BeMetals Reports Further Positive Copper Intervals from 2023 and Commences Follow Up Drill Program at Pangeni Copper Project in Zambia
- Positive drilling results showcasing multiple zones of copper mineralization at the Pangeni Copper Project.
- Encouraging analytical results from drill holes D14-C1 and D22-C1 reinforcing large-scale discovery potential.
- Follow-up core drilling program underway to test extensions and grade continuity of copper mineralization.
- Significant scale potential of copper mineralization beneath the Kalahari sand cover.
- Positive outlook for the ongoing drilling at the Pangeni Project in Zambia.
- None.
VANCOUVER, BC / ACCESSWIRE / April 3, 2024 / BeMetals Corp. (TSXV:BMET)(OTCQB:BMTLF)(Frankfurt:1OI.F) (the "Company" or "BeMetals") is pleased to announce remaining drilling results from its 2023 exploration program at the Pangeni Copper Project in Zambia (the "Project" or the "Property"). A new phase of core drilling has recently commenced to identify additional zones of higher-grade copper and expand the footprint of the mineralization within the priority D-Prospect area.
Highlights:
- D14-C1: Returned multiple zones of copper mineralization from a shallow, approximately 70 metres, vertical depth
- D14-C1: Interval 1: 69.41 metres grading 0.25 % copper ("Cu"), including: 12.91 metres grading
0.37% Cu, and Interval 2: including 12.64 metres grading0.32% Cu with 7.64 metres grading0.39% Cu - The mineralization, and associated alteration discovered at the D-Prospect, currently traced over 1.5 kilometres along strike, shows many of the hallmarks of large-scale copper deposits mined in the Domes Region of the Zambian Copperbelt
- A follow up core drilling program is underway to test extensions and grade continuity of the hole D22-C1 (Interval 3: 18.10 metres grading
0.70% Cu) intercept reported in January 2024, and other drilled copper intersections at this Prospect, beneath the shallow Kalahari sand cover
Note: Table 1 below provides details of these 2023 drilling program results and other intersections in drill hole D14-C1.
John Wilton, President and CEO of BeMetals, stated "We are pleased with the analytical results indicating multiple, or stacked, zones of copper mineralization from drill hole D14-C1 that was drilled during last year's exploration program. These new D14-C1 and recently released D22-C1 drill hole results re-enforce the large-scale discovery potential of the priority D-Prospect at the Pangeni Project. In February, Dr. Richard Sillitoe completed a drill core review of the D-Prospect and concluded that the copper mineralization is closely similar in geological setting, style, and age to that exploited by Barrick Gold Corporation at their Lumwana Copper Mine, in the Zambian Copperbelt, and the current results motivate further drilling.
The Company has recently commenced a planned 1,800 to 2,000 metre follow-up core drilling program and approximately 600 metres of this program have already been drilled with the first completed drill hole under sampling and dispatch to the laboratory. First results from the current drilling are expected during Q2, 2024.
We are increasingly encouraged and excited by what we are seeing from our ongoing drilling of the D-Prospect at the Pangeni Project in Zambia. The Project is delivering compelling results, indicating significant scale potential of the copper mineralization beneath the Kalahari sand cover. These technical results are importantly enhanced by the pedigree of the Zambian Copperbelt, the backdrop of increasing copper mining and exploration investments into Zambia, and the strong fundamentals for the copper price."
PANGENI COPPER PROJECT: D-PROSPECT
Complete results have now been received from the 2023 drilling campaign at the D-Prospect which comprised 2,032 metres of shallow aircore drilling to test for additional bedrock copper anomalies below the Kalahari sand cover, and 787 metres of follow-up core drilling in three holes (D22-C1, D14-C1, D11-C1).
These new results from drill hole D14-C1 further enhance the potential of the D-prospect, in context with the previously reported zones of mineralization from holes D22-C1 and D2-C1, including 18.10 metres grading
The D14-C1 results importantly include interval 1, a broad zone of 69.41 metres, from a vertical depth of approximately 70 metres, grading
Interval 2 includes additional zones of mineralization with 12.64 metres grading
As noted by Dr. Richard Sillitoe, the D-Prospect mineralization is closely similar in geological setting, style, and age to that exploited by Barrick Gold Corporation at their Lumwana Copper Mine, farther east in the Domes region (see Figure 3). The Lumwana Mine with Mineral Reserves of 538.8 million tonnes grading
Drill hole D11-C1 did not intersect any significant zones of copper mineralization and is currently interpreted to have been drilled into the footwall units below the main target zone as intersected in drill hole D22-C1.
