Arizona Sonoran Drills 1.97% CuT over 540 ft (164.6 m) at Parks/Salyer and Begins Drilling South of the Parks/Salyer Deposit
- None.
- None.
Additionally, the Company has begun exploratory drilling at the MainSpring property (
Drilling Highlights:
-
Drilling
-
Exploration: Up to 10 drill holes targeting mineralization 1,500 ft (457 m) south of the
Parks /Salyer deposit at MainSpring -
Development: 125 ft (38 m) drill spacing used for Cactus East and
Parks /Salyer drilling programs targeting definition of measured resources
-
Exploration: Up to 10 drill holes targeting mineralization 1,500 ft (457 m) south of the
-
ECP-164 (P/S): 540.0 ft (164.6 m) @
1.97% CuT,1.80% Cu TSol,0.013% Mo (enriched)-
Incl 210.0 ft (64.0m) @
2.96% CuT,2.88% Cu TSol,0.011% Mo
-
Incl 210.0 ft (64.0m) @
-
ECP-161 (P/S): 754.7 ft (230.0 m) @
1.34% CuT,1.12% Cu TSol,0.016% Mo (enriched)-
Incl 50.0 ft (15.2 m) @
1.91% CuT,1.47% Cu TSol,0.009% Mo
-
Incl 50.0 ft (15.2 m) @
-
ECP-171 (P/S): 538.5 ft (164.1 m) @
1.65% CuT,1.51% Cu TSol,0.006% Mo (enriched)-
Incl 170.0 ft (51.8) @
2.49% CuT,2.42% Cu TSol,0.006% Mo -
569.8 ft (173.7 m) @
0.69% CuT,0.018% Mo (primary)
-
Incl 170.0 ft (51.8) @
-
ECE-149 (East): 273.4 ft (83.3 m) @
2.66% CuT,2.49% Cu TSol,0.032% Mo (enriched)-
Incl 121.9 ft (37.2 m) @
3.96% CuT,3.83% Cu TSol,0.035% Mo
-
Incl 121.9 ft (37.2 m) @
-
ECE-143 (East): 635.2 ft (193.6 m) @
1.17% CuT of continuous mineralization-
487.5 ft (148.6 m) @
1.39% CuT,1.30% Cu TSol,0.032% Mo (enriched) -
Incl 240.0 ft (73.2 m) @
2.29% CuT,2.20% Cu TSol,0.040% Mo -
147.7 ft (45 m) @
0.43% CuT,0.020% Mo (primary)
-
487.5 ft (148.6 m) @
-
ECP-167 (P/S): 461.2 ft (140.6 m) @
1.51% CuT,1.10% Cu TSol,0.014% Mo (enriched)-
Incl 110.9 ft (33.8 m) @
2.52% CuT,2.43% Cu TSol,0.007% Mo -
139.3 ft (42.5 m) @
0.82% CuT,0.032% Mo (primary)
-
Incl 110.9 ft (33.8 m) @
-
ECE-146 (East): 784.7 ft (239.2 m) @ 0.90 % CuT of near continuous mineralization
-
168.1 ft (51.2 m) @
1.34% CuT,1.30% Cu TSol,0.09% Mo (oxide) -
Incl 35.2 ft (10.7 m) @
3.19% CuT,3.11% Cu TSol,0.011% Mo -
312.0 ft (95.1 m) @
1.23% CuT,1.09% Cu TSol,0.017% Mo (enriched) -
Incl 131.0 ft (39.9 m) @
1.97% CuT,1.87% Cu TSol,0.017% Mo
-
168.1 ft (51.2 m) @
NOTE: True widths are not known
George Ogilvie, Arizona Sonoran President and CEO commented, “At Cactus, the team continues to derisk the asset and drive project development forward on all fronts while concurrently reducing drill spacing to support Feasibility-level requirements. In addition, one drill is now focused on the extension of
Drilling Recap
A total of 106,815.9 ft (32,557.5 m) over 51 holes, from the Cactus East and
TABLE 1: Cactus East and
Holeid |
Zone |
Feet |
Metres |
Cu T |
Cu Tsol |
Mo |
||||
from |
to |
length |
from |
to |
length |
% |
% |
% |
||
|
||||||||||
ECP-161 |
enriched |
1,274.3 |
2,029.0 |
754.7 |
388.4 |
618.4 |
230.0 |
1.34 |
1.12 |
0.016 |
including |
1,317.0 |
1,367.0 |
50.0 |
401.4 |
416.7 |
15.2 |
1.91 |
1.47 |
0.009 |
|
and |
1,407.2 |
1,587.0 |
179.8 |
428.9 |
483.7 |
54.8 |
1.97 |
1.72 |
0.018 |
|
ECP-164 |
enriched |
1,397.0 |
1,937.0 |
540.0 |
425.8 |
590.4 |
164.6 |
1.97 |
1.80 |
0.013 |
including |
1,447.0 |
1,657.0 |
210.0 |
441.0 |
505.1 |
64.0 |
2.96 |
2.88 |
0.011 |
|
primary |
1,937.0 |
1,994.8 |
57.8 |
590.4 |
608.0 |
17.6 |
0.72 |
0.04 |
0.030 |
|
ECP-167 |
enriched |
852.3 |
900.6 |
48.3 |
259.8 |
274.5 |
14.7 |
0.69 |
0.67 |
0.005 |
enriched |
1,336.3 |
1,797.5 |
461.2 |
407.3 |
547.9 |
140.6 |
1.51 |
1.10 |
0.014 |
|
including |
1,376.1 |
1,487.0 |
110.9 |
419.4 |
453.2 |
33.8 |
2.52 |
2.43 |
0.007 |
|
primary |
1,797.5 |
1,936.8 |
139.3 |
547.9 |
590.3 |
42.5 |
0.82 |
0.06 |
0.032 |
|
including |
1,847.0 |
1,877.0 |
30.0 |
563.0 |
572.1 |
9.1 |
1.77 |
0.13 |
0.083 |
|
ECP-171 |
enriched |
687.0 |
736.0 |
49.0 |
209.4 |
224.3 |
14.9 |
0.49 |
0.48 |
0.004 |
enriched |
855.5 |
1,394.0 |
538.5 |
260.8 |
424.9 |
164.1 |
1.65 |
1.51 |
0.006 |
|
including |
875.0 |
915.0 |
40.0 |
266.7 |
278.9 |
12.2 |
2.09 |
2.06 |
0.004 |
|
and |
970.0 |
1,140.0 |
170.0 |
295.7 |
347.5 |
51.8 |
2.49 |
2.42 |
0.006 |
|
primary |
1,394.0 |
1,963.8 |
569.8 |
424.9 |
598.6 |
173.7 |
0.69 |
0.05 |
0.018 |
|
including |
1,465.0 |
1,499.0 |
34.0 |
446.5 |
456.9 |
10.4 |
1.07 |
0.08 |
0.005 |
|
and |
1,519.0 |
1,567.0 |
48.0 |
463.0 |
477.6 |
14.6 |
1.28 |
0.08 |
0.051 |
|
and |
1,756.4 |
1,759.0 |
2.6 |
535.4 |
536.1 |
0.8 |
15.16 |
0.78 |
0.099 |
|
CACTUS EAST |
||||||||||
ECE-143 |
enriched |
1,374.5 |
1,862.0 |
487.5 |
418.9 |
567.5 |
148.6 |
1.39 |
1.30 |
0.032 |
including |
1,396.0 |
1,636.0 |
240.0 |
425.5 |
498.7 |
73.2 |
2.29 |
2.20 |
0.040 |
|
primary |
1,862.0 |
2,009.7 |
147.7 |
567.5 |
612.6 |
45.0 |
0.43 |
0.05 |
0.020 |
|
ECE-146 |
oxide |
1,025.5 |
1,051.6 |
26.1 |
312.6 |
320.5 |
8.0 |
0.31 |
0.28 |
0.005 |
oxide |
1,122.2 |
1,290.3 |
168.1 |
342.0 |
393.3 |
51.2 |
1.34 |
1.30 |
0.009 |
|
including |
1,205.0 |
1,240.2 |
35.2 |
367.3 |
378.0 |
10.7 |
3.19 |
3.11 |
0.011 |
|
enriched |
1,354.0 |
1,666.0 |
312.0 |
412.7 |
507.8 |
95.1 |
1.23 |
1.09 |
0.017 |
|
including |
1,354.0 |
1,485.0 |
131.0 |
412.7 |
452.6 |
39.9 |
1.97 |
1.87 |
0.020 |
|
primary |
1,666.0 |
1,906.9 |
240.9 |
507.8 |
581.2 |
73.4 |
0.38 |
0.04 |
0.011 |
|
including |
1,706.9 |
1,767.1 |
60.2 |
520.3 |
538.6 |
18.3 |
0.52 |
0.05 |
0.011 |
|
ECE-149 |
oxide |
1,314.0 |
1,443.2 |
129.2 |
400.5 |
439.9 |
39.4 |
0.42 |
0.40 |
0.013 |
oxide |
1,476.0 |
1,534.2 |
58.2 |
449.9 |
467.6 |
17.7 |
1.85 |
1.82 |
0.022 |
|
including |
1,516.0 |
1,534.2 |
18.2 |
462.1 |
467.6 |
5.5 |
3.73 |
3.69 |
0.024 |
|
enriched |
1,613.0 |
1,886.4 |
273.4 |
491.6 |
575.0 |
83.3 |
2.66 |
2.49 |
0.032 |
|
including |
1,621.1 |
1,743.0 |
121.9 |
494.1 |
531.3 |
37.2 |
3.96 |
3.83 |
0.035 |
|
primary |
1,886.4 |
1,905.5 |
19.1 |
575.0 |
580.8 |
5.8 |
0.42 |
0.04 |
0.008 |
|
ECE-182 |
enriched |
1,732.0 |
1,800.3 |
68.3 |
527.9 |
548.7 |
20.8 |
0.53 |
0.50 |
0.022 |
including |
1,735.0 |
1,768.0 |
33.0 |
528.8 |
538.9 |
10.1 |
0.73 |
0.72 |
0.018 |
|
primary |
1,800.3 |
1,905.2 |
104.9 |
548.7 |
580.7 |
32.0 |
0.50 |
0.06 |
0.030 |
|
ECE-183 |
enriched |
1,672.0 |
1,744.0 |
72.0 |
509.6 |
531.6 |
21.9 |
1.10 |
0.97 |
0.018 |
primary |
1,744.0 |
1,910.8 |
166.8 |
531.6 |
582.4 |
50.8 |
0.49 |
0.07 |
0.020 |
- Intervals are presented in core length and are drilled with vertical, or steep dip angles.
-
For Cactus East: Drill assays assume a mineralized cut-off grade of
0.1% CuT reflecting the potential for heap leaching of open pit material in the case of Oxide and Enriched or in the case of Primary material to provide typical average grades. Holes were terminated below the basement fault. -
For
Parks /Salyer: Drill assays assume a mineralized cut-off grade of0.5% CuT reflecting the potential for heap leaching of underground material in the case of Oxide and Enriched or in the case of Primary material,0.1% CuT, to provide typical average grades. Holes were terminated below the basement fault. - Assay results are not capped. Intercepts are aggregated within geological confines of major mineral zones.
- True widths are not known.
Table 2: Drilling details
Hole |
Easting (m) |
Northing (m) |
Elevation (ft) |
TD (ft) |
Azimuth |
Dip |
ECE-143 |
424107.9 |
3646941.0 |
1468.7 |
2274.0 |
90.0 |
-80.0 |
ECE-146 |
424244.6 |
3647007.6 |
1501.8 |
2096.0 |
320.0 |
-80.0 |
ECE-149 |
424338.7 |
3646828.0 |
1494.1 |
2000.0 |
335.0 |
-80.0 |
ECE-182 |
424488.4 |
3647150.2 |
1512.0 |
1934.5 |
235.0 |
-80.0 |
ECE-183 |
424464.0 |
3647179.4 |
1512.0 |
2030.3 |
235.0 |
-80.0 |
ECP-161 |
421967.1 |
3644978.4 |
1376.3 |
2137.0 |
0.0 |
-90.0 |
ECP-167 |
422042.5 |
3644942.3 |
1376.2 |
1964.9 |
0.0 |
-90.0 |
ECP-171 |
421964.9 |
3644893.1 |
1374.1 |
2013.2 |
0.0 |
-90.0 |
Quality Assurance / Quality Control
Drilling completed on the project between 2020 and 2023 was supervised by on-site ASCU personnel who prepared core samples for assay and implemented a full QA/QC program using blanks, standards, and duplicates to monitor analytical accuracy and precision. The samples were sealed on site and shipped to Skyline Laboratories in
Technical aspects of this news release have been reviewed and verified by Allan Schappert – CPG #11758, who is a qualified person as defined by National Instrument 43-101– Standards of Disclosure for Mineral Projects.
Links from the Press Release
October 16, 2023: https://arizonasonoran.com/news-releases/arizona-sonoran-announces-updated-mineral-resource-estimate-for-the-cactus-project/
Figures 1-18: https://arizonasonoran.com/projects/cactus-mine-project/press-release-images/
Neither the TSX nor the regulating authority has approved or disproved the information contained in this press release.
About Arizona Sonoran Copper Company (www.arizonasonoran.com | www.cactusmine.com)
ASCU’s objective is to become a mid-tier copper producer with low operating costs and to develop the Cactus and
Forward-Looking Statements
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ASCU to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could affect the outcome include, among others: future prices and the supply of metals; the results of drilling; inability to raise the money necessary to incur the expenditures required to retain and advance the properties; environmental liabilities (known and unknown); general business, economic, competitive, political and social uncertainties; results of exploration programs; accidents, labour disputes and other risks of the mining industry; political instability, terrorism, insurrection or war; or delays in obtaining governmental approvals, projected cash operating costs, failure to obtain regulatory or shareholder approvals.
Although ASCU has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this news release and ASCU disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.
View source version on businesswire.com: https://www.businesswire.com/news/home/20231030869301/en/
Alison Dwoskin, Director, Investor Relations
647-233-4348
adwoskin@arizonasonoran.com
George Ogilvie, President, CEO and Director
416-723-0458
gogilvie@arizonasonoran.com
Source: Arizona Sonoran Copper Company Inc.
FAQ
What company is announcing the drill assays?
How many holes were drilled at Cactus East and Parks/Salyer?
What is the purpose of the exploratory drilling at the MainSpring property?
What are the mineral resource estimates for the Parks/Salyer deposit?