STOCK TITAN

Battery Mineral Resources Announces Encouraging Drill Results from Its Punitaqui Copper Mine in Chile

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) has announced encouraging drill results from its 2024 underground exploration and in-fill drill program at the Cinabrio mine in Chile. Highlights include:

- CM-24-15: 10.2m grading 2.6% CuT & 10.5g/t Ag
- CM-24-16: 10.8m grading 2.5% CuT & 9.7g/t Ag
- CM-24-06: 3.9m grading 1.9% CuT & 5.3g/t Ag

The drilling confirmed copper grades and better delineated mineralization in the lower shale unit and footwall andesite. The program, consisting of 10 drillholes totaling 389.9 meters, targeted Level 135 scheduled production areas. Results have been added to 3D geology and resource models to update mine designs and optimize schedules.

VP Exploration Peter Doyle stated, "These new promising copper intercepts confirm copper grades and enhance our understanding of the current geological model."

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ha annunciato risultati di perforazione incoraggianti dal suo programma di esplorazione sotterranea e di riempimento per il 2024 presso la miniera di Cinabrio in Cile. I punti salienti includono:

- CM-24-15: 10,2m con un contenuto di 2,6% CuT & 10,5g/t Ag
- CM-24-16: 10,8m con un contenuto di 2,5% CuT & 9,7g/t Ag
- CM-24-06: 3,9m con un contenuto di 1,9% CuT & 5,3g/t Ag

La perforazione ha confermato i gradi di rame e delineato meglio la mineralizzazione nell'unità di argilla inferiore e nell'andesite della parete di fondo. Il programma, composto da 10 perforazioni per un totale di 389,9 metri, ha preso di mira le aree di produzione programmate a Livello 135. I risultati sono stati aggiunti ai modelli geologici e di risorse 3D per aggiornare i progetti minerari e ottimizzare i programmi.

Il VP Esplorazione Peter Doyle ha dichiarato: "Questi nuovi promettenti intercetti di rame confermano i gradi di rame e migliorano la nostra comprensione del modello geologico attuale."

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ha anunciado resultados de perforación alentadores de su programa de exploración subterránea y de relleno para 2024 en la mina Cinabrio en Chile. Los aspectos destacados incluyen:

- CM-24-15: 10.2m con una ley de 2.6% CuT & 10.5g/t Ag
- CM-24-16: 10.8m con una ley de 2.5% CuT & 9.7g/t Ag
- CM-24-06: 3.9m con una ley de 1.9% CuT & 5.3g/t Ag

La perforación confirmó las leyes de cobre y delimitó mejor la mineralización en la unidad de pizarra inferior y en la andesita de la pared de pie. El programa, que consistió en 10 perforaciones con un total de 389.9 metros, tuvo como objetivo las áreas de producción programadas en el Nivel 135. Los resultados se han incorporado a los modelos geológicos y de recursos en 3D para actualizar los diseños de la mina y optimizar los cronogramas.

El VP de Exploración, Peter Doyle, expresó: "Estos nuevos interceptos de cobre prometedores confirman las leyes de cobre y mejoran nuestra comprensión del modelo geológico actual."

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF)는 칠레의 시나브리오 광산에서 2024년 지하 탐사 및 채우기 드릴 프로그램의 고무적인 시추 결과를 발표했습니다. 주요 내용은 다음과 같습니다:

- CM-24-15: 10.2m, 구리 함량 2.6% CuT 및 10.5g/t Ag
- CM-24-16: 10.8m, 구리 함량 2.5% CuT 및 9.7g/t Ag
- CM-24-06: 3.9m, 구리 함량 1.9% CuT 및 5.3g/t Ag

이번 시추를 통해 구리 함량이 확인되었고, 하부 셰일 유닛과 바닥 안데사이트의 광물화가 더욱 명확해졌습니다. 이 프로그램은 총 389.9미터의 10개 시추홀로 구성되어 있으며, 135 레벨의 예정된 생산 지역을 목표로 하였습니다. 결과는 3D 지질 및 자원 모델에 추가되어 광산 설계를 업데이트하고 일정 최적화에 활용되었습니다.

탐사 담당 VP인 피터 도일(Peter Doyle)은 "이번에 발견된 유망한 구리 인터셉트들은 구리 함량을 확인하고 현재 지질 모델에 대한 우리의 이해를 향상시킵니다."라고 말하였습니다.

