Core Assets Drills 5.64m of 254g/t Ag, 9.9% Pb+Zn, 0.11% Cu and 0.12g/t Au Including 424g/t Ag, 17.4% Pb+Zn, 0.20% Cu, and 0.14g/t Au Over 3.15m at the Blue Property
Core Assets Corp. announced assay results from their 2022 exploration program at the Silver Lime and Laverdiere projects in British Columbia. The Grizzly CRD Target revealed significant high-grade mineralization, with noteworthy intersections including 5.64m of 659g/t AgEq from SLM22-011 and 2.23m of 124g/t AgEq from SLM22-009. The Sulphide City Target demonstrated widespread porphyry Mo mineralization, featuring results such as 4.51m of 172g/t AgEq from SLM22-005. Core Assets plans to initiate a targeted drilling program this year, aiming to expand on their new discoveries. CEO Nick Rodway expressed confidence in the transformative potential of the 2023 exploration season for shareholders.
- Significant high-grade mineralization found at Grizzly CRD Target, including 5.64m of 659g/t AgEq.
- Widespread porphyry Mo mineralization identified at Sulphide City Target.
- Plans for a fully funded targeted CRD drilling program in the upcoming months.
- No direct negative aspects mentioned.
To view a video presentation based on today's news release by CEO Nick Rodway, Click HERE
Link: https://youtu.be/bCDOrTNa72k
VANCOUVER, BC / ACCESSWIRE / March 29, 2023 / Core Assets Corp., ("Core Assets" or the "Company") (CSE:CC) (FSE:5RJ) (OTCQB:CCOOF) is pleased to announce assay results from the remaining diamond drill holes completed during the 2022 exploration program at the Silver Lime Porphyry-CRD Project (the "Silver Lime Project" or "Silver Lime") and the Laverdiere Skarn-Porphyry Project (the "Laverdiere Project" or "Laverdiere") at the Blue Property (the " Blue Property") located in the Atlin Mining District of NW British Columbia.
A total of 1,497 metres of diamond drilling were completed at the Grizzly CRD Target in 2022. First-pass diamond drilling at the Grizzly Target intersected significant near surface, high-grade carbonate replacement mineralization (Figures 1-2; Tables 1, 3).
Grizzly CRD Target Highlights
- SLM22-011 intersected 5.64m of 659g/t AgEq (254g/t Ag,
5.1% Pb,4.8% Zn,0.11% Cu and 0.12g/t Au) from 57.36m core depth including 3.15m of 1,132g/t AgEq (424g/t Ag,9.1% Pb,8.3% Zn,0.20% Cu, and 0.14g/t Au), and extending the previously rushed carbonate replacement massive sulphide intercept which included 1.16m of 3,056g/t AgEq (1,145g/t Ag,23.2% Pb,23.5% Zn,0.52% Cu, and 0.37g/t Ag) from 58.54m depth. - SLM22-010 intersected 2m of 218g/t AgEq (99g/t Ag,
0.4% Pb,1.8% Zn, and0.5% Cu) from 276m depth, including 0.90m of 287g/t AgEq (141g/t Ag,0.5% Pb,2.5% Zn, and0.14% Cu). - SLM22-009 intersected 2.23m of 124g/t AgEq (63g/t Ag,
0.6% Pb, and0.9% Zn) from 143m depth, including 0.73m of 375g/t AgEq (192g/t Ag,1.9% Pb, and2.6% Zn). - All drill intercepts remain open in multiple directions and at depth (down-dip).
Core Assets' President & CEO Nick Rodway commented: "The first ever drill season at the Silver Lime and Laverdiere projects have yielded remarkable results - confirming the presence of large, well-mineralized porphyry-skarn and CRD systems. Data collected in 2022 will allow us to execute a targeted, fully funded-CRD focused drilling program which will begin in the next few months. As we begin to demonstrate continuity in our new discoveries, we plan to step out into thicker limestone sequences to the northwest of Silver Lime and test the additional >250 CRD occurrences that have been mapped at surface. We are confident that the 2023 exploration season will be transformational for the company and its shareholders."
