below:


Six months
to 30.06.23
Six months
to 30.06.22
Basic EPS

Loss for the period
(965,815) (1,372,390)
Weighted average number of shares
158,739,611 147,667,937
Earnings per share (in pence)
(0.61) (0.92)

In accordance with IAS 33, as the Group has reported a loss for the period, diluted earnings per share are not included.

8. CALLED-UP SHARE CAPITAL

30.06.23
£
30.06.22
£
Allotted and fully paid

180,790,824 Ordinary shares of £0.001p each and
158,629,530 Deferred shares of £0.199 (30 June 2022:
158,916,429 ordinary shares of 20p each)
31,748,067 31,707,573

CONDOR GOLD PLC

NOTES TO THE CONDENSED FINANCIAL STATEMENTS
FOR THE SIX MONTHS TO 30 JUNE 2023

Share issuances in the six months ended 30 June 2023 were as follows:

Nature of issuance

Issue price per Ordinary share

Date of share issuance

Number of shares issued

Total Cumulative number of ordinary shares issued

Opening

1 January 2023

180,532,491

Bonus issue

24 pence

11 April 2023

258,333

180,790,824

During the period, there was a bonus issue of shares issued to the CEO, Mark Child as part of his remuneration package.

9. RELATED PARTY TRANSACTIONS

During the half year the Company received consultancy advice from the following related parties:
CompanyRelated party

Six

months to 30.06.2023

£

Six

months to 30.06.2022

£

Burnbrae LimitedJim Mellon

12,500

12,500

Burnbrae LimitedDenham Eke

7,500

-

Promaco Limited

AMC Geological Advisory

Ian Stalker

Andrew Cheatle

17,475

10,417

20,400

4,167

10. SEASONALITY OF THE GROUPS OPERATIONS

There are no seasonal factors which affect the trade of any company in the Group.

11. POST BALANCE SHEET EVENTS

In July 2023, £1,000,000 was raised as a result of an exercise in warrants. The warrants were exercised by the Chairman, Jim Mellon.

- Ends -

For further information please visit www.condorgold.com or contact:

Condor Gold plc
Mark Child, CEO
+44 (0) 20 7493 2784

Beaumont Cornish Limited
Roland Cornish and James Biddle
+44 (0) 20 7628 3396

SP Angel Corporate Finance
Ewan Leggat
LLP +44 (0) 20 3470 0470

H&P Advisory Limited
Andrew Chubb, Matt Hasson, Jay Ashfield
+44 207 907 8500

Adelaide Capital
(Investor Relations)

Deborah Honig
+1-647-203-8793

About Condor Gold plc:

Condor Gold plc was admitted to AIM in May 2006 and dual listed on the TSX in January 2018. The Company is a gold exploration and development company with a focus on Nicaragua.

The Company's principal asset is La India Project, Nicaragua, which comprises of a large, highly prospective land package of 588 sq km comprising of 12 contiguous and adjacent concessions. The Company has filed a feasibility study technical report dated 25 October 2022 and entitled "Condor Gold Technical Report on the La India Gold Project, Nicaragua, 2022" (the "2022 FS") which is available on the Company's SEDAR profile at www.sedar.com and was prepared in accordance with the requirements of NI 43-101. The 2022 FS indicated that La India Project hosts a high grade Mineral Resource Estimate ("MRE") of 9,672 kt at 3.5g/t gold for 1,088,000 oz gold in the indicated mineral resource category and 8,642 kt at 4.3 g/t gold for 1,190,000 oz gold in the inferred mineral resource category. The open pit MRE is 8,693 kt at 3.2 g/t gold for 893,000 oz gold in the indicated mineral resource category and 3,026 kt at 3.0 g/t gold for 291,000 oz gold in the inferred mineral resource category. Total underground MRE is 979 kt at 6.2 g/t gold for 94,000 oz gold in the indicated mineral resource category and 5,615 kt at 5.0 g/t gold for 98,000 oz gold in the inferred mineral resource category.

The 2022 FS replaces the previously reported Preliminary Economic Assessment ("PEA") as presented in the Technical Report filed on SEDAR in October 2021 as the current technical report for the La India project.

The 2021 PEA considered the expanded Project inclusive of the exploitation of the Mineral Resources associated to the La India, Mestiza, America and Central Breccia deposits. The strategic study covers two scenarios: Scenario A, in which the mining is undertaken from four open pits, termed La India, America, Mestiza and Central Breccia Zone ("CBZ"), which targets a plant feed rate of 1.225 million tonnes per annum ("Mtpa"); and Scenario B, where the mining is extended to CONDOR GOLD PLC. Registered in England and Wales No 5587987 Registered Office: 7/8 Innovation Place, Douglas Drive, Godalming, Surrey, GU7 1JX include three underground operations at La India, America and Mestiza, in which the processing rate is increased to 1.4 Mtpa. The 2021 PEA Scenario B presented a post-tax, post upfront capital expenditure NPV of US$418 million, with an IRR of 54% and 12 month pay-back period, assuming a US$1,700 per oz gold price, with average annual production of 150,000 oz gold per annum for the initial 9 years of gold production. The open pit mine schedules were optimised from designed pits, bringing higher grade gold forward resulting in average annual production of 157,000 oz gold in the first 2 years from open pit material and underground mining funded out of cashflow. The 2021 PEA Scenario A presented a post-tax, post upfront capital expenditure NPV of US$302 million, with an IRR of 58% and 12 month pay-back period, assuming a US$1,700 per oz gold price, with average annual production of approximately 120,000 oz gold per annum for the initial 6 years of gold production. The Mineral Resource estimate and associated Preliminary Economic Assessment contained in the 2021 PEA are considered a historical estimate within the meaning of NI 43-101, a qualified person has not done sufficient work to classify such historical estimate as current, and the Company is not treating the historical Mineral Resource estimate and associated studies as current, and the reader is cautioned not to rely upon this data as such. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The Company believes that the historical Mineral Resource estimate and Preliminary Economic assessment is relevant to the continuing development of the La India Project.

In August 2018, the Company announced that the Ministry of the Environment in Nicaragua had granted the Environmental Permit ("EP") for the development, construction and operation of a processing plant with capacity to process up to 2,800 tonnes per day at its wholly-owned La India gold Project ("La India Project"). The EP is considered the master permit for mining operations in Nicaragua. Condor has purchased a new SAG Mill, which has mainly arrived in Nicaragua. Site clearance and preparation is at an advanced stage.

Environmental Permits were granted in April and May 2020 for the Mestiza and America open pits respectively, both located close to La India. The Mestiza open pit hosts 92 Kt at a grade of 12.1 g/t gold (36,000 oz contained gold) in the Indicated Mineral Resource category and 341 Kt at a grade of 7.7 g/t gold (85,000 oz contained gold) in the Inferred Mineral Resource category. The America open pit hosts 114 Kt at a grade of 8.1 g/t gold (30,000 oz) in the Indicated Mineral Resource category and 677 Kt at a grade of 3.1 g/t gold (67,000 oz) in the Inferred Mineral Resource category. Following the permitting of the Mestiza and America open pits, together with the La India open pit Condor has 1.12 M oz gold open pit Mineral Resources permitted for extraction.

Disclaimer

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

Qualified Persons

The technical and scientific information in this press release has been reviewed, verified and approved by Andrew Cheatle, P.Geo., a director of Condor Gold plc, and Gerald D. Crawford, P.E., the Chief Technical Officer of Condor Gold plc, each of whom is a "qualified person" as defined by NI 43-101. CONDOR GOLD PLC. Registered in England and Wales No 5587987 Registered Office: 7/8 Innovation Place, Douglas Drive, Godalming, Surrey, GU7 1JX

Forward Looking Statements

All statements in this press release, other than statements of historical fact, are ‘forward-looking information' with respect to the Company within the meaning of applicable securities laws, including statements with respect to: future development and production plans, projected capital and operating costs, mine life and production rates, metal or mineral recovery estimates, Mineral Resource, Mineral Reserve estimates at the La India Project, the potential to convert Mineral Resources into Mineral Reserves. the Company's plans to sell the assets of the Company or seek alternatives to an asset sale and the construction timeline of the La India project upon receipt of financing. Forward-looking information is often, but not always, identified by the use of words such as: "seek", "anticipate", "plan", "continue", "strategies", "estimate", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", "could", "might", "will" and similar expressions. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions regarding: future commodity prices and royalty regimes; availability of skilled labour; timing and amount of capital expenditures; future currency exchange and interest rates; the impact of increasing competition; general conditions in economic and financial markets; availability of drilling and related equipment; effects of regulation by governmental agencies; the receipt of required permits; royalty rates; future tax rates; future operating costs; availability of future sources of funding; ability to obtain financing and assumptions underlying estimates related to adjusted funds from operations. Many assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct.

Such forward-looking information involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to: mineral exploration, development and operating risks; estimation of mineralisation and resources; environmental, health and safety regulations of the resource industry; competitive conditions; operational risks; liquidity and financing risks; funding risk; exploration costs; uninsurable risks; conflicts of interest; risks of operating in Nicaragua; government policy changes; ownership risks; permitting and licencing risks; artisanal miners and community relations; difficulty in enforcement of judgments; market conditions; stress in the global economy; current global financial condition; exchange rate and currency risks; commodity prices; reliance on key personnel; dilution risk; payment of dividends; as well as those factors discussed under the heading "Risk Factors" in the Company's annual information form for the fiscal year ended December 31, 2021 dated March 29, 2022 and available under the Company's SEDAR profile at www.sedar.com.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

SOURCE: Condor Gold plc



View source version on accesswire.com:
https://www.accesswire.com/781633/interim-report-and-accounts-for-the-six-months-ended-30-june-2023

CONDOR GOLD PLC

OTC:CNDGF

CNDGF Rankings

CNDGF Latest News

Dec 5, 2024
Rule 2.9 Announcement

CNDGF Stock Data

75.20M
121.05M
40.01%
1.48%
Gold
Basic Materials
Link
United States of America
Godalming