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) a annoncé des résultats de forage encourageants de son programme d'exploration souterraine et de forage d'infill pour 2024 à la mine de Cinabrio au Chili. Les faits saillants comprennent:

- CM-24-15: 10,2 m avec une teneur de 2,6 % CuT et 10,5 g/t Ag
- CM-24-16: 10,8 m avec une teneur de 2,5 % CuT et 9,7 g/t Ag
- CM-24-06: 3,9 m avec une teneur de 1,9 % CuT et 5,3 g/t Ag

Le forage a confirmé les teneurs en cuivre et mieux délimité la minéralisation dans l'unité de schiste inférieure et l'andesite du mur de pied. Le programme, composé de 10 forages totalisant 389,9 mètres, visait les zones de production programmées au niveau 135. Les résultats ont été intégrés aux modèles géologiques et de ressources en 3D pour mettre à jour les conceptions minières et optimiser les plannings.

Le VP Exploration Peter Doyle a déclaré : "Ces nouvelles interceptions de cuivre prometteuses confirment les teneurs en cuivre et améliorent notre compréhension du modèle géologique actuel."

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) hat ermutigende Bohrergebnisse aus seinem unterirdischen Explorations- und Infill-Bohrprogramm 2024 in der Cinabrio-Mine in Chile bekannt gegeben. Zu den Highlights gehören:

- CM-24-15: 10,2 m mit 2,6 % CuT und 10,5 g/t Ag
- CM-24-16: 10,8 m mit 2,5 % CuT und 9,7 g/t Ag
- CM-24-06: 3,9 m mit 1,9 % CuT und 5,3 g/t Ag

Die Bohrungen bestätigten die Kupfergehalte und präzisierten die Mineralisierung in der unteren Schiefereinheit und dem Hangenden Andesit. Das Programm umfasste 10 Bohrlöcher mit insgesamt 389,9 Metern, die auf die geplanten Produktionsbereiche auf Ebene 135 abzielten. Die Ergebnisse wurden in 3D-Geologie- und Ressourcenmodelle integriert, um die Minenlayouts zu aktualisieren und die Zeitpläne zu optimieren.

VP Exploration Peter Doyle erklärte: „Diese neuen vielversprechenden Kupferinterzeptionen bestätigen die Kupfergehalte und verbessern unser Verständnis des aktuellen geologischen Modells.“

Positive
  • Encouraging drill results with high-grade copper and silver intercepts
  • Confirmation of copper grades and better delineation of mineralization
  • Results integrated into 3D models for improved mine design and scheduling
  • Ongoing drilling program with potential to upgrade and add new resources
Negative
  • None.

Vancouver, British Columbia--(Newsfile Corp. - October 3, 2024) - Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ("Battery" or "BMR" or the "Company") is pleased to announce encouraging drill core assay results from the new 2024 underground exploration and in-fill drill program in the Cinabrio mine at the Punitaqui mine complex ("Punitaqui") in Chile.

Highlights

  • Assay results from drillholes (see Table 1) have returned with encouraging results as follows:
    • Drillhole CM-24-04: 6.9 meters ("m") at 0.65% ("CuT") total copper and 2.1g/t grams per tonne ("Ag") silver.
    • Drillhole CM-24-06: 3.9m grading 1.9% CuT & 5.3g/t Ag.
    • Drillhole CM-24-07: 8.4m grading 0.7% CuT & 1.2g/t Ag.
    • Drillhole CM-24-08: 4.4m grading 1.3% CuT & 4.9g/t Ag.
    • Drillhole CM-24-09: 9.9m grading 0.8% CuT & 2g/t Ag.
    • Drillhole CM-24-15: 10.2m grading 2.6% CuT & 10.5g/t Ag.
    • Drillhole CM-24-16: 10.8m grading 2.5% CuT & 9.7g/t Ag.
    • Drillhole CM-24-17: 1.4m grading 1.2% CuT & 4.1g/t Ag.