Table 1: 2022 Assay Highlights from the Grizzly CRD Target | |||||||||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Pb % | Zn % | Cu % | Au g/t | Ag Eq |
SLM22-011 | 57.36 | 63.00 | 5.64 | 254 | 5.1 | 4.8 | 0.11 | 0.12 | 659 |
Including | 57.36 | 60.51 | 3.15 | 424 | 9.1 | 8.3 | 0.20 | 0.14 | 1132 |
and | 58.54 | 59.70 | 1.16 | 1145 | 23.2 | 23.5 | 0.52 | 0.37 | 3056 |
SLM22-010 | 134.04 | 135.22 | 1.18 | 50 | 0.7 | 0.9 | 0.05 | - | 120 |
SLM22-010 | 276.00 | 278.00 | 2.00 | 99 | 0.4 | 1.8 | 0.18 | - | 217 |
Including | 277.10 | 278.00 | 0.90 | 141 | 0.5 | 2.5 | 0.14 | - | 287 |
SLM22-009 | 124.16 | 125.75 | 1.59 | 33 | 1.2 | 0.6 | - | - | 101 |
Including | 124.66 | 125.75 | 1.09 | 50 | 1.9 | 0.9 | - | - | 153 |
SLM22-009 | 143.00 | 145.23 | 2.23 | 63 | 0.6 | 0.9 | - | - | 123 |
Including | 144.50 | 145.23 | 0.73 | 192 | 1.9 | 2.6 | - | - | 372 |
Assay results are presented as uncut weighted averages and assume
Figure 1: Schematic cross-section looking north through the Grizzly CRD Target at the Silver Lime Project showing 2022 drilling assay highlights intercepts (AgEq) in relation to the inferred depth extent of mineralization targeted during the 2022 drilling program.
A total of 2,769 metres of diamond drilling were completed at the Sulphide City Porphyry-Skarn Target in 2022. First-pass diamond drilling intersected widespread and consistent porphyry Molybdenum (Mo) mineralization, local high grade porphyry Mo veining, and massive sulphide Zn-rich skarn mineralization.
Sulphide City Porphyry-Skarn Target Highlights
- SLM22-005 intersected 4.51m of 172g/t AgEq (50g/t Ag,
2.5% Zn,0.3% Pb, and0.1% Cu) from 32.70m depth, including 0.56m of 709g/t AgEq (148g/t Ag,12.1% Zn,0.4% , and0.2% Cu). - SLM22-006 returned 99.82m of
0.016% Mo from 322m depth, including 10.82m of0.043% Mo and 0.63m of0.385% Mo. - SLM22-007 intersected 1.26m of 389g/t AgEq and
3.06% CuEq (91g/t Ag,1.5% Zn,1.5% Pb, and1.4% Cu) from 56.91m depth, and 1.17m of11.3% Zn, 9g/t Ag, and0.1% Cu from 96.15m depth. - SLM22-008 intersected 1m of
4.23% Zn, 7g/t Ag, and0.2% Cu from 219.6m depth. - SLM22-013 returned 0.53m of
9% Zn from 242.78m depth. - SLM22-014 intersected 14.53m of
0.029% Mo from 266m depth, within 101.38m grading0.013% Mo and including 2m of0.137% Mo from 277m depth. - SLM22-015 returned 147.45m of
0.012% Mo from 190.05m depth, within 350m grading0.008% Mo and including 2m of0.075% Mo from 216m depth.
Figure 2: Schematic plan view map of the Grizzly and Sulphide City targets at the Silver Lime Project showing 2022 drilling locations, Ag (g/t) in surface samples, downhole Mo % (Sulphide City) and Ag g/t (Grizzly - Red Star) assay highlights. *indicates steeply dipping drillhole.
