Buenaventura Announces First Quarter 2025 Results for Production and Volume Sold per Metal
Production per Metal
Three Months Ended
|
2025
|
||
|
|
||
Gold ounces produced |
|
|
|
El Brocal |
4,627 |
15.5k - 18.5k |
|
Orcopampa |
14,295 |
45.0k - 50.0k |
|
Tambomayo |
3,034 |
12.5k - 15.5k |
|
Julcani |
1,880 |
7.5k - 9.5k |
|
La Zanja |
4,082 |
18.0k - 21.0k |
|
San Gabriel (4) |
- |
10.0k - 15.0k |
|
Total Direct Operations (2) |
27,918 |
108.5k - 129.5k |
|
Coimolache |
13,343 |
50.0k - 55.0k |
|
Total incl. Associated (3) |
31,483 |
122.6k - 144.4k |
|
|
|
||
Silver ounces produced |
|
|
|
El Brocal |
437,733 |
1.1M - 1.4M |
|
Uchucchacua |
452,176 |
2.7M - 3.2M |
|
Yumpag |
2,275,799 |
7.3M - 7.8M |
|
Orcopampa |
5,109 |
- |
|
Tambomayo |
161,393 |
1.2M - 1.5M |
|
Julcani |
339,744 |
1.5M - 1.8M |
|
La Zanja |
6,682 |
- |
|
Total Direct Operations (2) |
3,678,636 |
13.8M - 15.7M |
|
Coimolache |
89,568 |
0.2M - 0.3M |
|
Total incl. Associated (3) |
3,545,714 |
13.5M - 15.3M |
|
|
|
||
Lead metric tons produced |
|
|
|
Uchucchacua |
3,127 |
16.0k - 18.0k |
|
Tambomayo |
503 |
- |
|
Julcani |
127 |
0.8k - 1.0k |
|
Total Direct Operations (2) |
3,757 |
16.8k - 19.0k |
|
|
|
||
Zinc metric tons produced |
|
|
|
Uchucchacua |
5,272 |
23.0k - 26.0k |
|
Tambomayo |
527 |
1.0k - 1.3k |
|
Total Direct Operations (2) |
5,799 |
24.0k - 27.3k |
|
|
|
||
Copper metric tons produced |
|
|
|
El Brocal |
12,063 |
55.0k - 60.0k |
|
Julcani |
119 |
- |
|
Tambomayo |
16 |
- |
|
Total Direct Operations (2) |
12,198 |
55.0k - 60.0k |
1. |
2025 projections are considered to be forward-looking statements and represent management’s good faith estimates or expectations of future production results as of April 2025. |
2. |
Considers |
3. |
Considers |
4. |
4Q25 targeted production initiation remains unchanged, subject to final permitting and required approvals |
Volume Sold per Metal
Three Months Ended March 31, 2025 |
|
|
|
Gold ounces sold |
|
El Brocal |
2,668 |
Orcopampa |
14,746 |
Tambomayo |
2,691 |
Julcani |
1,674 |
La Zanja |
4,633 |
Total Direct Operations (1) |
26,412 |
Coimolache |
11,430 |
Total incl. Associated (2) |
29,965 |
|
|
Silver ounces sold |
|
El Brocal |
359,921 |
Uchucchacua |
496,799 |
Yumpag |
2,187,357 |
Orcopampa |
6,483 |
Tambomayo |
145,701 |
Julcani |
320,277 |
La Zanja |
24,865 |
Total Direct Operations (1) |
3,541,403 |
Coimolache |
78,726 |
Total incl. Associated (2) |
3,434,146 |
|
|
Lead metric tons sold |
|
Uchucchacua |
2,936 |
Yumpag |
39 |
Tambomayo |
386 |
Julcani |
109 |
Total Direct Operations (1) |
3,470 |
|
|
Zinc metric tons sold |
|
Uchucchacua |
4,362 |
Tambomayo |
432 |
Total Direct Operations (1) |
4,794 |
|
|
Copper metric tons sold |
|
El Brocal |
11,324 |
Tambomayo |
66 |
Julcani |
9 |
Total Direct Operations (1) |
11,400 |
1. |
Considers |
2. |
Considers |
Average realized prices(1)(2)
Three Months Ended March 31, 2025 |
|
|
|
Gold (US$/Oz) |
2,943 |
Silver (US$/Oz) |
32.22 |
Lead (US$/MT) |
1,893 |
Zinc (US$/MT) |
2,812 |
Copper (US$/MT) |
9,292 |
1. |
Considers Buenaventura consolidated figures. |
2. |
Realized prices include both provisional sales and final adjustments for price changes. |
Commentary on Operations
Tambomayo:
- Gold and silver production slightly exceeded projections for the first quarter 2025, primarily due to higher than expected ore volumes processed.
- Zinc and lead production also exceeded expectations due to increased processed ore volumes and higher-than-anticipated ore grades from stopes in the bottom section of the mine.
Orcopampa:
- 1Q25 gold and silver were in line with expectations.
La Zanja:
- 1Q25 gold production was in line with expectations.
- Silver production exceeded 1Q25 projections due to higher than anticipated solubility.
Coimolache:
- 1Q25 gold production was in line with expectations.
- Silver production exceeded 1Q25 projections due to higher than anticipated silver grades.
Julcani:
- Silver output for 1Q25 was below estimates, primarily due to lower processed volumes from the Achilla area, as well as reduced grades from the Estela area as a result of increased dilution resulting from softer ground in the majority of the new stopes.
- Gold production was in line with expectations.
Uchucchacua:
- Silver production was in line with 1Q25 expectations.
- Lead and zinc output did not meet guidance due to lower-than-expected grades, attributable to changes in the mining sequence and softer ground that resulted in higher dilution.
Yumpag:
- Silver production exceeded 1Q25 projections, driven by higher grades from early access to high-grade stopes.
El Brocal:
- Copper and gold production was in line with expectations for 1Q25.
- Silver production outperformed guidance, due to higher than budgeted silver grades as part of a short-term plan prioritizing mining blocks with high silver content.
Company Description
Compañía de Minas Buenaventura S.A.A. is Peru’s largest, publicly traded precious and base metals Company and a major holder of mining rights in
The Company owns
(*) Operations wholly owned by Buenaventura.
Note on Forward-Looking Statements
This press release may contain forward-looking information (as defined in the
View source version on businesswire.com: https://www.businesswire.com/news/home/20250416760589/en/
Contacts in
Daniel Dominguez, Chief Financial Officer
(511) 419 2540
Sebastián
(511) 419 2591
sebastian.valencia@buenaventura.pe
Contact in
Barbara Cano, InspIR Group
1 (646) 452 2334
barbara@inspirgroup.com
Website: buenaventura.com/en/inversionista/
Source: Compañía de Minas Buenaventura S.A.A.