Note: All Intercepts reported as estimated true widths intervals

  • This drilling confirmed copper grades and better delineated the extent of the mineralization in the lower shale unit and footwall andesite within and adjacent to the planned production area.
  • This phase of Cinabrio underground drilling targeted the Level 135 scheduled production areas situated both above and below the level. Ten drillholes totaling 389.9 meters of diamond core drilling were completed (see Table 2 and Figure 1).
  • Nine of the ten holes were designed to confirm the modelled geology, mineralization and probe the contact zone between the lower mineralized shale unit and the underlying andesites within and adjacent to the planned production area. Drillhole CM-24-10 was drilled to test for possible fault offsets of the mineralized horizons north of the planned production area.
  • The 2024 Cinabrio drill program is designed to confirm mineralization identified by previous drilling programs and test for extensions along strike and at depth. All 10 holes drilled from the Level 135 reached target depth.
  • These drill results have been added to the three-dimensional geology and resource models which BMR's mining engineers use to update the current mine designs and optimize mining schedules.
  • As of late -September, the Cinabrio-San Andres underground drill program had resulted in the completion of 33 drillholes / 1,440.8m including 21 holes / 910.6m at Cinabrio.
  • Drilling is ongoing and assay results for the recently completed San Andres and Cinabrio drillholes are pending.

Battery VP Exploration Peter Doyle states; "We are excited to announce these new promising copper intercepts. This latest set of drill results not only confirms the copper grades but also enhances our understanding and accuracy of the current geological model."

During the current operational ramp-up period, the underground drilling program is focused on accessible targets within existing Inferred Resource to upgrade the resources to a higher resource category as well as targeting areas adjacent to Inferred Resource to potentially add new resources.

The 2024 drill plan allows for some flexibility in terms of timing and sequencing of target areas which permits the drilling to be shifted between the Cinabrio mine and the adjacent San Andres underground.

Cinabrio Mine
Sample assay results, reported herein, are from planned production targets above and below Level 135 in the Cinabrio mine. These 10 drill holes are infill and extension holes designed to verify and better delineate mineralization targeted for production from planned production areas above and below Level 135. Six of the holes (CM-24-04 to CM-24-08 and CM-24-10) were drilled as up-holes targeting a planned production area above Level 135 while the remaining 4 holes (CM-24-09, CM-24-15 to CM-24-17) were drilled as down holes targeting a planned production area below the level.

Drillhole CM-24-04 was designed as an infill hole to test the northern part of the planned production area above Level 135. The drillhole was drilled from the footwall andesites up through to the targeted sedimentary unit ("TSU") and into the overlying andesitic flow breccia. Copper mineralization was intersected in a magnetite-rich zone in the footwall andesite from 0m to 17.7m. Estimated true with assays intervals reported include 6.9m grading 0.65% CuT and 2.1g/t Ag that includes a 2.7m grading 1.0% CuT and 5.1g/t Ag result. The drillhole intersected TSU sequence between 17.6m to 27.4m however, the TSU sequence is only weakly mineralized.

Drillhole CM-24-05 was designed as an infill hole to test the upper north central portion of the planned production area above Level 135. The drillhole collared in the footwall andesites followed by the TSU sedimentary unit and was shut down in the overlying andesitic flow breccia. Mineralization was intersected in a magnetite-rich zone hosted within the footwall andesite from 5.6m to 11.4m and in the TSU sedimentary sequence from 11.4m to 19.1m. Estimated true width assay intervals reported include 4.4m grading 0.37% Cu and 0.7g/t Ag and 4.5m at 0.33% Cu and 0.6g/t Ag which confirmed the copper grades in the target area.

Drillhole CM-24-06: an infill hole, was designed to test the central part of the planned production area above Level 135. The drillhole was drilled from the footwall andesites up through to the TSU sedimentary unit and into the overlying flow breccia. Mineralization was intersected in a magnetite-rich zone footwall andesite from 5.4m to 10.1m. An estimated true width assay interval of 3.9m grading 1.92% Cu and 5.3g/t Ag was reported. The drillhole confirmed the grade mineralization in the central portion of the planned production area.

Drillhole CM-24-07: was designed as an extensional hole to test the north end of the planned production area above Level 135. The drillhole intersected variably mineralized magnetite-rich footwall andesites from 0m to 25.2m. From 25.2m to 34.38 the hole intersected an andesitic dyke and then passed into hanging wall flow breccia from 34.3m to end of hole at 56.7m. An estimated true width assay interval of 8.4m grading 0.69% CuT and 1.2g/t Ag was reported and included 2.1m at 1.28% CuT and 3.2g/t Ag. Results of this hole confirm the TSU sedimentary sequence has been offset by a fault and intruded by an andesite dyke.

Drillhole CM-24-08, an infill hole was designed to test the southern part of the planned production area above Level 135. The drillhole collared in the footwall andesites, followed by the TSU sediments and was terminated in the overlying flow breccia. Mineralization was intersected in a magnetite-rich zone in the footwall andesite from 0m to 10m and strong copper mineralization was intersected in the overlying shale horizon from 10m to 14.6m. Estimated true width assay intervals reported include 4.4m grading 1.33% CuT and 4.9g/t Ag in the shale horizon.

Drillhole CM-24-09 was planned as an infill hole to test the north central part of the planned stope area. The sequence drilled started in the footwall andesites and drilled up-section through the TSU sedimentary unit and into the overlying andesitic flow breccia. Mineralization was intersected both in the footwall andesite from 12.45m to 20.75m and in the TSU sequence from 20.75m to 29.9m. Estimated true width assay intervals reported include 9.9m grading 0.75% CuT and 2.0g/t Ag. This assay interval includes both the magnetite-rich zone in the footwall andesite and sediment hosted mineralization. The drillhole confirmed the grade and extent of the mineralization in the planned extraction area.

Drillhole CM-24-10 was designed as an extensional hole to explore for potential for an interpreted faulted offset of the sedimentary horizon northwest of the planned production area. The drillhole collared in and cut 6.4m of andesitic dyke followed by hanging flow breccia to 25.45m. An andesitic dyke was intersected from 25.45m to 40.45m. The drill results confirm the faulted offset of the sedimentary unit does not exist in the area tested.

Drillhole CM-24-15, an infill hole, was designed to test the central part of the planned production area below Level 135. The drill hole was drilled from the hanging wall andesitic flow breccia, down through a shale sandstone sequence and into the footwall andesites. Mineralization occurred in the sedimentary units from 6.2m to 12.4m and in the footwall andesite from 12.4m to 20.5m. Estimated true width assay intervals reported include 10.2m grading 2.62% CuT and 10.5g/t Ag. This interval includes both the magnetite zone in the footwall andesite and sediment hosted mineralization. Drillhole CM-24-15 is 20m north of 2012 drillhole CM-0-12-01 which returned an estimated true width interval of 6.6m at 2.58% CuT and 13.7g/t Ag. This new hole confirmed the presence of mineralization in the planned extraction area.

Drillhole CM-24-16, an infill hole was planned to test the central part of the planned production area below Level 135. The drillhole was drilled from the hanging wall andesitic flow breccia, through the shale-sandstone sequence and into the footwall andesites. Copper-magnetite mineralization occurred in the sedimentary units from 6.2m to 12.4m and in the underlying andesite. Estimated true width assay intervals reported include 10.8m at 2.58% CuT and 9.7g/t Ag. Drill hole CM-24-15 confirmed the continuity of mineralization in the planned extraction area.

Drillhole CM-24-17 was designed to test the southern end of the planned stope area below level 135 and confirm the results of historic drillhole CM-0-12-01 that cut 6.6m (estimated true width) grading 2.58% CuT and 13.7g/t Ag. The current drillhole collared in the hanging wall andesitic flow breccia, through a shale-sandstone of the TSU sedimentary sequence and into the footwall andesites. Variable mineralization occurred in the sedimentary units from 11.4 to 21.8. Estimated true width assay intervals reported include 1.8m grading 0.67% CuT and 1.1g/t Ag and 1.4m m at 1.24% CuT% and 4.1 g/t Ag. Drill hole CM-24-17 confirmed the presence of mineralization in the planned extraction area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6076/225413_1b4dd4ad146528ea_002.jpg

Figure 1: Cinabrio Drilling Hole Location Plan- Level 135

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6076/225413_1b4dd4ad146528ea_002full.jpg

Table 1: Cinabrio Level 135 Significant Drillhole Intercepts

Drillhole
Number
Downhole
Interval
From
(m)
Downhole
Interval
To
(m)
Downhole Sample
Interval
(m)
Sample
Estimated True Interval Width
(m)
Total
Copper
CuT
(%)
Silver
Ag
(Grams per tonne)
(g/t)
CM-24-0410.0017.607.606.900.652.10
Including 11.0014.003.002.701.005.10
CM-24-055.6010.104.504.400.370.70
CM-24-065.4010.104.703.901.925.30
CM-24-0713.0025.2012.208.400.691.20
including13.0016.003.002.101.283.20
and20.0025.205.203.600.780.60
CM-24-0810.1014.604.504.401.334.90
CM-24-0912.4530.9018.459.900.752.00
including 20.7530.9010.155.500.892.80
CM-24-10NOSIGNIFICANT RESULTS
CM-24-156.2020.5014.3010.202.6210.50
including12.4015.403.002.509.2240.70
CM-24-1612.9028.4015.5010.802.589.70
CM-24-1711.4015.403.001.800.671.10
and 19.4021.802.401.401.244.10

 

Note: All Intercepts reported as estimated true widths intervals.