Table 2: 2022 Assay Highlights from the Sulphide City Porphyry-Skarn Target | ||||||||||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-005 | 32.70 | 37.21 | 4.51 | 50 | - | 0.3 | 2.5 | 0.002 | 172 | |
Including | 35.52 | 37.21 | 1.69 | 111 | - | 0.5 | 5.0 | - | 355 | |
and | 36.65 | 37.21 | 0.56 | 148 | 0.17 | 0.4 | 12.1 | - | 709 | |
SLM22-005 | 59.00 | 62.00 | 3.00 | 4 | - | - | 4.0 | 0.002 | ||
Including | 60.04 | 60.60 | 0.56 | 7 | - | - | 12.1 | 0.003 | ||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-006 | 74.02 | 86.36 | 12.34 | 4 | 0.11 | - | 0.7 | 0.006 | ||
Including | 74.02 | 76.00 | 1.98 | 11 | 0.33 | - | 3.7 | 0.004 | 1.75 | |
and | 75.00 | 76.00 | 1.00 | 19 | 0.57 | - | 5.9 | 0.003 | 2.79 | |
SLM22-006 | 277.00 | 470.00 | 193.00 | 2 | - | - | - | 0.012 | ||
Including | 322.00 | 421.82 | 99.82 | 0 | - | - | - | 0.016 | ||
411.00 | 421.82 | 10.82 | 2 | - | - | 0.1 | 0.043 | |||
417.00 | 420.50 | 3.50 | 1 | - | - | - | 0.100 | |||
418.82 | 419.45 | 0.63 | 0 | - | - | - | 0.385 | |||
447.75 | 470.00 | 22.25 | 12 | 0.10 | 0.1 | 0.2 | 0.007 | |||
447.75 | 456.39 | 8.64 | 23 | 0.15 | 0.2 | 0.5 | 0.001 | 69 | ||
453.09 | 456.39 | 3.30 | 47 | 0.25 | 0.3 | 1.0 | 0.002 | 134 | 1.06 | |
453.09 | 455.00 | 1.91 | 61 | 0.25 | 0.6 | 1.5 | - | 180 | 1.40 | |
and | 453.09 | 453.76 | 0.67 | 117 | 0.37 | 1.3 | 2.6 | - | 322 | 2.50 |
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-007 | 33.24 | 34.45 | 1.21 | 6 | - | - | 6.8 | - | ||
SLM22-007 | 44.14 | 58.17 | 14.03 | 11 | 0.16 | 0.1 | 1.1 | 0.005 | ||
Including | 50.89 | 58.17 | 7.28 | 16 | 0.23 | 0.2 | 1.5 | 0.007 | 0.99 | |
50.89 | 55.00 | 4.11 | 6 | - | - | 1.7 | 0.010 | |||
and | 56.91 | 58.17 | 1.26 | 91 | 1.39 | 1.5 | 1.5 | 0.007 | 389 | 3.06 |
SLM22-007 | 96.12 | 110.63 | 14.51 | 3 | - | - | 1.8 | 0.002 | ||
Including | 96.12 | 97.29 | 1.17 | 9 | 0.13 | - | 11.3 | - | ||
and | 96.12 | 98.25 | 2.13 | 6 | 0.10 | - | 6.5 | - | ||
SLM22-007 | 297.00 | 299.05 | 2.05 | 10 | 0.16 | - | 1.3 | 0.008 | ||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-008 | 151.93 | 153.00 | 1.07 | 11 | 0.24 | - | 4.5 | 0.007 | ||
SLM22-008 | 219.60 | 220.60 | 1.00 | 7 | 0.18 | - | 4.2 | 0.001 | ||
SLM22-008 | 280.32 | 281.45 | 1.13 | 9 | 0.18 | 0.10 | 11.9 | - | ||
SLM22-008 | 306.67 | 309.00 | 2.33 | 3 | - | - | 5.3 | - | ||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-013 | 76.50 | 77.50 | 1.00 | 10 | 0.20 | - | - | 0.014 | 0.38 | |
SLM22-013 | 171.13 | 171.86 | 0.73 | 40 | 1.77 | 0.1 | 0.1 | 0.002 | 277 | 2.16 |
SLM22-013 | 234.62 | 235.80 | 1.18 | 12 | 0.16 | 0.1 | 1.1 | 0.002 | ||
SLM22-013 | 242.78 | 243.31 | 0.53 | 2 | - | - | 9.0 | - | ||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-014 | 188.00 | 289.38 | 101.38 | 0.3 | - | - | - | 0.013 | ||
Including | 268.00 | 280.53 | 12.53 | 1 | - | - | - | 0.029 | ||
273.39 | 287.00 | 13.61 | 0.8 | - | - | - | 0.026 | |||
and | 277.00 | 279.00 | 2.00 | 0.5 | - | - | - | 0.137 | ||
SLM22-014 | 401.00 | 406.05 | 5.05 | 0.3 | - | - | - | 0.031 | ||
Including | 405.00 | 406.05 | 1.05 | 0.3 | - | - | - | 0.102 | ||
Hole | From (m) | To (m) | Interval (m) | Ag g/t | Cu % | Pb % | Zn % | Mo % | AgEq | CuEq |
SLM22-015 | 51.50 | 57.00 | 5.50 | 5 | 0.09 | 0.1 | 0.2 | - | ||
Including | 53.00 | 55.00 | 2.00 | 13 | 0.19 | 0.2 | 0.4 | - | ||
SLM22-015 | 121.00 | 471.00 | 350.00 | 0.2 | - | - | - | 0.008 | ||
Including | 190.05 | 337.50 | 147.45 | 0.1 | - | - | - | 0.012 | ||
216.00 | 218.00 | 2.00 | 0.2 | - | - | - | 0.075 | |||
259.72 | 279.00 | 19.28 | 0.1 | - | - | - | 0.020 | |||
and | 261.00 | 268.00 | 7.00 | 0.1 | - | - | - | 0.027 |
Assay results are presented as uncut weighted averages and assume
Table 3: 2022 Diamond Drilling Data - Sulphide City and Grizzly Targets | |||||||
DDH | Target | Easting (m) | Northing (m) | Elevation (m) | Azimuth | Dip | DDH Depth |
SLM22-005 | Sulphide City Target | 536735 | 6558664 | 1645 | 0 | -45 | 137 |
SLM22-006 | Sulphide City Target | 536735 | 6558658 | 1645 | 0 | -90 | 470 |
SLM22-007 | Sulphide City Target | 536735 | 6558661 | 1645 | 0 | -60 | 416 |
SLM22-008 | Sulphide City Target | 536738 | 6558659 | 1645 | 60 | -45 | 461 |
SLM22-009 | Grizzly Target | 537176 | 6558673 | 1846 | 178 | -50 | 387 |
SLM22-010 | Grizzly Target | 537175 | 6558674 | 1846 | 240 | -65 | 422 |
SLM22-011 | Grizzly Target | 537175 | 6558674 | 1846 | 260 | -65 | 338 |
SLM22-012 | Grizzly Target | 537175 | 6558674 | 1846 | 300 | -55 | 350 |
SLM22-013 | Sulphide City Target | 536732 | 6558656 | 1645 | 225 | -45 | 400 |
SLM22-014 | Sulphide City Target | 536737 | 6558656 | 1645 | 150 | -50 | 414 |
SLM22-015 | Sulphide City Target | 536735 | 6558656 | 1645 | 185 | -50 | 471 |
A total of 1,806 metres of diamond drilling were completed at the Laverdiere Skarn-Porphyry Project in 2022. First-pass diamond drilling intersected significant near surface, high-grade Fe-Cu-Au-Mo skarn mineralization associated with a potassically altered porphyry intrusion containing widespread porphyry Cu-Mo-Au mineralization and veining (Figure 3; Tables 4-5).
Laverdiere Skarn-Porphyry Project Highlights
- LAV22-001 intersected 48.54m of
1.02% CuEq (0.90% Cu, 6g/t Ag, and 0.11g/t Ag) from 31.46m, including 0.60m of5.51% CuEq (5% Cu, 33g/t Ag, and 0.36 g/t Au) from 42.15m depth. - LAV22-001 also intersected 1.51m of 4.59g/t Au from 163.49m depth in the Llewellyn Fault Zone (LFZ)
- LAV22-002 returned 223m of
0.20% CuEq (0.11% Cu, 2g/t Ag, and0.006% Mo) from 15.00m depth, including 79m of0.26% CuEq, and 24.42m of0.50% CuEq. - LAV22-003 returned 30.49m of
0.22% CuEq (0.12% Cu, 2g/t Ag, 0.03 g/t Au, and009% Mo) from 4.51m depth. - LAV22-004 intersected 7.66m of
0.24% Cu,0.014% Mo, 3.4g/t Ag, and 0.07g/t Au from 222m depth, including 2.46m of0.37% Cu,0.022% Mo, 6.6g/t Ag, and 0.21g/t Au from 227.2m depth. - LAV22-005 returned 83.22m of
0.016% Mo,0.12% Cu, 0.8g/t Ag, and 0.03g/t Au (0.27% CuEq) including 31.08m of0.042% Mo, and 6.2m of0.105% Mo from 6.9m depth. - LAV22-006 intersected 348.65m of 0.010 % Mo from 3.35m depth, including 183m of
0.018% Mo, 11m of0.092% Mo (0.13% Cu, 5g/t Ag (0.84% CuEq), and 5.5m of0.11% Mo. - LAV22-006 also returned 107.38m of 0.31 CuEq (
0.11% Cu,0.023% Mo, 0.9g/t Au, and 0.02g/t Au) from 144.62m depth, including 41m of0.60% CuEq (0.27% Cu,0.037% Mo, 2g/t Ag, and 0.05g/t Au), and 0.9m of6.09% CuEq (5.08% Cu, 23g/t Ag, 1.25g/t Au) from 166.64m depth.
Table 4: 2022 Assay Highlights from the Laverdiere Skarn-Porphyry Project | ||||||||
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-001* | 0.95 | 268.00 | 267.05 | 0.04 | 1 | 0.17 | 0.21 | |
LAV22-001* | 0.95 | 96.00 | 95.05 | 0.06 | 3 | 0.47 | 0.54 | |
Including | 31.46 | 80.00 | 48.54 | 0.11 | 6 | 0.90 | 1.02 | |
42.15 | 42.75 | 0.60 | 0.36 | 33 | 5.01 | 5.51 | ||
and | 78.00 | 78.70 | 0.70 | 0.25 | 13 | 2.24 | 2.51 | |
LAV22-001* | 163.49 | 165.00 | 1.51 | 4.59 | 0.4 | - |
| |
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-002* | 2.98 | 402.30 | 399.32 | 0.03 | 1 | 0.07 | 0.003 | 0.12 |
LAV22-002* | 15.00 | 238.00 | 223.00 | 0.05 | 2 | 0.11 | 0.006 | 0.20 |
LAV22-002* | 20.35 | 21.85 | 1.50 | 0.34 | 22 | 1.08 | 0.007 | 1.52 |
Including | 20.35 | 20.92 | 0.57 | 0.20 | 53 | 2.74 | 0.000 | 3.28 |
LAV22-002* | 63.67 | 110.00 | 46.33 | - | 0.8 | 0.08 | 0.022 | 0.25 |
Including | 64.74 | 65.82 | 1.08 | - | 0.3 | - | 0.100 |
|
82.53 | 83.32 | 0.79 | 0.02 | 0.3 | - | 0.316 |
| |
And | 84.85 | 86.68 | 1.83 | - | 0.5 | - | 0.103 |
|
LAV22-002* | 102.00 | 110.00 | 8.00 | 0.05 | 3 | 0.43 | - | 0.49 |
Including | 102.00 | 106.00 | 4.00 | 0.09 | 5 | 0.80 | - | 0.90 |
and | 104.00 | 106.00 | 2.00 | 0.30 | 19 | 3.01 | - | 3.36 |
LAV22-002* | 159.00 | 238.00 | 79.00 | 0.10 | 3 | 0.16 | 0.002 | 0.26 |
Including | 159.00 | 177.24 | 18.24 | 0.16 | 3 | 0.19 | 0.001 | 0.33 |
159.00 | 159.70 | 0.70 | 1.15 | 11 | 0.68 | - | 1.54 | |
173.00 | 227.00 | 54.00 | 0.12 | 3 | 0.19 | 0.002 | 0.31 | |
173.00 | 175.00 | 2.00 | 1.66 | 11 | 0.75 | 0.020 | 2.10 | |
207.23 | 231.65 | 24.42 | 0.16 | 4 | 0.32 | 0.005 | 0.50 | |
207.23 | 222.00 | 14.77 | 0.25 | 6 | 0.41 | 0.003 | 0.65 | |
207.23 | 209.00 | 1.77 | 2.05 | 24 | 1.13 | 0.001 | 2.71 | |
221.00 | 222.00 | 1.00 | 0.21 | 5 | 1.07 | - | 1.25 | |
224.00 | 227.00 | 3.00 | 0.04 | 2 | 0.40 | 0.011 | 0.53 | |
224.00 | 225.50 | 1.50 | 0.09 | 6 | 0.92 | 0.029 | 1.24 | |
and | 225.50 | 229.17 | 3.67 | 0.04 | 2 | 0.39 | 0.020 | 0.58 |
LAV22-002* | 297.50 | 300.16 | 2.66 | 0.13 | 2 | 0.14 | - | 0.24 |
Including | 297.50 | 298.10 | 0.60 | 0.55 | 5 | 0.26 | - | 0.67 |
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-003 | 4.51 | 35.00 | 30.49 | 0.03 | 2 | 0.12 | 0.009 | 0.22 |
LAV22-003 | 53.23 | 62.00 | 8.77 | - | 1 | 0.10 | 0.006 | 0.16 |
LAV22-003 | 104.70 | 105.35 | 0.65 | 0.09 | 7 | 0.90 | 0.005 | 1.06 |
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-004 | 169.73 | 172.00 | 2.27 | 0.23 | 4 | 0.24 | 0.001 | 0.44 |
LAV22-004 | 222.00 | 229.66 | 7.66 | 0.07 | 3 | 0.18 | 0.014 | 0.37 |
Including | 227.20 | 229.66 | 2.46 | 0.21 | 7 | 0.37 | 0.022 | 0.72 |
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-005 | 0.00 | 175.00 | 175.00 | 0.02 | 0.5 | 0.06 | 0.008 |
|
LAV22-005 | 6.90 | 90.12 | 83.22 | 0.03 | 0.8 | 0.12 | 0.016 | 0.27 |
Including | 6.90 | 15.36 | 8.46 | 0.09 | 3 | 0.63 | 0.001 | 0.72 |
and | 6.90 | 8.29 | 1.39 | 0.25 | 10 | 1.98 | 0.002 | 2.24 |
LAV22-005 | 12.00 | 90.12 | 78.12 | 0.03 | 0.7 | 0.10 | 0.018 | 0.25 |
Including | 12.00 | 15.36 | 3.36 | 0.15 | 5 | 0.98 | 0.001 | 1.13 |
14.00 | 15.36 | 1.36 | 0.16 | 5 | 1.24 | 0.001 | 1.40 | |
59.04 | 90.12 | 31.08 | - | 0.3 | 0.03 | 0.042 |
| |
50.34 | 57.00 | 6.66 | 0.09 | 2 | 0.34 | 0.001 | 0.42 | |
69.00 | 75.20 | 6.20 | - | 0.3 | - | 0.105 |
| |
70.00 | 72.00 | 2.00 | - | 0.5 | - | 0.216 |
| |
and | 86.00 | 88.00 | 2.00 | - | 0.5 | - | 0.255 |
|
DDH | From (m) | To (m) | Interval (m) | Au g/t | Ag g/t | Cu % | Mo % | CuEq |
LAV22-006 | 3.35 | 352.00 | 348.65 | - | 0.5 | 0.06 | 0.010 |
|
LAV22-006 | 69.00 | 252.00 | 183.00 | 0.02 | 0.9 | 0.09 | 0.018 |
|
Including | 69.00 | 73.00 | 4.00 | - | 0.9 | 0.05 | 0.105 |
|
144.62 | 252.00 | 107.38 | 0.02 | 0.9 | 0.11 | 0.023 | 0.31 | |
152.00 | 193.00 | 41.00 | 0.05 | 2 | 0.27 | 0.037 | 0.60 | |
166.64 | 193.00 | 26.36 | 0.06 | 2 | 0.34 | 0.049 | 0.77 | |
166.64 | 167.54 | 0.90 | 1.25 | 23 | 5.08 | - | 6.09 | |
170.02 | 193.00 | 22.98 | - | 2 | 0.16 | 0.056 | 0.59 | |
170.02 | 170.92 | 0.90 | 0.06 | 7 | 1.87 | - | 1.97 | |
177.00 | 193.00 | 16.00 | - | 2 | 0.09 | 0.072 |
| |
177.00 | 188.00 | 11.00 | - | 2 | 0.13 | 0.092 | 0.84 | |
177.00 | 178.00 | 1.00 | - | 0.1 | - | 0.301 |
| |
184.00 | 188.00 | 4.00 | 0.02 | 3.2 | 0.21 | 0.146 | 1.34 | |
186.61 | 188.00 | 1.39 | - | 5 | 0.33 | 0.211 | 1.96 | |
191.80 | 193.00 | 1.20 | - | 0.2 | - | 0.108 |
| |
246.50 | 252.00 | 5.50 | - | 0.3 | - | 0.110 |
| |
and | 251.04 | 252.00 | 0.96 | - | 0.8 | 0.03 | 0.425 |
|
Assay results are presented as uncut weighted averages and assume
Table 5: 2022 Diamond Drilling Data - Laverdiere Skarn-Porphyry Project | |||||||
DDH | Target | Easting (m) | Northing (m) | Elevation (m) | Azimuth | Dip | DDH Depth |
LAV22-001 | Laverdiere | 550182 | 6565256 | 728 | 90 | -80 | 268 |
LAV22-002 | Laverdiere | 550181 | 6565253 | 728 | 210 | -50 | 402.3 |
LAV22-003 | Laverdiere | 550296 | 6565057 | 717 | 210 | -45 | 300 |
LAV22-004 | Laverdiere | 550296 | 6565061 | 717 | 270 | -60 | 309 |
LAV22-005 | Laverdiere | 550295 | 6565061 | 717 | 270 | -45 | 175 |
LAV22-006 | Laverdiere | 550149 | 6565726 | 705 | 210 | -50 | 352 |
Figure 3: Schematic plan view map of the Laverdiere Skarn-Porphyry Project showing 2022 drilling locations, Cu (%) surficial sampling progress, and downhole Mo (%) assay highlights. Map elements plotted on TauSf resistivity map (Resistive = cold colours, Conductive = hot colours). The blue-green resistive zone correlates with the mapped location of the Laverdiere Mo-Cu±Au Porphyry.
Sampling Protocol, Quality Assurance & Quality Control
All recovered drill core was transported by helicopter to the core logging facility in Atlin, British Columbia for processing. Down hole surveys were conducted on all drill holes upon termination, using a Reflex Gyro Sprint downhole survey tool equipped with an azimuth positioning capability. Drill core was typically sampled over two-meter intervals and occasionally reduced in areas of higher visual sulphide mineralization. Core samples were cut in half with an electric core saw, bagged, labelled, sealed, and submitted to ALS Minerals preparation facility in Whitehorse, YT with the remaining core stored in Atlin, BC. Half core samples were finely crushed and sieved to <75 microns. Samples were then shipped to ALS Geochemistry in North Vancouver, British Columbia where they were analysed for gold by fire assay with an AA finish, over limits for Ag, Pb Cu and Zn and additional elements were analysed using four acid digestion with an ICP-AES or ICP-MS finish.
Blank rock (siliceous river rock), duplicate, and certified reference materials were inserted into the sample stream for at least every 20 samples. Certified reference materials were acquired from OREAS North America Inc. of Sudbury, Ontario and CDN Resource Laboratories Ltd. of Langley, British Columbia for the 2022 diamond drill campaign.
About the Silver Lime Porphyry-CRD Project
5,565 metres of exploratory HQ-sized diamond drilling has been completed at the Silver Lime Porphyry-Skarn Project. 2022 drilling successfully confirmed the presence of high-grade carbonate replacement mineralization at depth, as well as widespread porphyry Mo mineralization and associated mineralized skarn. All surficial mineralized structures targeted during the 2022 drilling campaign are confirmed at depth.
The Silver Lime Project is predominantly hosted in carbonate rocks of the Florence Range Metamorphic Suite (ca. 1150Ma). Target limestone and marble host rocks are intercalated with upper amphibolite grade metapeltic rocks, quartzite, and amphibole-bearing gneiss. The protoliths to the metasedimentary units include continentally derived clastic strata and platform carbonate, whereas the amphibole-bearing gneiss is interpreted as probable basaltic flows, sills, dykes, and tuffaceous units related to early rifting of the ancestral North America continental margin (i.e., Mihalynuk, 1999). Younger felsic to intermediate intrusive rocks are also widespread within the project area and range from Triassic to Eocene in age. Widespread Eocene magmatic activity was associated with Cordillera-wide, brittle strike-slip faulting. Eocene volcano-plutonic centres in the western Cordillera are known to host porphyry, skarn, and epithermal-type mineralization extending from the Golden Triangle in NW British Columbia to the Tally-Ho Shear Zone in the Yukon (>100 kilometers).
Three well-defined target areas exist at the Silver Lime Project and include the Jackie, Sulphide City, and Grizzly targets. The Jackie Target represents a dyke proximal expression of Ag-Pb-Zn-Cu CRM that consists of numerous massive-to-semi massive sulphide occurrences measuring up to 30 metres long and 6 metres wide and comprise an approximate area of 400 metres by 380 metres. Many sulphide occurrences at Jackie are clustered and hosted within NE-SW trending faults and fault splays, proximal to undeformed felsic dykes oriented sub-parallel to faulting. These fault-hosted sulphide bodies are interpreted as "spokes" that typically broaden at depth and express continuity back towards a causative intrusion. The Sulphide City Porphyry-Skarn Target is characterized by multiple semi-massive to massive sulphide occurrences measuring up to 40 metres along strike and 8 metres wide. In 2022, detailed geological mapping and diamond drilling discovered a Mo-Cu-bearing and causative porphyry intrusion. The Sulphide City Target boasts an average surficial grade of 13.3g/t Ag,
About the Laverdiere Skarn-Porphyry Project
1,806 metres of exploratory HQ-sized diamond drilling has been completed at the Laverdiere Project in June. 2022 drilling successfully confirmed and extended high-grade Fe-Cu-Au skarn, Cu-Mo endoskarn, and associated Cu-Mo porphyry style mineralization for 850 metres along the western flank of Hoboe Creek, between the historic North and South Adits, and remains open at depth.
