- Zero lost time injuries in Q3, demonstrating strong safety performance
- Gold production of 101,370 ounces in Q3, on track for the lower end of 2023 guidance range
- Revenue of US$200.4 million generated from gold sales of 103,807 ounces
- Cash costs of US$882/oz produced, targeting the lower half of the 2023 guidance range
- AISC of US$1,266/oz sold, targeting the lower half of the 2023 guidance range
- Capital expenditure of US$59.1 million, reflecting cost savings and accelerated projects
- Successful operation of Sukari 30MWAC solar plant for twelve months
- New Egyptian mining regulatory framework agreed in principle
- Strong and flexible balance sheet with available cash and liquid assets of US$126 million
- None.
QUARTERLY REPORT for the three months ended 30 September 2023 ("Q3")
PERTH, AUSTRALIA / ACCESSWIRE / October 19, 2023 / MARTIN HORGAN, CEO,commented: "We maintain our commitment to safety and are pleased to announce zero lost time injuries in the quarter. Operationally, the decision to complete the plant maintenance demonstrates our commitment to the long-term stewardship of Sukari and due to our operational flexibility 2023 production guidance is maintained.
Today's results reflect another period of disciplined cost management, putting us on target for the lower half of our 2023 cost guidance range. Our financial strength and the savings made against our 2023 budget have also given us the flexibility to accelerate some key 2024 capital expenditures into 2023 without impacting guidance."
HIGHLIGHTS
Strong cost performance
· Zero lost time injuries: There were no lost time injuries Q3 resulting in a lost time injury frequency ("LTIFR") of zero. The total recordable injury frequency rate ("TRIFR") was 3.83 per one million hours worked
· Gold production of 101,370 ounces - as published on 12 October 2023 - bringing the total gold production for the nine months of the year ("YTD") from the Sukari Gold Mine ("Sukari") to 321,931 oz and is on track for the lower end of the 2023 guidance range
· Revenue of US
· Cash costs of US
· All-in sustaining costs ("AISC") of US
· Capital expenditure ("capex") of US
· Sukari 30MWAC solar plant has been operating at nameplate levels for twelve months as of September, successfully displacing 22 million litres of diesel fuel with renewable power to reduce greenhouse gas ("GHG") emissions by approximately 59,000 tonnes of CO2-e
· Delivered the Sukari new life of mine plan on 12 October 2023 demonstrating the potential for increased long-term gold production, lower operational costs, reduced operational risk and significantly reduced carbon emissions (link to RNS here)
· New Egyptian mining regulatory framework agreed in principle establishing a clear, competitive exploitation structure for the development of new mining concessions. This framework will apply to commercial discoveries made on Centamin's highly prospective 3,000km2 Eastern Desert Exploration blocks ("EDX") (link to RNS here)
· Strong and flexible balance sheet with available cash and liquid assets of US
2023 OUTLOOK
Annual guidance on track
· Gold production guidance range of 450,000 to 480,000 oz per annum and targeting the lower end
· Cash cost guidance range of US
· Capex guidance is maintained at US
· Exploration spend is results-driven. 2023 exploration expenditure budget is US
KEY DELIVERABLES
· Group Mineral Resource and Reserve update (Q4 2023)
· Group Exploration Update (Q4 2023)
· Doropo Gold Project definitive feasibility study (mid-2024)
WEBCAST AND CONFERENCE CALL
The Company will host a webcast and conference call today, Thursday, 19 October 2023 at 08.30 BST to discuss the results, followed by an opportunity to ask questions.
Webcast link:https://www.investis-live.com/centamin/6515595de7d60c12002cfe2b/fgsw
Dial-in telephone numbers:
United Kingdom (and all other locations) +44 (0) 204 587 0498
United States +1 646 664 1960
Participation access code: 686280
PRINT-FRIENDLY VERSION of the announcement: www.centamin.com/media/companynews.
RESULTS SUMMARY
Q3 2023 | Q3 2022 | % Δ | Q2 2023 | % Δ | YTD | |
SAFETY | ||||||
LTIFR (1m hours) | 0.00 | 0.00 | 0.00 | 0.10 | ||
TRIFR (1m hours) | 3.83 | 1.69 | 3.40 | 3.43 | ||
OPEN PIT | ||||||
Total material mined (kt) | 31,655 | 35,647 | ( | 32,303 | ( | 96,956 |
Ore mined (kt) | 4,501 | 2,814 | 3,609 | 11,383 | ||
Ore grade mined (g/t Au) | 0.74 | 1.04 | ( | 0.90 | ( | 0.83 |
UNDERGROUND | ||||||
Ore mined (kt) | 245 | 210 | 222 | 703 | ||
Ore grade mined (g/t Au) | 4.61 | 6.2 | ( | 4.40 | 4.35 | |
PROCESSING | ||||||
Ore processed (kt) | 2,786 | 3,230 | ( | 3,076 | ( | 8.868 |
Feed grade (g/t Au) | 1.25 | 1.37 | ( | 1.26 | ( | 1.24 |
Gold recovery (%) | 88.5 | 87.9 | 88.3 | 88.5 | ||
Gold production (oz) | 101,370 | 127,512 | ( | 114,687 | ( | 321,931 |
COST & SALES | ||||||
Gold sold (oz) | 103,807 | 126,610 | ( | 111,693 | ( | 323,160 |
Cash cost (US$'000) | 89,399 | 103,447 | ( | 87,995 | 276,555 | |
Cash costs (US$/oz produced) | 882 | 811 | 767 | 859 | ||
AISC (US$'000) | 131,395 | 163,156 | ( | 124,299 | 400,855 | |
AISC (US$/oz sold) | 1,266 | 1,289 | ( | 1,113 | 1,240 | |
Realised gold price (US$/oz) | 1,927 | 1,720 | 1,969 | ( | 1,933 | |
FINANCIALS | ||||||
Revenue (US | 200,404 | 218,115 | ( | 220,386 | ( | 626,016 |
EBITDA (US | 99,005 | 100,630 | ( | 114,683 | ( | 292,420 |
Profit before-tax (US$'000) | 56,497 | 60,656 | ( | 70,434 | ( | 171,301 |
Capital expenditure (US$'000) | 59,089 | 74,892 | ( | 54,419 | 166,144 | |
Free cash flow (US$'000) | 12,422 | 10,666 | 14,027 | ( | 34,903 |
HEALTH AND SAFETY
We remain focussed on the protection of our workforce and the local communities where we operate. Our safety performance continues to be strong; while noting that our ultimate ambition is to create a zero-harm workplace. We had no lost time injuries in Q3 2023 across the Group. Notwithstanding, there has been an increase in low consequence, minor injuries. Proactive measures have been taken to understand these injuries, identify trends, and implement mitigations.
In Q3, the Group LTIFR was zero for Q3 and 0.10 per one million hours worked year to date ("YTD") and the Company is on track to meet the annual LTIFR target of 0.34. The Group TRIFR was 3.83 per one million hours worked, bringing YTD to 3.43, which is tracking ahead of the annual TRIFR target of 2.78.
SUKARI GOLD MINE, EGYPT
(Q3 2023 vs Q3 2022)
Production
Sukari gold production for Q3 totalled 101,370 oz (YTD: 321,931), a
Open Pit Mining
Total material moved (waste and ore) of 31.7Mt, a
Total open pit waste material mined for the quarter was 27.2Mt, at
During Q3, open pit ore was mined from multiple working areas, with contributions from Stage 5 North, East, West and Stage 7. Total open pit ore mined for the quarter was 4.5Mt, a
During the quarter, the low-grade stockpiles increased by 363kt to 17.8Mt at an average grade of 0.45g/t Au.
Underground Mining
Total material mined (waste and ore) was 359kt, a
The underground ore was made up of 161kt of ore mined from stopes, at an average grade of 5.31g/t Au, and 83kt of ore mined from development, at an average grade of 3.24g/t Au.
Processing
The plant processed 2.8Mt of ore, a
The metallurgical gold recovery rate was
Sukari Mining Concession ("SMC") Exploration
Brownfield exploration across the 160km2 Sukari Concession amounted to US
Work focused on the development of additional Mineral Resources within the SMC that can be converted to Mineral Reserves and incorporated into the mine plan. In Q3, a total of 10,864 metres were drilled across a number of targets, including at V Shear East, Wadi Alam, Quartz Ridge and ARC prospects.
CAPITAL EXPENDITURE
Key capital projects progressed well during Q3, with activities focussed around underground development, tailings storage facility 2, equipment rebuilds and the contracted waste-stripping programme.
The total capex in Q3 was US
Q3 2023 | YTD | |
Underground exploration | 2.6 | 8.0 |
Underground mine development | 9.6 | 25.6 |
Rebuilds, underground transition and other sustaining capex | 12.3 | 31.3 |
Sustaining element of waste stripping capitalised[1] | 2.6 | 12.6 |
SUSTAINING CAPEX | 27.1 | 77.4 |
Underground paste-fill plant, North dump leach & tailings storage facility | 8.8 | 19.5 |
Contract waste stripping capitalised | 19.1 | 63.4 |
Other non-sustaining capex | 4.1 | 5.8 |
NON-SUSTAINING CAPEX | 32.0 | 88.7 |
TOTAL CAPEX | 59.1 | 166.1 |
Less: | ||
Sustaining element of waste stripping capitalised1 | (2.6) | (12.6) |
ADJUSTED CAPEX (after reclassification) | 56.5 | 153.5 |
The 2023 capital expenditure guidance remains unchanged at US
However, forecasted annual capital cost savings of US
Forecasted 2023 capital savings of approximately US
· Lower overall open pit mining costs resulting from fuel savings
· Optimised open pit fleet management strategy, as per the new Sukari life of mine plan
Partially offset by:
· 2023 contracted waste-stripping outperformance is expected to result in
Accelerated capital spend into 2023:
· US
· US
SALES AND COSTS
Gold sales for the quarter were 103,807 oz, a
Cash costs of production were US
Total all-in sustaining costs ("AISC") were US
EXPLORATION PROJECTS
The total greenfield exploration spend for the quarter was US
Doropo Project, Côte d'Ivoire
During Q3, fieldwork continued at Doropo, including infill drilling within the main resource cluster and testing regional deposits outside the existing project resource. Total spend in the quarter amounted to US
· 997 metres of core infill and twin hole drilling at the Vako, Sanbayoro and Attire prospects
· 24,938 metres of reverse circulation pulp samples were analysed using an X-ray fluorescence ("XRF") machine
The DFS and ESIA work continued and is expected to be completed by June 2024.
Eastern Desert Exploration ("EDX"), Egypt
During Q3, the focus was on advancing our maiden drill programme on the Nugrus block, adjacent to the Sukari mining concession. The initial 10,000 metre drill programme was increased to 15,000 metres with the identification of additional drill targets:
· 10,910 metres of exploration drilling was completed in Q3
· Drilling focussed on eight targets which were identified through an comprehensive fieldwork programme
· The programme is scheduled for completion in October and assay results are expected to be received in Q4 2023
Regional fieldwork work continued across all three concession blocks, including soil and rock chip sampling on the Nugrus block, planning of the Najd block BLEG sampling programme is underway, and at the Um Rus we prepared to undertake soil surveys during Q4.
FINANCIAL POSITION
Free Cash Flow
Under the terms of the Sukari Concession Agreement, the Egyptian government earned US
Balance Sheet
Centamin is in a strong financial position, with cash and liquid assets to US
Liquidity
30 September 2023 (US$m) | |
Cash on hand | 78.5 |
Bullion on hand | 22.9 |
Gold sales receivable | 13.6 |
Financial assets at fair value through profit or loss* | 10.6 |
TOTAL CASH & LIQUID ASSETS | 125.7 |
Sustainability-linked revolving credit facility (undrawn) | 150.0 |
TOTAL LIQUIDITY | 275.7 |
*The financial assets at fair value through profit or loss relate to the open gold put options purchased by the Company in FY2022 as part of the gold price protection programme
ABOUT CENTAMIN
Centamin is an established gold producer, with a premium listing on the London Stock Exchange and a secondary listing on the Toronto Stock Exchange. The Company's flagship asset is the Sukari Gold Mine ("Sukari"), Egypt's largest and first modern gold mine, as well as one of the world's largest producing mines. Since production began in 2009 Sukari has produced over 5 million ounces of gold, and today has 6.0Moz in gold Mineral Reserves. Through its large portfolio of exploration assets in Egypt and Côte d'Ivoire, Centamin is advancing an active pipeline of future growth prospects, including the Doropo project in Côte d'Ivoire, and has over 3,000km2 of highly prospective exploration ground in Egypt's Nubian Shield.