Table 2: Cinabrio Level 135 Drillhole Summary

Hole NumberCollar UTM
Easting (m)
Collar UTM
Northing (m)
Collar Elevation (mASL)Depth
EoH
(m)
Hole Inclination (Dip)AzimuthHole
Type & Size
CM-24-04 288624.396599710.10137.0848.3523.3239.79Diamond HQ Core
CM-24-05288624.376599710.37135.5561.133.1174.13Diamond HQ Core
CM-24-06288624.956599706.32138.1525.240.18110.91Diamond HQ Core
CM-24-07288624.466599710.17136.8656.79.9725.09Diamond HQ Core
CM-24-08288634.476599688.44137.6425.238.0769.34Diamond HQ Core
CM-24-09288634.736599688.65135.8840.6-16.5562.16Diamond HQ Core
CM-24-10288657.176599733.75135.8540.45-1.1759.47Diamond HQ Core
CM-24-15288680.726599683.94134.7825.30-62.88265.04Diamond HQ Core
CM-24-16288680.506599686.84135.2635.80-32.71299.46Diamond HQ Core
CM-24-17288681.006599682.69134.7031.00-45.88179.73Diamond HQ Core

 

Background - Cinabrio Deposit
The Cinabrio copper deposit mined by Glencore and Xiana Mining was the main ore source for the Los Mantos processing plant for over 10 years. Cinabrio is the largest deposit mined to date and is part of the Punitaqui project. The Project is situated within a 25km long mineralized district that is a classic IOCG and manto style copper belt, comprised of manto and structural controlled copper-silver veins.

On October 3, 2022, BMR published an NI 43-101 resource for Cinabrio at a 0.70 Cu% cut-off.

  • Indicated Sulphide Resource of 378,000 tonnes grading 1.55% CuT.
  • Inferred Sulphide Resource of 90,000 tonnes at 0.98% CuT

In addition, indicated resources in potentially recoverable pillars at Cinabrio reported at a 0.70 Cu% cut-off.

  • Undiluted Indicated resources of 1,027,000 tonnes at grading 1.51% CuT
  • Diluted Indicated resources of 1,312,000 tonnes at 1,27% CuT

Note: Scientific and technical information pertaining to the San Andres Resource was extracted from the Company's NI 43-101 "Technical report on Punitaqui Copper Complex Coquimbo, Chile" dated as of September 30,2022 with an effective date of August 16, 2022, prepared by Garth Kirkham (Kirkham Geosystems Ltd.) an Independent Qualified Person in accordance with NI 43-101.

The Cinabrio deposit is a tabular sedimentary horizon known as the "Targeted Stratigraphic Unit" ("TSU") within a volcanic sequence. This sedimentary horizon is variably mineralized and has a variable width ranging from 5m - 30m. It consists of an interlayered volcano-sedimentary sequence composed of dark colored laminated and unlaminated shales, volcanoclastic sandstone, conglomerates and breccias and tuff breccias. Most of the copper mineralization is hosted in the shale units within the TSU package. The horizon dips at 40 to 50 degrees to the east.

Mineralization consists of veinlets and irregular disseminations in both the fine and coarse-grained clastic rocks and locally within the volcanic rocks above and below the host unit. The host horizon is also cut and offset by faults and dykes with a wide range of orientations.

Quality Control
Sample preparation, analysis and security procedures applied on the BMR exploration projects are aligned with industry best practice. BMR has implemented protocols and procedures to ensure high quality collection and management of samples resulting in reliable exploration assay data. BMR has implemented formal analytical quality control monitoring for all field sampling and drilling programs by inserting blanks and certified reference materials into every sample sequence dispatched.

