STOCK TITAN

Imagine Lithium Discovers New Casino Royale Lithium Zone, Intersects 1.04% Li2O over 12.80m North of Jackpot Main Zone

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary
Imagine Lithium Inc. reports intersecting a new near-surface spodumene-bearing pegmatite at the Casino Royale zone, showcasing significant lithium mineralization. The Jackpot lithium project in Ontario demonstrates promising exploration results, with a focus on resource expansion and new discoveries.
Positive
  • Positive: Discovery of a new mineralized pegmatite at the Casino Royale zone with significant lithium grades.
  • Positive: Exploration success in the underexplored Jackpot property, confirming the exploration model and potential for multiple lithium deposits.
  • Positive: Near-surface growth potential surrounding the Jackpot Main zone, supporting resource expansion.
  • Positive: Strategic location of the Jackpot Lithium project near existing infrastructure, enhancing economic prospects.
  • Positive: Implementation of a rigorous QA/QC protocol to ensure accurate assay results and data integrity.
  • Positive: Ongoing diamond drilling program and plans for an NI 43-101 mineral resource estimate by the end of 2024.
  • Positive: Experienced Qualified Person overseeing the technical aspects of the project.
  • Negative: No negative aspects identified in the press release.
Negative
  • None.

Vancouver, British Columbia--(Newsfile Corp. - April 2, 2024) - IMAGINE LITHIUM INC. (TSXV: ILI) (OTCQB: ARXRF) (the "Company" or "Imagine") is pleased to report that it has intersected a new near surface spodumene-bearing pegmatite with diamond drilling at the Casino Royale zone, located approximately 500m north of the Jackpot Main zone. The Jackpot lithium project is in the Georgia Lake Pegmatite Field, approximately 140km northeast of Thunder Bay, Ontario (Figure 1). The Jackpot property is characterized by swarms of mineralized lithium-bearing granitic pegmatite dykes distributed across five zones on an 18,800ha land package (Figure 2).

Highlights of the 2024 drill program include:

Casino Royale zone:

  • 1.09% Li2O over 7.70m from 84.85m in hole JP-24-23
  • 1.04% Li2O over 12.80m from 90.50m in hole JP-24-24
    • Including 1.35% Li2O over 6.80m from 96.50m

Jackpot Main zone:

  • 1.34% Li2O over 6.30m from 50.50m in hole JP-23-18
  • 1.02% Li2O over 10.10m from 31.10m in hole JP-23-24

J.C. St-Amour, President of Imagine, commented, "This is an untested area of the property and we are pleased to have discovered a new mineralized pegmatite in this area of the vastly underexplored Jackpot property. The newly discovered, near-surface mineralization confirms our exploration model and continues to demonstrate that our significant land package can contain multiple lithium deposits. The Casino Royale zone has been traced over 750m of strike length at surface, making it a potentially substantial new zone. Going forward, we will continue to focus our exploration efforts on new discoveries and resource expansion."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_005.jpg

Figure 1: Jackpot property located next to Trans-Canada Highway, power, port, railroad, and workforce.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_005full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_009.jpg

Figure 2: Jackpot project target zones and diamond drillhole collar locations.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_009full.jpg

Results announced today demonstrate near-surface growth potential surrounding the Jackpot Main zone (Table 1). The 2024 drill program was designed to test regional targets outside of the Jackpot Main zone that were identified during the 2023 prospecting and soil sampling programs (Figure 2). Drilling also tested boulders and outcrop located near the historical Point Lithium prospect (MDI42E05SW00021) and Carrot Lake occurrence (MDI42E05SW00023). A total of 2,691m of drill core from 24 diamond drillholes have been completed in 2024.

Drilling by the Company on the Jackpot property since 2018 totals 38,041m. The table below includes results from the Jackpot Main zone that were completed in 2023 and significant intervals from the ongoing 2024 drill program that focused on targets to the north of the Jackpot Main zone.

Table 1. Significant Li2O (%) intervals from the 2024 drill program.

HoleFrom (m)To (m)Li2O (%)Length (m)ZONE
JP-23-0648.7553.750.745.00Jackpot East
JP-23-0657.4861.480.614.00Jackpot East
JP-23-072.5011.450.788.95Jackpot East
JP-23-0718.6531.650.7313.00Jackpot East
JP-23-08138.62150.300.7511.68Jackpot East
JP-23-17118.85123.000.754.15Jackpot Main
JP-23-1850.5063.750.7513.25Jackpot East
INCLUDING50.5056.801.346.30Jackpot East
JP-23-1883.7086.501.162.80Jackpot East
JP-23-2431.1041.201.0210.10Jackpot Main
INCLUDING36.2039.201.243.00Jackpot Main
JP-23-2541.2044.001.142.80Jackpot Main
JP-24-0519.0024.000.745.00Point Lithium
JP-24-2384.8592.551.097.70Casino Royale
INCLUDING88.5592.551.784.00Casino Royale
JP-24-2490.50103.301.0412.80Casino Royale
INCLUDING96.50103.301.356.80Casino Royale

 

The Casino Royale zone currently exceeds 750m in strike length, delineated by surface grab samples and diamond drill intercepts (Figure 3). Holes JP-24-23 & JP-24-24 were drilled from the same setup, at -50o and -75o dip, intersecting 1.09% Li2O/7.70m and 1.04% Li2O/12.80m, respectively (Figure 3). The Casino Royale zone includes the historical Carrot Lake occurrence (MDI42E05SW00023) and diamond drilling is continuing to test the surface trend of mineralization (Figure 3).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_022.jpg

Figure 3: Casino Royale zone over 750 m from sample 781982, northeast through Carrot Lake occurrence (MDI42E05SW00023) to discovery holes JP-24-23 & JP-24-24.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2962/203944_2c605d8ad4a85927_022full.jpg

The Company expects to publish an NI 43-101 mineral resource estimate by the end of 2024 which will include drill results from the current program. The distinguishing feature of the Jackpot Lithium project is the existing infrastructure in the area (roads, power, labour force) and the proximity to a major port and elevates it from more remote lithium projects. This infrastructure is expected to positively impact the overall economics of the project.

QA/QC Protocol

Imagine Lithium implemented a strict QA/QC protocol in processing all rock samples collected from the core material obtained from the Jackpot property. The protocol included the insertion and monitoring of appropriate reference materials. High and low concentration certified lithium standards, blanks and duplicates are used to validate the accuracy and precision of the assay results.

All collected core rock samples were put in sturdy plastic bags, tagged, and sealed in the core shack under the supervision of a professional geologist. The sample number, depth and brief description of each sample is logged and entered to a digital database. Samples were split using a diamond saw with half of the sample remaining in the core box and the other being placed in a labelled sample bag. Duplicate samples were quarter split and placed into individual sample bags.

All sample bags were put into rice bags and stored securely before being delivered to AGAT Laboratories in Thunder Bay, Ontario. Samples are processed and crushed at the AGAT facility in Thunder Bay. Lithium was analyzed by Sodium Peroxide Fusion with ICP-OES and ICP-MS Finish.

Qualified Person

The technical content of this news release was reviewed and approved by Jason Arnold, P.Geo., an Independent Qualified Person as defined by the National Instrument 43-101.

About Imagine Lithium Inc.

Imagine is a junior mining exploration company focused on seeking and acquiring world-class mineral projects. The company holds the Jackpot lithium property located in the Georgia Lake area about 140 km NNE of Thunder Bay, Ontario, is approximately 12 km by road from the Trans-Canada Highway (Hwy 11), and is in proximity to sources of power, railroads, and ports. The property contains known lithium-bearing granitic pegmatite dykes, of which the Jackpot Main zone provided an estimated historical resource of 2 million tons at 1.09% Li2O *.

* The estimates presented above are treated as historical information and have not been verified or relied upon for economic evaluation by the Company. These historical mineral resources do not refer to any category of sections 1.2 and 1.3 of NI-43-101 such as mineral resources or mineral reserves as stated in the 2010 CIM Definition Standards on Mineral Resources and Mineral Reserves. The explanation lies in the inability by the Company to verify the data acquired by the various historical drilling campaigns. The Company has not done sufficient work yet to classify the historical estimates as current mineral resources or mineral reserves.

ON BEHALF OF THE BOARD

"J.C. St-Amour"
J.C. St-Amour, President

FOR FURTHER INFORMATION, PLEASE CONTACT:

Telephone: +1-604-683-3995
Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Investors are cautioned that these forward-looking statements are neither promises nor guarantees and are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward -looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All the forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR in Canada (available at www.sedarplus.ca).

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/203944

FAQ

What did Imagine Lithium Inc. report in the press release?

Imagine Lithium Inc. reported intersecting a new near-surface spodumene-bearing pegmatite at the Casino Royale zone.

Where is the Jackpot lithium project located?

The Jackpot lithium project is located in the Georgia Lake Pegmatite Field, approximately 140km northeast of Thunder Bay, Ontario.

What are some highlights of the 2024 drill program mentioned in the press release?

Highlights of the 2024 drill program include significant lithium grades such as 1.09% Li2O over 7.70m and 1.04% Li2O over 12.80m at the Casino Royale zone.

Who is the President of Imagine Lithium Inc.?

J.C. St-Amour is the President of Imagine Lithium Inc.

What is the distinguishing feature of the Jackpot Lithium project?

The distinguishing feature of the Jackpot Lithium project is its existing infrastructure, proximity to major facilities, and favorable economics.

What protocol did Imagine Lithium implement for sample processing?

Imagine Lithium implemented a strict QA/QC protocol for processing rock samples, including the use of certified standards, blanks, and duplicates for validation.

Who reviewed and approved the technical content of the news release?

Jason Arnold, P.Geo., an Independent Qualified Person, reviewed and approved the technical content of the news release.

What is the expected timeline for publishing a mineral resource estimate?

The Company expects to publish an NI 43-101 mineral resource estimate by the end of 2024.

IMAGINE LITHIUM INC

OTC:ARXRF

ARXRF Rankings

ARXRF Latest News

ARXRF Stock Data

4.16M
267.09M
3.62%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver