STOCK TITAN

Buenaventura Announces Second Quarter 2022 Production and Volume Sold per Metal Results

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Positive)
Tags
Rhea-AI Summary

Compañia de Minas Buenaventura S.A.A. (NYSE: BVN) reported 2Q22 production results, highlighting variances in metal output compared to prior quarters. Gold production at Orcopampa decreased to 17,749 Oz from 19,031 Oz in 1Q22, whereas Tambomayo's output slightly increased to 14,351 Oz. Silver production saw a decrease at El Brocal, totaling 806,123 Oz, while lead and zinc outputs also reflected declines. The Company updated its production guidance for the year, projecting gold output of 65k-70k Oz and silver output of 3.0M-3.5M Oz.

Positive
  • Tambomayo's gold production improved to 14,351 Oz, up from 13,867 Oz in 1Q22.
  • El Brocal's copper production remained stable at 10,537 MT.
Negative
  • Total gold production decreased at Orcopampa to 17,749 Oz from 19,031 Oz in 1Q22.
  • Silver production at El Brocal dropped to 806,123 Oz from over 1M Oz, affecting overall silver output.
  • Lead production at El Brocal fell to 1,306 MT, a significant decline.
  • Zinc production at El Brocal also declined to 4,146 MT from 8,772 MT.

LIMA, Peru--(BUSINESS WIRE)-- Compañia de Minas Buenaventura S.A.A. (“Buenaventura” or “the Company”) (NYSE: BVN; Lima Stock Exchange: BUE.LM), Peru’s largest publicly-traded precious metals mining company, today announced 2Q22 results for production and volume sold.

2Q22 Production per Metal
(100% basis)
 
1Q22
(Actual)
2Q22
(Actual)
6M22
(Actual)
2022 Updated
Guidance (1)
 
Gold (Oz.)

Orcopampa

19,031

17,749

36,780

 

65k - 70k

Tambomayo

13,867

14,351

28,218

 

48k - 53k

La Zanja

5,900

4,767

10,667

 

37k - 45k

Coimolache

19,512

19,930

39,442

 

80k - 85k

El Brocal

4,350

4,457

8,807

 

12k - 15k

 
Silver (Oz.)

Uchucchacua

0

0

0

 

0

El Brocal

1,059,666

806,123

1,865,789

 

3.0M - 3.5M

Tambomayo

419,396

433,820

853,216

 

1.8M - 2.4M

Julcani

661,132

640,557

1,301,689

 

2.2M - 2.5M

 
Lead (MT)

El Brocal

2,497

1,306

3,803

 

5.0k - 6.0k

Uchucchacua

0

0

0

 

0

Tambomayo

2,509

2,823

5,331

 

6.0k - 8.0k

 
Zinc (MT)

El Brocal

8,772

4,146

12,918

 

16.0k - 20.0k

Uchucchacua

0

0

0

 

0

Tambomayo

3,543

3,920

7,464

 

8.0k - 10.0k

 
Copper (MT)

El Brocal

10,159

10,537

20,696

 

40.0k - 45.0k

  1. 2022 outlook projections shown above are considered forward-looking statements and represent management’s good faith estimates or expectations of future production results as of July 2022.

2Q22 Comments

Tambomayo:

  • 2Q22 gold, lead and zinc production exceeded expectations due to an increase in grade and metallurgical recovery. 2022 guidance has subsequently been updated.
  • 2Q22 silver production was in line with expectations for the quarter. 2022 guidance remains unchanged.

Orcopampa:

  • 2Q22 gold production exceeded expectations due to an increase of treated ore and higher gold grades. 2022 guidance has been updated.

Coimolache:

  • Production remained stable during the quarter with higher than expected gold production due to positive reconciliation of grades from the Mirador Norte open pit along with improved leaching permeability. 2022 guidance has been updated.

La Zanja:

  • Partial recovery of mining rate at the Pampa Verde open pit subsequent to Peru’s January through April rainy season. Inflationary pressure has accelerated Buenaventura’s decision to put the mine under care and maintenance by 4Q22 in anticipation of oxides being largely depleted between October and December 2022. Buenaventura will then continue to focus on Cu-Au sulfide exploration within La Zanja’s operational footprint. Any residual gold ounces remaining within the open pit will be recovered once La Zanja’s Cu_Au project is confirmed. 2022 guidance remains unchanged.

Julcani:

  • 2Q22 silver production was in line with expectations. 2022 guidance remains unchanged.

Uchucchacua:

  • Exploration continues at the Uchucchacua mine according to plan with a focus on tunnels and diamond drilling during 2Q22. Underground crews are simultaneously in the process of being assembled in order to resume mine development during 3Q22, targeting production restart by 2H23.
  • Yumpag project continued according to plan with progress related to construction and permitting during the second quarter. Production is targeted to begin during the 2H23. Exploration continued as planned at the Camila and Tomasa orebodies with positive results which likely will increase reserves and resources by the end of 2022.

El Brocal:

  • Stable production at the underground mine at a rate of 8,000 tpd. 2Q22 copper production was in line with expectations. 2022 guidance remains unchanged.
  • Tajo Norte’s silver, zinc and lead production was below expectations during the quarter due to a change in the mine plan. 2022 guidance was updated.
  • Rehabilitation work began in late June within the upper area of the open pit which required stabilization subsequent to the March 2022 landslide.
  • Polymetallic ore derived from the open pit’s low-grade stockpiles was processed during 2Q22. This will continue during 3Q22 while rehabilitation works progresses at the open pit.

2Q22 Payable Volume Sold

2Q22 Volume Sold per Metal (100% basis)

 
1Q22
(Actual)
2Q22
(Actual)
6M22
(Actual)
 
Gold (Oz.)

Orcopampa

19,307

17,719

37,026

Tambomayo

12,181

12,917

25,098

La Zanja

5,773

4,452

10,225

Coimolache

20,586

20,551

41,137

El Brocal

2,907

2,590

5,496

 
Silver (Oz.)

Uchucchacua

18,730

139,688

158,418

El Brocal

852,933

650,260

1,503,193

Tambomayo

351,077

376,313

727,390

Julcani

636,303

605,634

1,241,937

 
Lead (MT)

El Brocal

2,239

1,071

3,310

Uchucchacua

0

18

18

Tambomayo

2,275

2,629

4,904

 
Zinc (MT)

El Brocal

7,256

3,370

10,626

Uchucchacua

0

0

0

Tambomayo

2,922

3,262

6,184

 
Copper (MT)

El Brocal

9,697

10,311

20,008

 

Realized Metal Prices*

 
1Q22
(Actual)
2Q22
(Actual)
6M22
(Actual)

Gold (Oz)

1,896

1,825

1,861

Silver (Oz)

24.10

22.71

23.42

Lead (MT)

2,363

2,180

2,280

Zinc (MT)

4,105

4,489

4,257

Copper (MT)

9,950

9,073

9,498

 
*Buenaventura consolidated figures.

Appendix

1. 2Q22 Production per Metal

 

 

1Q22
(Actual)

2Q22
(Actual)

6M22
(Actual)

 

 

 

 

Silver (Oz.)

 

 

 

Orcopampa

7,856

7,334

15,190

La Zanja

23,363

30,318

53,682

Coimolache

77,195

75,504

152,699

 

 

 

 

Lead (MT)

 

 

 

Julcani

99

124

224

 

 

 

 

2. 2Q22 Volume Sold per Metal

 

 

1Q22
(Actual)

2Q22
(Actual)

6M22
(Actual)

 

 

 

 

Silver (Oz.)

 

 

 

Orcopampa

6,928

12,411

19,339

La Zanja

21,818

29,273

51,090

Coimolache

96,634

84,859

181,494

 

 

 

 

Lead (MT)

 

 

 

Julcani

76

93

168

Company Description

Compañía de Minas Buenaventura S.A.A. is Peru’s largest, publicly traded precious and base metals Company and a major holder of mining rights in Peru. The Company is engaged in the exploration, mining development, processing and trade of gold, silver and other base metals via wholly-owned mines and through its participation in joint venture projects. Buenaventura currently operates several mines in Peru (Orcopampa*, Uchucchacua*, Julcani*, Tambomayo*, La Zanja*, El Brocal and Coimolache).

The Company owns 19.58% of Sociedad Minera Cerro Verde, an important Peruvian copper producer (a partnership with Freeport-McMorRan Inc. and Sumitomo Corporation).

For a printed version of the Company’s 2021 Form 20-F, please contact the persons indicated above, or download a PDF format file from the Company’s web site.

(*) Operations wholly owned by Buenaventura

Note on Forward-Looking Statements

This press release may contain forward-looking information (as defined in the U.S. Private Securities Litigation Reform Act of 1995) that involve risks and uncertainties, including those concerning Cerro Verde’s costs and expenses, results of exploration, the continued improving efficiency of operations, prevailing market prices of gold, silver, copper and other metals mined, the success of joint ventures, estimates of future explorations, development and production, subsidiaries’ plans for capital expenditures, estimates of reserves and Peruvian political, economic, social and legal developments. These forward-looking statements reflect the Company’s view with respect to Cerro Verde’s future financial performance. Actual results could differ materially from those projected in the forward-looking statements as a result of a variety of factors discussed elsewhere in this Press Release.

Contacts in Lima:

Daniel Dominguez, Chief Financial Officer

(511) 419 2540

Gabriel Salas, Head of Investor Relations

(511) 419 2591 / Gabriel.salas@buenaventura.pe

Contacts in NY:

Barbara Cano

(646) 452 2334

barbara@inspirgroup.com

Company Website: www.buenaventura.com.pe/ir

Source: Compañia de Minas Buenaventura S.A.A.

FAQ

What were the 2Q22 gold production numbers for Buenaventura (BVN)?

In 2Q22, gold production for Buenaventura was 17,749 Oz at Orcopampa, 14,351 Oz at Tambomayo, 4,767 Oz at La Zanja, and 19,930 Oz at Coimolache.

How did Buenaventura's silver production change in 2Q22?

In 2Q22, Buenaventura's silver production was 806,123 Oz at El Brocal, down from over 1M Oz in the previous quarter.

What is Buenaventura's updated production guidance for 2022?

Buenaventura's updated production guidance for 2022 includes gold output of 65k-70k Oz and silver output of 3.0M-3.5M Oz.

What were the lead and zinc production figures for Buenaventura in 2Q22?

In 2Q22, Buenaventura produced 1,306 MT of lead at El Brocal and 4,146 MT of zinc, both representing declines from previous quarters.

Compania de Minas Buenaventura S.A.

NYSE:BVN

BVN Rankings

BVN Latest News

BVN Stock Data

3.12B
205.66M
18.94%
56.24%
1.49%
Other Precious Metals & Mining
Basic Materials
Link
United States of America
Lima