Sample preparation is performed BMR Los Mantos Preparation Lab. Samples are dried then crushed to 70% < -2 millimeters and a riffle split of 250 grams is then pulverized to 85% of the material achieving a size of <75 microns. Sample pulps & rejects were then delivered to ALS Global - Geochemistry Analytical Lab in La Serena, Chile and sample analyses by ALS in Lima, Peru. ALS analytical facilities are commercial laboratories and are independent from BMR. All BMR samples are collected and packaged by BMR staff and delivered upon receipt at the ALS Laboratory. Samples are logged in a sophisticated laboratory information management system for sample tracking, scheduling, quality control, and electronic reporting. These prepared samples are then shipped to the ALS Laboratory in North Vancouver for analyses by the following methods:

  • ME-MS61: A high precision, multi-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids. Analysed by inductively coupled plasma ("ICP") mass spectrometry that produces results for 48 elements.
  • ME-OG62: Aqua-Regia digest: Analysed by ICP-AES (Atomic Emission Spectrometry) or sometimes called optical emission spectrometry (ICP-OES) for high levels of Co, Cu, Ni and Ag.

Certified standards are inserted into sample batches by ALS. Blanks and duplicates are inserted within each analytical run. The blank is inserted at the beginning, certified standards are inserted at random intervals, and duplicates are analysed at the end of the batch.

Qualified Persons
Peter Doyle, Vice President of Exploration and Michael Schuler, Chile Exploration Manager for Battery Mineral Resources Corp., supervised the preparation of and approved the scientific and technical information in this press release pertaining to the Punitaqui exploration drill program. Mr. Doyle and Mr. Schuler are qualified persons as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Scientific and technical information pertaining to the Punitaqui Resource was extracted from the Company's NI 43-101 "Technical Report on Punitaqui Copper Complex Coquimbo, Chile" dated as of September 30,2022 with an effective date of August 16, 2022, prepared by Garth Kirkham (Kirkham Geosystems Ltd.) an Independent Qualified Person in accordance with NI 43-101.

All mineral resources have been estimated in accordance with Canadian Institute of Mining and Metallurgy and Petroleum ("CIM") definitions, as required under NI 43-101. Cut-off grades are based on a price of US$3.50/lb copper, US$20/oz silver and several operating costs, metallurgical recoveries, and recovery assumptions, including a contingency factor.

About Battery Mineral Resources Corp.
Battery Mineral Resources' mission is to build a mid-tier copper producer and has recently initiated mine and mill operations at the Punitaqui Mining Complex, a historic copper-gold-silver producer, in the Coquimbo region of Chile. The Company's portfolio also consists of two cobalt assets and one lithium asset located in North America and two graphite assets in South Korea. The Company is focused on providing shareholders accretive exposure to copper and the global mega-trend of electrification while being focused on growth through cash-flow, exploration, and acquisitions in favorable mining jurisdictions.

For more information about Battery Minerals, please visit our website at, https://bmrcorp.com or email us at info@bmrcorp.com.

For more information, please contact:

Martin Kostuik, CEO
Phone: +1 (604) 628-1110

Twitter: @BMRcorp_
Facebook: Battery Mineral Resources Corp. | Facebook
LinkedIn: Battery Mineral Resources Corp.: My Company | LinkedIn

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

Forward-Looking Statements
This news release includes certain "forward-looking statements" under applicable securities laws. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections of the Company on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability of the Company to obtain sufficient financing to complete exploration and development activities, risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the ability of the Company to meet its anticipated development schedule, government regulation and fluctuating metal prices. Accordingly, readers should not place undue reliance on forward-looking statements. BMR undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein, whether as a result of new information or future events or otherwise, except as may be required by law. For further information regarding the risks please refer to the risk factors discussed in BMR's most recent Management Discussion and Analysis filed on SEDAR+.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/225413

FAQ

What were the best drill results from Battery Mineral Resources' Cinabrio mine?

The best drill results from the Cinabrio mine included 10.2m grading 2.6% CuT & 10.5g/t Ag in hole CM-24-15, and 10.8m grading 2.5% CuT & 9.7g/t Ag in hole CM-24-16.

How many drillholes were completed in the 2024 Cinabrio drill program?

The 2024 Cinabrio drill program completed 10 drillholes totaling 389.9 meters of diamond core drilling.

What is the purpose of Battery Mineral Resources' (BTRMF) drilling program at Cinabrio?

The drilling program aims to confirm mineralization identified by previous drilling, test for extensions along strike and at depth, and upgrade Inferred Resources to a higher resource category.

Where is the Cinabrio mine located?

The Cinabrio mine is part of the Punitaqui mine complex located in Chile.

BATTERY MINERAL RESOURCES

OTC:BTRMF

BTRMF Rankings

BTRMF Latest News

BTRMF Stock Data

6.87M
70.90M
54.28%
6.19%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver