Avalon Undertakes a Mineral Resource Estimate Update following Positive Drill Results for Separation Rapids JV, ON
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) and its JV partner Sibelco are updating the mineral resource estimate for the Separation Rapids Project in Kenora, Ontario. The 2024 winter drill campaign showed significant lithium intersections, including:
- SR24-114: 1.67% Li2O over 105.6m from 313.5m depth
- SR24-113: 1.68% Li2O over 66.2m from 292.2m depth
- SR24-115: 1.81% Li2O over 13.8m from 93.5m depth
These results confirm high-grade lithium and potential to increase the mineral resource base. The updated MRE is expected in Q3 2024. Avalon's CEO Scott Monteith expressed confidence in increasing the resource base and highlighted the project's importance for Canada's Critical Mineral Strategy and Avalon's Thunder Bay Processing facility.
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) e il suo partner di joint venture Sibelco stanno aggiornando la stima delle risorse minerarie per il Progetto Separation Rapids a Kenora, Ontario. La campagna di perforazione invernale del 2024 ha mostrato intersezioni significative di litio, tra cui:
- SR24-114: 1,67% Li2O su 105,6m a una profondità di 313,5m
- SR24-113: 1,68% Li2O su 66,2m a una profondità di 292,2m
- SR24-115: 1,81% Li2O su 13,8m a una profondità di 93,5m
Questi risultati confermano un litio di alta qualità e il potenziale per aumentare la base delle risorse minerarie. Si prevede che l'aggiornamento della MRE sia disponibile nel terzo trimestre del 2024. Il CEO di Avalon, Scott Monteith, ha espresso fiducia nell'aumento della base delle risorse e ha sottolineato l'importanza del progetto per la Strategia dei Minerali Critici del Canada e per l'impianto di processamento Thunder Bay di Avalon.
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) y su socio de joint venture Sibelco están actualizando la estimación de recursos minerales para el Proyecto Separation Rapids en Kenora, Ontario. La campaña de perforación invernal de 2024 mostró intersecciones significativas de litio, incluyendo:
- SR24-114: 1.67% Li2O sobre 105.6m desde una profundidad de 313.5m
- SR24-113: 1.68% Li2O sobre 66.2m desde una profundidad de 292.2m
- SR24-115: 1.81% Li2O sobre 13.8m desde una profundidad de 93.5m
Estos resultados confirman la presencia de litio de alta ley y el potencial para aumentar la base de recursos minerales. Se espera que la actualización de la MRE esté disponible en el tercer trimestre de 2024. El CEO de Avalon, Scott Monteith, expresó confianza en aumentar la base de recursos y destacó la importancia del proyecto para la Estrategia de Minerales Críticos de Canadá y para la instalación de procesamiento Thunder Bay de Avalon.
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF)와 그 합작 투자 파트너 Sibelco가 온타리오주 케노라의 Separation Rapids 프로젝트에 대한 광물 자원 추정치를 업데이트하고 있습니다. 2024년 겨울 드릴 캠페인은 상당한 리튬 교차점을 보여주었으며, 그 중 일부는 다음과 같습니다:
- SR24-114: 105.6m에서 1.67% Li2O, 깊이 313.5m
- SR24-113: 66.2m에서 1.68% Li2O, 깊이 292.2m
- SR24-115: 13.8m에서 1.81% Li2O, 깊이 93.5m
이러한 결과는 고품질 리튬을 확인시켜 주며, 광물 자원 기반을 증가시킬 잠재력을 보여줍니다. 업데이트된 MRE는 2024년 3분기에 공개될 것으로 예상됩니다. Avalon의 CEO인 Scott Monteith는 자원 기반 증가에 대한 확신을 표명하며, 이 프로젝트가 캐나다의 중요 광물 전략 및 Avalon의 Thunder Bay 가공 시설에 얼마나 중요한지를 강조했습니다.
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) et son partenaire de coentreprise Sibelco mettent à jour l'estimation des ressources minérales pour le projet Separation Rapids à Kenora, Ontario. La campagne de forage hivernal de 2024 a montré des intersections significatives de lithium, y compris :
- SR24-114 : 1,67 % Li2O sur 105,6 m à une profondeur de 313,5 m
- SR24-113 : 1,68 % Li2O sur 66,2 m à une profondeur de 292,2 m
- SR24-115 : 1,81 % Li2O sur 13,8 m à une profondeur de 93,5 m
Ces résultats confirment la présence de lithium de haute teneur et le potentiel d'augmenter la base de ressources minérales. La mise à jour de la MRE est prévue pour le troisième trimestre 2024. Le PDG d'Avalon, Scott Monteith, a exprimé sa confiance dans l'augmentation de la base de ressources et a souligné l'importance du projet pour la stratégie canadienne des minéraux critiques et l'installation de traitement d'Avalon à Thunder Bay.
Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) und sein JV-Partner Sibelco aktualisieren die Schätzung der Mineralressourcen für das Separation Rapids-Projekt in Kenora, Ontario. Die Winterbohrkampagne 2024 zeigte signifikante Lithium-Intersektionen, darunter:
- SR24-114: 1,67% Li2O über 105,6m bei einer Tiefe von 313,5m
- SR24-113: 1,68% Li2O über 66,2m bei einer Tiefe von 292,2m
- SR24-115: 1,81% Li2O über 13,8m bei einer Tiefe von 93,5m
Diese Ergebnisse bestätigen hohen Lithiumgehalt und das Potenzial zur Erhöhung der Mineralressourcen. Das aktualisierte MRE wird im dritten Quartal 2024 erwartet. Avalons CEO Scott Monteith äußerte Vertrauen in die Erhöhung der Ressourcenbasis und hob die Bedeutung des Projekts für die kanadische Strategie für kritische Mineralien und Avalons Verarbeitungsanlage in Thunder Bay hervor.
- Significant high-grade lithium intersections in drill results, indicating potential resource expansion
- Joint venture partnership with Sibelco for the Separation Rapids Project
- Mineral Resource Estimate update expected in Q3 2024, potentially increasing the resource base
- Project aligns with Canada's Critical Mineral Strategy
- Potential to accelerate Avalon's corporate strategy for Thunder Bay Processing facility
- Results for five remaining drillholes are still pending, which could impact the overall assessment
Toronto, Ontario--(Newsfile Corp. - August 13, 2024) - Avalon Advanced Materials Inc.(TSX: AVL) (OTCQB: AVLNF) ("Avalon" or the "Company"), in conjunction with its Joint-Venture ("JV") partner SCR-Sibelco NV ("Sibelco"), is delighted to announce the commencement of an upcoming mineral resource update for the Separation Rapids Project in Kenora, Ontario. Managed by the Joint Venture Company Separation Rapids Ltd. ("SRL"), the 2024 winter drill campaign focused on a critical part of SRL's strategy to upgrade the 2023 Mineral Resource Estimation ("MRE") classification and to expand the mineral resource base.
Key Highlights of the 2023/2024 Drilling Results to Date: (NR Dated July 22, 2024)
The first batch of the 2024 winter drill campaign demonstrated significant lithium intersections, with key results including:
SR24-114 intersected
1.67% Li2O over 105.6 meters from 313.5 meters depth and1.78% Li2O over 21.5 meters from 143.5 meters depthSR24-113 intersected
1.68% Li2O over 66.2 meters from 292.2 meters depth and1.95% Li2O over 32.6 meters from 121.0 meters depthSR24-115 intersected
1.81% Li2O over 13.8 meters from 93.5 meters depthSR24-116 intersected
1.69% Li2O over 8.9 meters from 313 meters depth and1.67% Li2O over 12.7 meters from 325.3 meters depth
The results confirm the high-grade lithium and the potential to increase the mineral resource base
The results for the five remaining drillholes are currently pending and will be released shortly
Scott Monteith, CEO and Director of Avalon Advanced Materials Inc. commented, "We are excited with the recent drill results, which clearly demonstrate mineralization beyond the current mineral resource base. Sibelco our JV partner has been exceptional in selecting drill targets and our technical team is very confident that we will increase the resource base. This update will indicate a true reflection of the potential of this project and indicate additional exploration targets.
As we eagerly await the results from the second batch of drilling, we are beginning to update the 2023 MRE, which is on track for release in Q3 2024. Avalon is positioned exceptionally well with a lithium resource that will be instrumental in Canada's Critical Mineral Strategy and will help accelerate our corporate strategy with respect to our Thunder Bay Processing facility."
Figure 1: Five drill holes returned significant drill intercepts greater >/=
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3386/219686_3e8c4ff684fe9bf8_001full.jpg
The ongoing developments at Separation Rapids highlight Avalon's pivotal role in bolstering the supply chain for the burgeoning electric vehicle market in North America, as well as the glass ceramics industry.
Table 1: Drill Intersections from News Release July 22, 2024
ID | Az. | Dip | From (m) | To (m) | Interval (m) | True Thickness (m) | Li2O% | Intercept |
SR24-113 | 195 | -76 | 93.25 | 96.15 | 2.90 | 2.81 | 1.40 | 1.4 Li2O% over 2.9m |
101.85 | 103.90 | 2.05 | 1.99 | 1.25 | 1.25 Li2O% over 2.05m | |||
121.00 | 153.60 | 32.60 | 31.63 | 1.95 | 1.95 Li2O% over 32.6m | |||
178.10 | 180.60 | 2.50 | 2.43 | 1.38 | 1.38 Li2O% over 2.5m | |||
190.40 | 191.10 | 0.70 | 0.68 | 1.39 | 1.39 Li2O% over 0.7m | |||
193.60 | 194.00 | 0.40 | 0.39 | 1.40 | 1.4 Li2O% over 0.4m | |||
203.70 | 204.60 | 0.90 | 0.87 | 1.47 | 1.47 Li2O% over 0.9m | |||
228.65 | 229.35 | 0.70 | 0.68 | 2.51 | 2.51 Li2O% over 0.7m | |||
244.00 | 247.00 | 3.00 | 2.91 | 1.75 | 1.75 Li2O% over 3m | |||
292.25 | 358.45 | 66.20 | 64.23 | 1.68 | 1.68 Li2O% over 66.2m | |||
358.70 | 360.00 | 1.30 | 1.26 | 1.39 | 1.39 Li2O% over 1.3m | |||
364.00 | 365.30 | 1.30 | 1.26 | 1.42 | 1.42 Li2O% over 1.3m | |||
365.60 | 371.35 | 5.75 | 5.58 | 1.61 | 1.61 Li2O% over 5.75m | |||
SR24-114 | 197 | -75 | 143.50 | 165.00 | 21.50 | 20.77 | 1.78 | 1.78 Li2O% over 21.5m |
170.90 | 176.60 | 5.70 | 5.51 | 1.93 | 1.93 Li2O% over 5.7m | |||
177.20 | 188.50 | 11.30 | 10.91 | 1.86 | 1.86 Li2O% over 11.3m | |||
192.75 | 194.85 | 2.10 | 2.03 | 2.08 | 2.08 Li2O% over 2.1m | |||
195.60 | 196.70 | 1.10 | 1.06 | 0.88 | 0.88 Li2O% over 1.1m | |||
197.00 | 198.75 | 1.75 | 1.69 | 1.39 | 1.39 Li2O% over 1.75m | |||
199.50 | 201.00 | 1.50 | 1.45 | 1.14 | 1.14 Li2O% over 1.5m | |||
203.70 | 204.35 | 0.65 | 0.63 | 1.45 | 1.45 Li2O% over 0.65m | |||
213.00 | 214.00 | 1.00 | 0.97 | 2.87 | 2.87 Li2O% over 1m | |||
244.00 | 245.30 | 1.30 | 1.26 | 1.53 | 1.53 Li2O% over 1.3m | |||
246.15 | 247.20 | 1.05 | 1.01 | 1.12 | 1.12 Li2O% over 1.05m | |||
250.65 | 252.70 | 2.05 | 1.98 | 1.33 | 1.33 Li2O% over 2.05m | |||
253.25 | 255.00 | 1.75 | 1.69 | 1.12 | 1.12 Li2O% over 1.75m | |||
258.25 | 260.05 | 1.80 | 1.74 | 1.79 | 1.79 Li2O% over 1.8m | |||
264.90 | 267.90 | 3.00 | 2.90 | 2.01 | 2.01 Li2O% over 3m | |||
290.40 | 291.30 | 0.90 | 0.87 | 1.79 | 1.79 Li2O% over 0.9m | |||
307.75 | 309.10 | 1.35 | 1.30 | 1.39 | 1.39 Li2O% over 1.35m | |||
310.75 | 312.90 | 2.15 | 2.08 | 1.70 | 1.7 Li2O% over 2.15m | |||
313.15 | 418.80 | 105.65 | 102.05 | 1.67 | 1.67 Li2O% over 105.65m | |||
416.25 | 418.80 | 2.55 | 2.46 | 1.50 | 1.5 Li2O% over 2.55m | |||
421.40 | 423.15 | 1.75 | 1.69 | 1.07 | 1.07 Li2O% over 1.75m | |||
424.00 | 425.00 | 1.00 | 0.97 | 1.52 | 1.52 Li2O% over 1m | |||
427.00 | 431.00 | 4.00 | 3.86 | 1.48 | 1.48 Li2O% over 4m | |||
SR24-115 | 178 | -53 | 75.00 | 77.00 | 2.00 | 1.60 | 1.76 | 1.76 Li2O% over 2m |
93.50 | 107.30 | 13.80 | 11.02 | 1.81 | 1.81 Li2O% over 13.8m | |||
105.50 | 107.30 | 1.80 | 1.44 | 2.79 | 2.79 Li2O% over 1.8m | |||
108.55 | 112.50 | 3.95 | 3.15 | 1.38 | 1.38 Li2O% over 3.95m | |||
126.25 | 126.90 | 0.65 | 0.52 | 2.03 | 2.03 Li2O% over 0.65m | |||
127.40 | 128.30 | 0.90 | 0.72 | 1.49 | 1.49 Li2O% over 0.9m | |||
131.90 | 132.65 | 0.75 | 0.60 | 1.44 | 1.44 Li2O% over 0.75m | |||
134.55 | 134.80 | 0.25 | 0.20 | 1.28 | 1.28 Li2O% over 0.25m | |||
174.20 | 175.00 | 0.80 | 0.64 | 1.65 | 1.65 Li2O% over 0.8m | |||
175.45 | 175.65 | 0.20 | 0.16 | 1.46 | 1.46 Li2O% over 0.2m | |||
SR24-116 | 192 | -71 | 300.30 | 301.40 | 1.10 | 1.04 | 1.49 | 1.49 Li2O% over 1.1m |
302.00 | 302.50 | 0.50 | 0.47 | 1.66 | 1.66 Li2O% over 0.5m | |||
303.80 | 305.85 | 2.05 | 1.94 | 1.83 | 1.83 Li2O% over 2.05m | |||
306.05 | 312.55 | 6.50 | 6.15 | 1.66 | 1.66 Li2O% over 6.5m | |||
313.00 | 321.95 | 8.95 | 8.46 | 1.69 | 1.69 Li2O% over 8.95m | |||
325.30 | 338.05 | 12.75 | 12.06 | 1.67 | 1.67 Li2O% over 12.75m | |||
340.15 | 340.45 | 0.30 | 0.28 | 1.64 | 1.64 Li2O% over 0.3m | |||
343.30 | 343.55 | 0.25 | 0.24 | 1.92 | 1.92 Li2O% over 0.25m | |||
SR24-117 | 175 | -54 | 93.25 | 93.75 | 0.50 | 0.40 | 1.08 | 1.08 Li2O% over 0.5m |
132.40 | 133.55 | 1.15 | 0.93 | 1.58 | 1.58 Li2O% over 1.15m |
Rules for Intercept Calculation
1 - values of >/= |
2 - published intercepts still stand if intercepts are >/=0.5 % when higher grade includings are removed |
3 - each reported intercept supported by mineralized pegmatite as logged in drill core |
4 - Zones of <0.5 % Li2O are not published as standalone, but included in intercept calculations if a continued zone is <1.0m |
5 - intercepts <0.5m are removed from table - comment in release will be noted |
Quality Assurance-Quality Control ("QA/QC")
QA/QC protocols followed at the insertion of blanks and standards at regular intervals in each sample batch. Drill core is cut in half with one half retained at site, the other half tagged and sent to ALS in Thunder Bay.
Prep and Analytical Methods Used:
PREP-33D - Log, Crush - Fine Crushing
ME-4ACD81 - this is a multielement analysis using four acid digestion, that includes lithium to 10,000 ppm (
1% ) Li (2.15% Li2O)ME-ICP06 - is a "whole rock" analysis that covers components such as silicon, sodium, potassium and iron so is useful as a check on rock type, feldspar content and type, and amphibolite content.
ME-MS81 - is a fusion multielement analysis that includes important pegmatite elements such as Rb, Ta, Nb and Sn
F- IC881 - a fluorine specific analysis that clearly indicates whether lepidolite is present in the rock. Any value over 10,000 ppm (
1% ) F is likely to be Unit 6d - the lepidolite bearing unit.
Any sample that exceeds the lithium limits for ME-4ACD81 (
Qualified Person (QP) and NI43-101 Disclosure
Andrew J. Ramcharan, P.Eng, VP Corporate Development for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.
About Avalon Advanced Materials Inc.
Avalon Advanced Materials Inc. is a Canadian advanced manufacturing company focused on vertically integrating the Ontario lithium supply chain. The Company, through its joint venture with SCR-Sibelco NV, is currently developing its Separation Rapids lithium deposit near Kenora, ON, while also continuing to advance the Snowbank lithium and Lilypad lithium-caesium projects. Avalon is also working to develop its Nechalacho rare earths and zirconium project located in the Northwest Territories. This deposit contains critical minerals for use in advanced technologies in the communications and defense industries among other sectors.
In addition to these upstream activities, Avalon is executing on a key initiative to develop Ontario's first midstream lithium hydroxide processing facility in Thunder Bay, ON, a vital link bridging the lithium resources of the north with the downstream EV battery manufacturing base in the south.
For questions or feedback, please email the Company at ir@AvalonAM.com or contact Ms. Rachel Naji, Investor Relations Manager at 416-364-4938.
Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to statements related to planned work at the Project, and that we expect more news in the coming weeks. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "add" or "additional", "advancing", "anticipates" or "does not anticipate", "appears", "believes", "can be", "conceptual", "confidence", "continue", "convert" or "conversion", "deliver", "demonstrating", "estimates", "encouraging", "expand" or "expanding" or "expansion", "expect" or "expectations", "forecasts", "forward", "goal", "improves", "increase", "intends", "justification", "plans", "potential" or "potentially", "promise", "prospective", "prioritize", "reflects", "robust", "scheduled", "suggesting", "support", "top-tier", "updating", "upside", "will be" or "will consider", "work towards", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved".
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including risks associated with mineral exploration and development operations such as: environmental hazards and economic factors as they affect the cost and success of the Company's capital expenditures, the ability of the Company to obtain required permits and approvals, the ability of the Company to obtain financing, uncertainty in the estimation of mineral resources, uncertainty with respect to the ability to successfully construct and develop the Company's lithium processing facility, the price of lithium, no operating history, no operating revenue and negative cash flow, land title risk, the market price of the Company's securities, the economic feasibility of the Company's mineral resources and the Company's commercial viability, inflation and uncertain global economic conditions, uncertain geo-political shifts and risks, successful collaboration with indigenous communities, changes in technology and advancements in innovation may impact the development of the Company's technology innovation centre and its lithium hydroxide processing facility, future pandemics and other health crises, dependence on management and other highly skilled personnel, title to the Company's mineral properties, the ongoing war in Ukraine and Israel, extensive government and environmental regulation, reliance on artificial intelligence technology to influence mining operations, volatility in the financial markets, uninsured risks, climate change, threat of legal proceedings, as well as those risk factors discussed or referred to in the annual information form of the Company dated November 28, 2023 (the "AIF") under the heading "Description of the Business - Risk Factors". Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Although the Company believes that the assumptions and expectations reflected in such forward-looking information are reasonable, undue reliance should not be placed on forward-looking information because the Company can give no assurance that such expectations will prove to be correct. In addition to other factors and assumptions identified in the AIF, assumptions have been made regarding, among other things: management of certain of the Company's assets by other companies or joint venture partners, the Company's ability to carry on its exploration and development activities without undue delays or unbudgeted costs, the ability of the Company to obtain sufficient qualified personnel, equipment and services in a timely and cost effective manner, the ability of the Company to operate in a safe, efficient and effective manner, the ability of the Company to obtain all necessary financing on acceptable terms and when needed, the accuracy of the Company's resource estimates and geological, operational and price assumptions on which these are based and the continuance of the regulatory framework regarding environmental manners. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions that may have been used. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/219686
FAQ
What were the key lithium intersections in Avalon's 2024 winter drill campaign at Separation Rapids?
When is Avalon (AVLNF) expecting to release the updated Mineral Resource Estimate for Separation Rapids?
How do the recent drill results impact Avalon's (AVLNF) Separation Rapids Project?