The Company has commenced a planned 1,800 to 2,000 metre, follow-up, phase of core drilling to test initially for extensions of the copper mineralization to the southwest of the 2023 drilling at the D-Prospect area of the Property. The Company will release new drilling results during Q2 and Q3 2024 as they become available.
The Pangeni Project copper mineralization, is a westerly extension of the Zambian Copperbelt and is concealed under a relatively thin but extensive layer of Kalahari sand cover. The open pit Sentinel Copper Mine, operated by First Quantum Minerals, is located approximately 130 kilometres northeast of the Pangeni Project and currently represents the westernmost copper mine of the Domes Region within the prolific Zambian Copperbelt. The Pangeni Project is pro rata funded by BeMetals (
(1) First Quantum Minerals Ltd. website, Mineral Reserves - as at December 31, 2022, and reported based on a long-term
(2) Barrick Gold Corporation website, Mineral Reserves - December 31, 2013, Technical Report on the Lumwana Mine, North-Western Province, Republic of Zambia, Barrick Gold Corporation, Report for NI 43-101, March 27, 2014.
(3) Bernau, R., Roberts, S., Richards, M., Nisbet, B., Boyce, A., Nowecki, J. (2013) The geology and geochemistry of the Lumwana Cu (± Co ± U) deposits, NW Zambia. Mineralium Deposita, 48:137-153.
Figure 1: Pangeni Copper Project: D-Prospect: 2023 Drilling Program: D14-C1, D11-C1, and D22-C1 Results, Plan Map with Previous Core Drill Holes, and Combined Phases of Shallow Air Core Results
Note: D14-C1, and D11-C1 results reported here (See Tables 1 & 2). Other drill hole results previously reported in BeMetals' news releases: BeMetals Delivers Significant Copper Intersection at Pangeni Project in Zambia and Announces Closing of
Figure 2: 2023 Drill Program: Simplified Cross Section Through Drill Hole D14-C1 (Looking East)
Table 1: 2023 Drill Program: D-Prospect: D14-C1 Drill Hole Intersection Results
Prospect, Borehole ID & Interval | From (m) | To (m) | Core Interval (m) | Cu % |
D-Prospect | ||||
D14-C1: Interval 1 | 80.47 | 149.88 | 69.41* | 0.25 |
Including: | 91.34 | 94.84 | 3.50 | 0.35 |
Also including: | 102.62 | 107.37 | 4.75 | 0.45 |
Also including: | 120.60 | 126.49 | 5.89 | 0.38 |
Also including: | 135.97 | 148.88 | 12.91 | 0.37 |
And including: | 136.97 | 143.17 | 6.20 | 0.48 |
D14-C1: Interval 2 | 164.16 | 197.19 | 33.03* | 0.23 |
Including: | 172.01 | 174.01 | 2.00 | 0.41 |
Including: | 184.55 | 197.19 | 12.64 | 0.32 |
Also including: | 187.55 | 195.19 | 7.64 | 0.39 |
Table 1 Notes: Intertek Genalysis completed the analytical work with the core samples processed at their preparation facility in Kitwe, Zambia. All analytical procedures were conducted in an Intertek Genalysis laboratory in Perth, Australia. Reported widths are drilled core lengths as true widths are unknown at this time. Based upon current data it is estimated true widths range between 80 and
PANGENI COPPER PROJECT: OTHER TARGETS
In addition to the work conducted at the D-Prospect during the 2023 exploration program, 2,972 metres of shallow aircore, and 1,100 metres of core drilling were completed to test other exploration targets on the Property. These targets are located between 10 to 20 kilometres away from the priority D-Prospect. Figure 4 indicates the locations of these targets, the aircore lines completed and core drill hole collar positions. Results from these targets indicate and confirm that there are multiple zones and geological settings with a high degree of exploration potential within the Property.
Target Q3 was outlined by three anomalous aircore holes (Q3-05A, Q3-05 and Q3-05B) completed during the 2022 exploration program that returned bedrock copper values of 859, 331 and 210 parts per million (ppm) copper respectively. The follow-up core hole Q3-C3 intersected a zone of 2.61 metres grading
At the P4 Target, core hole P4-C1 returned an interval of 5.00 metres grading
At the L and Q Targets, drill holes L4-C1, L4-C2 and Q5-C1 did not intersect any significant copper mineralization. Table 3 shows the drill hole ID, azimuth, dip, end of hole depth, collar coordinates and status of all the core drill holes from the 2023 program.
Figure 3: Map Showing Selected Large Scale Copper Mines in Zambia and DRC with the Domes Region of Zambia
Source: Modified after MacIntyre, T., Gysi, A., Hitzman, M., (2018). Geology and Geochemistry of the Kansanshi Cu-Au deposit, Zambia.
Figure 4: Pangeni Copper Project: 2023 Drilling Program: L4-C1/C2, P4-C1, Q5-C1 and Q3-C3 Results, Plan Map with Core Drill Holes, and Shallow Air Core Line Locations
Table 2: 2023 Drill Program: Q3-C3 and P4-C1 Drill Hole Intersection Results
Borehole ID & Interval | From (m) | To (m) | Core Interval (m) | Cu % |
Q3-C3 | 224.47 | 227.08 | 2.61 | 0.49 |
P4-C1 | 62.00 | 67.00 | 5.00* | 0.40 |
Including: | 63.10 | 65.49 | 2.39 | 0.71 |
Table 2 Notes: Analytical work as above for Table 1, and reported widths are drilled core lengths as true widths are unknown at this time. Based upon current data it is estimated true widths range between 85 and
Table 3: Pangeni Project: 2023 Program: Drill Hole ID, Azimuth, Dip, End of Hole Depth and Collar Coordinates
Drill Hole ID | Azimuth degree | Dip Degree | End of hole Depth (m) | Easting (m) | Northing (m) | Elevation (m) | Status |
D14-C1 | 000 | -60 | 251.80 | 177,471 | 8,601,283 | 1321 | Results Received |
D22-C1 | 300 | -60 | 313.30 | 176,935 | 8,601,001 | 1326 | Results Received |
D11-C1 | 300 | -60 | 222.00 | 176,850 | 8,601,286 | 1330 | Interpreted not to have intersected target zone |
Q3-C3 | 340 | -60 | 273.00 | 172470 | 8585818 | 1214 | Results Received |
P4-C1 | 320 | -60 | 267.50 | 187502 | 8585289 | 1158 | Results Received |
L4-C1 | 140 | -60 | 149.80 | 190899 | 8602496 | 1215 | Did not intersect mineralization |
L4-C2 | 140 | -75 | 131.80 | 188262 | 8604476 | 1264 | Did not intersect mineralization |
Q5-C1 | 330 | -70 | 278.20 | 171401 | 8584131 | 1168 | Did not intersect mineralization |
QUALITY ASSURANCE AND QUALITY CONTROL
The results reported here for this core drilling program were analyzed by Intertek Genalysis, an independent and accredited laboratory. Samples were prepared at their facility in Kitwe, Zambia and analytical work conducted in Perth, Australia. The results were determined using multi-acid, near total digest, and analyzed by Inductively Coupled Plasma ("ICP") Optical (Atomic) Emission Spectrometry ("OES"). The core sampling was conducted with a robust sampling protocol that included the appropriate insertion of standard reference material, duplicates and blanks into the sample stream. Field operations and management have been provided by Remote Exploration Services ("RES") an independent geological consulting and contracting company. The core drilling was conducted by BluRock Mining (Drilling) Services of Kitwe, Zambia.
KAZAN GOLD PROJECT: OPERATIONAL UPDATE
In November 2023, the Company completed a very modest initial phase of drilling which included 449 metres of scout core drilling in two holes at the Todoroki Gold-Silver Project in Hokkaido, Japan ("Todoroki"). The results from this initial phase of Todoroki drilling have been received. Drill hole TK23-02 intersected three shallow, quartz and quartz-carbonate veins grading 0.08, 0.48 and 0.32 grams per tonne ("g/t") gold, associated with 26.9, 33.2 and 3.3 g/t silver respectively.
Future drill targets at Todoroki will be designed to intersect at deeper levels within interpreted extensions of the historical Todoroki Mine vein system. The Company is also working on generating additional drill targets at its Kazan Gold portfolio of five gold projects in Japan.
Table 4: Kazan Gold: Todoroki Gold Project: TK23-02 Drill Hole Results
Drill hole and Interval | From (m) | To (m) | Core Interval (m) | Au g/t | Ag g/t | Comments |
TK23-02 | 40.95 | 42.16 | 1.21 | 0.08 | 26.9 | Quartz vein hosted in andesite volcanic unit |
183.52 | 185.32 | 1.80 | 0.48 | 33.2 | Quartz and calcite veins hosted in andesite volcanic unit | |
187.12 | 188.12 | 1.00 | 0.32 | 3.3 | Quartz and calcite veins hosted in andesite volcanic unit | |
Table 4 Notes: Intertek Testing Services completed the analytical work with the core samples processed at their accredited laboratory in Manila, Philippines (See details in QA/QA section below). Reported widths are drilled core lengths as true widths are unknown at this time. Based upon current data it is estimated true widths range between 55 to
Table 5: Kazan Gold: Todoroki Project TK23-01 and TK23-02: Drill Hole ID, Azimuth, Dip, End of Hole Depth and Collar Coordinates
Drill Hole ID | Azimuth Degree | Dip Degree | End of hole Depth (m) | Easting (m) | Northing (m) | Elevation (m) | Status |
TK23-01 | 350 | -45 | 211.00 | 493428 | 4762561 | 475 | No mineralization intersected |
TK23-02 | 330 | -45 | 238.30 | 493560 | 4762646 | 496 | Results received |
QUALITY ASSURANCE AND QUALITY CONTROL
The new results reported here for this core drilling program were analyzed by Intertek Testing Services, an independent and accredited laboratory. Samples were prepared and analytical work conducted in Manila, Philippines. The results were obtained using the following analytical methods as appropriate to determine the gold grades; FA50N/AA of 50g fire assay, with Atomic Absorption Spectrometry ("AAS") finish and FA50GR/GR of 50g fire assay with Gravimetric finish for over limit samples exceeding 10 g/t Au. The core sampling was conducted with a robust sampling protocol that included the appropriate insertion of standard reference material, duplicates, and blanks into the sample stream. Field operations and management have been conducted by BeMetals' personnel. The core drilling was conducted by Energold Drilling.
QUALIFIED PERSON STATEMENT
The technical information in this news release for BeMetals has been reviewed and approved by John Wilton, CGeol FGS, CEO and President of BeMetals, and a "Qualified Person" as defined under National Instrument 43-101.
ON BEHALF OF BEMETALS CORP.
"John Wilton"
John Wilton
President, CEO and Director
For further information about BeMetals please visit our website at bemetalscorp.com and sign-up to our email list to receive timely updates, or contact:
Derek Iwanaka
Vice President, Investor Relations & Corporate Development
Telephone: 604-928-2797
Email: diwanaka@bemetalscorp.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Note Regarding Forward-Looking Statements
This news release contains "forward-looking statements" and "forward looking information" (as defined under applicable securities laws), based on management's best estimates, assumptions and current expectations. Such statements include but are not limited to, statements with respect to future exploration, development and advancement of the Kazan Projects in Japan and the Pangeni Project in Zambia, and the acquisition of additional base and/or precious metal projects. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts", "anticipates", "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements, including but not limited to: the actual results of exploration activities, the availability of financing and/or cash flow to fund the current and future plans and expenditures, the ability of the Company to satisfy the conditions of the option agreement for the Pangeni Project, and changes in the world commodity markets or equity markets. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward-looking statements or forward looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place undue reliance on forward-looking statements and information. Please refer to the Company's most recent filings under its profile at www.sedarplus.ca for further information respecting the risks affecting the Company and its business.
SOURCE: BeMetals Corp.
View the original press release on accesswire.com
FAQ
What are the highlights of the recent drilling results at the Pangeni Copper Project for BeMetals (BMTLF)?
What is the significance of the new data from drill hole D14-C1 for BeMetals (BMTLF)?
What is the current focus of BeMetals (BMTLF) regarding the Pangeni Copper Project in Zambia?
Who is leading the exploration efforts at the Pangeni Copper Project for BeMetals (BMTLF)?