Centamin recognises its responsibility to deliver operational and financial performance and create lasting mutual benefit for all stakeholders through good corporate citizenship, including but not limited to in 2022, achieving new safety records; commissioning of the largest hybrid solar farm for a gold mine; sustaining a +
FOR MORE INFORMATION please visit the website www.centamin.com or contact:
Centamin plc | FTI Consulting |
ENDNOTES
Guidance
The Company actively monitors the global geopolitical uncertainties and macroeconomics, such as global inflation, and guidance may be impacted if the supply chain, workforce or operations are disrupted.
Non-GAAP measures
This statement includes certain financial performance measures which are not GAAP measures as defined under International Financial Reporting Standards (IFRS). These include EBITDA and adjusted EBITDA, Cash costs of production, AISC, Cash and liquid assets, Free cash flow and adjusted Free cash flow. Management believes these measures provide valuable additional information for users of the financial statements to understand the underlying trading performance.
Royalties
Royalties are accrued and paid six months in arrears.
Cash and liquid assets
Cash and liquid assets include cash, bullion on hand and gold sales receivables.
Liquidity
Liquidity is defined as the sum of cash and cash equivalents and available Company credit.
Gold produced
Gold produced is gold poured and does not include gold-in-circuit at period end.
FORWARD-LOOKING STATEMENTS
This announcement (including information incorporated by reference) contains "forward-looking statements" and "forward-looking information" under applicable securities laws (collectively, "forward-looking statements"), including statements with respect to future financial or operating performance. Such statements include "future-oriented financial information" or "financial outlook" with respect to prospective financial performance, financial position, EBITDA, cash flows and other financial metrics that are based on assumptions about future economic conditions and courses of action. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "believes", "expects", "expected", "budgeted", "forecasts" and "anticipates" and include production outlook, operating schedules, production profiles, expansion and expansion plans, efficiency gains, production and cost guidance, capital expenditure outlook, exploration spend and other mine plans. Although Centamin believes that the expectations reflected in such forward-looking statements are reasonable, Centamin can give no assurance that such expectations will prove to be correct. Forward-looking statements are prospective in nature and are not based on historical facts, but rather on current expectations and projections of the management of Centamin about future events and are therefore subject to known and unknown risks and uncertainties which could cause actual results to differ materially from the future results expressed or implied by the forward-looking statements. In addition, there are a number of factors that could cause actual results, performance, achievements or developments to differ materially from those expressed or implied by such forward-looking statements; the risks and uncertainties associated with direct or indirect impacts of COVID-19 or other pandemic, general business, economic, competitive, political and social uncertainties; the results of exploration activities and feasibility studies; assumptions in economic evaluations which prove to be inaccurate; currency fluctuations; changes in project parameters; future prices of gold and other metals; possible variations of ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; climatic conditions; political instability; decisions and regulatory changes enacted by governmental authorities; delays in obtaining approvals or financing or completing development or construction activities; and discovery of archaeological ruins. Financial outlook and future-ordinated financial information contained in this news release is based on assumptions about future events, including economic conditions and proposed courses of action, based on management's assessment of the relevant information currently available. Readers are cautioned that any such financial outlook or future-ordinated financial information contained or referenced herein may not be appropriate and should not be used for purposes other than those for which it is disclosed herein. The Company and its management believe that the prospective financial information has been prepared on a reasonable basis, reflecting management's best estimates and judgments at the date hereof, and represent, to the best of management's knowledge and opinion, the Company's expected course of action. However, because this information is highly subjective, it should not be relied on as necessarily indicative of future results. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information or statements, particularly in light of the current economic climate and the significant volatility, the risks and uncertainties associated with the direct and indirect impacts of COVID-19. Forward-looking statements contained herein are made as of the date of this announcement and the Company disclaims any obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements.
LEI: 213800PDI9G7OUKLPV84
Company No: 109180
[1] Reclassified from operating expenditure, from 2021, the Company implemented a more granular methodology to the accounting and classification of waste-stripping costs, in line with IFRS accounting standards. As such, there is an accounting reclassification of open pit waste mining costs, resulting in a reduction in total cash costs with a corresponding equal increase in the sustaining expenditure and therefore AISC, with no impact on net cash flow.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
SOURCE: Centamin PLC
View source version on accesswire.com:
https://www.accesswire.com/794474/centamin-plc-announces-quarterly-report
FAQ
What were the safety results in Q3?
What was the gold production in Q3?
What were the cash costs and AISC in Q3?
What was the capital expenditure in Q3?
What is the status of the Sukari solar plant?