The Laverdiere Project is located proximal to the Llewellyn Fault Zone, coincident with Hoboe Creek in the eastern Blue Property. Laverdiere is characterized as a fine-to-coarse grained and locally massive Fe-Cu-Au rich skarn (magnetite and/or magnetite-chalcopyrite-dominant±bornite-tetrahedrite-molybdenite-pyrite-pyrrhotite) hosted in dolomitic limestone and marble of the Devonian Boundary Ranges Metamorphic Suite. Along the western side of Hoboe Creek, dolomitic limestone is overlain by thin-bedded calcareous siltstone, quartzite, and schist - all of which are locally folded, dip moderately to the west, and are intruded by an Early Cretaceous post-accretionary granodiorite intrusion of batholith size (Coast Plutonic Complex). The granodiorite is locally foliated, Cu-Mo-bearing, and exhibits potassic alteration in the form of secondary K-feldspar and shreddy biotite after hornblende along the Fe-Cu-Au skarn contact.
The highest-grade skarn occurrences observed at Laverdiere are hosted in dolomitic limestone, near the siltstone contact and along the margins of the granodiorite intrusion. Disseminated and quartz-vein/fracture-hosted chalcopyrite, molybdenite, magnetite, and malachite have been observed in granodiorite outcropping along the Lewellyn Fault Zone (LFZ/Hoboe Creek) for up to 3.9km south from the main skarn body.
National Instrument 43-101 Disclosure
Nicholas Rodway, P.Geo, (Licence# 46541) (Permit to Practice# 100359) is President, CEO and Director of the Company, and qualified person as defined by National Instrument 43-101- Standards of Disclosure for Mineral Projects. Mr. Rodway has reviewed and approved the technical content in this release.
About Core Assets Corp.
Core Assets Corp. is a Canadian mineral exploration company focused on the acquisition and development of mineral projects in British Columbia, Canada. The Company currently holds
On Behalf of the Board of Directors
CORE ASSETS CORP.
"Nicholas Rodway"
President & CEO
Tel: 604.681.1568
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
FORWARD LOOKING STATEMENTS
Statements in this document which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Forward looking statements in this news release include, but are not limited to, expectations regarding the pending core assays, including speculative inferences about potential copper, molybdenum, gold, silver, zinc, and lead grades based on preliminary visual observations from results of diamond drilling at the Silver Lime Project and the Laverdiere Project, as applicable; the Company's plans to further investigate the geometry and extent of the skarn and carbonate replacement type mineralization continuum at the Silver Lime Project through additional field work and diamond drilling and any planned or proposed program related thereto; and any other general statement regarding the Company's planned or future exploration efforts at the Blue Property. It is important to note that the Company's actual business outcomes and exploration results could differ materially from those in such forward-looking statements. Risks and uncertainties include that expectations regarding pending core assays based on preliminary visual observations from diamond drilling results at the Silver Lime Project and the Laverdiere Project, as applicable, may be found to be inaccurate; that results may indicate further exploration efforts at the Silver Lime Project and the Laverdiere Project, as applicable, as not warranted; that the Company may be unable to implement its plans to further explore at the Silver Lime Project and the Laverdiere Project, as applicable; that certain exploration methods, including the Company's proposed exploration model for the Blue Property, may be ineffective or inadequate in the circumstances; that economic, competitive, governmental, geopolitical, environmental and technological factors may affect the Company's operations, markets, products and prices; our specific plans and timing drilling, field work and other plans may change; that the Company may not have access to or be able to develop any minerals because of cost factors, type of terrain, or availability of equipment and technology; and we may also not raise sufficient funds to carry out or complete our plans. The ongoing COVID-19 pandemic, labour shortages, inflationary pressures, rising interest rates, the global financial climate and the conflict in Ukraine and surrounding regions are some additional factors that are affecting current economic conditions and increasing economic uncertainty, which may impact the Company's operating performance, financial position, and future prospects. Collectively, the potential impacts of this economic environment pose risks that are currently indescribable and immeasurable. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits the Company will obtain from them. Readers are cautioned that forward-looking statements are not guarantees of future performance or events and, accordingly, are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty of such statements. Additional risk factors are discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for its recently completed fiscal period, which is available under the Company's SEDAR profile at www.sedar.com. Except as required by law, the Company will not update or revise these forward-looking statements after the date of this document or to revise them to reflect the occurrence of future unanticipated events.
SOURCE: Core Assets Corp.
View source version on accesswire.com:
https://www.accesswire.com/746324/Core-Assets-Drills-564m-of-254gt-Ag-99-PbZn-011-Cu-and-012gt-Au-Including-424gt-Ag-174-PbZn-020-Cu-and-014gt-Au-Over-315m-at-the-Blue-Property
FAQ
What are the latest assay results from Core Assets Corp's 2022 exploration?
What is the significance of the findings at the Silver Lime Project?
When does the targeted drilling program at Core Assets begin?
What is the stock symbol for Core Assets Corp?