STOCK TITAN

ARIS MINING REPORTS Q1 2025 GOLD PRODUCTION ACHIEVING 8% YEAR-OVER-YEAR GROWTH

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Positive)
Tags

Aris Mining (TSX: ARIS, NYSE-A: ARMN) reported strong Q1 2025 performance with total gold production of 54,763 ounces, marking an 8% year-over-year increase from Q1 2024. The production comprised 47,549 oz from Segovia and 7,214 oz from the Marmato Upper Mine.

Key operational highlights include:

  • Segovia's processing facility handled 167,000 tonnes at 9.37 g/t gold grade with 96.1% recovery
  • Marmato Upper Mine processed 74,000 tonnes at 3.32 g/t gold grade with 91.7% recovery
  • Company maintains 2025 production guidance of 230,000-275,000 oz

The company expects additional growth with the commissioning of Segovia's expanded processing facility in Q2 2025. Segovia is projected to contribute 210,000-250,000 oz, while Marmato Upper Mine is expected to produce 20,000-25,000 oz in 2025.

Aris Mining (TSX: ARIS, NYSE-A: ARMN) ha riportato una forte performance nel primo trimestre del 2025 con una produzione totale di 54.763 once d'oro, segnando un aumento dell'8% rispetto allo stesso periodo del 2024. La produzione è stata composta da 47.549 once provenienti da Segovia e 7.214 once dalla Miniera Superiore di Marmato.

I principali punti operativi includono:

  • Il impianto di lavorazione di Segovia ha trattato 167.000 tonnellate con un grado d'oro di 9,37 g/t e un recupero del 96,1%
  • La Miniera Superiore di Marmato ha trattato 74.000 tonnellate con un grado d'oro di 3,32 g/t e un recupero del 91,7%
  • L'azienda mantiene una guida alla produzione per il 2025 di 230.000-275.000 once

L'azienda prevede una crescita ulteriore con l'entrata in funzione dell'impianto di lavorazione ampliato di Segovia nel secondo trimestre del 2025. Si prevede che Segovia contribuisca con 210.000-250.000 once, mentre la Miniera Superiore di Marmato dovrebbe produrre 20.000-25.000 once nel 2025.

Aris Mining (TSX: ARIS, NYSE-A: ARMN) reportó un sólido desempeño en el primer trimestre de 2025 con una producción total de 54,763 onzas de oro, marcando un aumento del 8% en comparación con el primer trimestre de 2024. La producción se compuso de 47,549 onzas de Segovia y 7,214 onzas de la Mina Superior de Marmato.

Los aspectos operativos clave incluyen:

  • La planta de procesamiento de Segovia manejó 167,000 toneladas con un grado de oro de 9.37 g/t y una recuperación del 96.1%
  • La Mina Superior de Marmato procesó 74,000 toneladas con un grado de oro de 3.32 g/t y una recuperación del 91.7%
  • La empresa mantiene su guía de producción para 2025 de 230,000-275,000 onzas

La empresa espera un crecimiento adicional con la puesta en marcha de la planta de procesamiento ampliada de Segovia en el segundo trimestre de 2025. Se proyecta que Segovia contribuya con 210,000-250,000 onzas, mientras que se espera que la Mina Superior de Marmato produzca 20,000-25,000 onzas en 2025.

아리스 마이닝 (TSX: ARIS, NYSE-A: ARMN)은 2025년 1분기에 총 54,763온스의 금 생산을 보고하며, 2024년 1분기 대비 8% 증가한 성과를 기록했습니다. 생산량은 세고비아에서 47,549온스, 마르마토 상부 광산에서 7,214온스로 구성되었습니다.

주요 운영 하이라이트는 다음과 같습니다:

  • 세고비아의 가공 시설은 167,000톤을 처리하며 금 함량 9.37 g/t와 96.1%의 회수율을 기록했습니다.
  • 마르마토 상부 광산은 74,000톤을 처리하며 금 함량 3.32 g/t와 91.7%의 회수율을 기록했습니다.
  • 회사는 2025년 생산 목표를 230,000-275,000온스로 유지합니다.

회사는 2025년 2분기에 세고비아의 확장된 가공 시설이 가동됨에 따라 추가 성장을 기대하고 있습니다. 세고비아는 210,000-250,000온스를 기여할 것으로 예상되며, 마르마토 상부 광산은 2025년에 20,000-25,000온스를 생산할 것으로 예상됩니다.

Aris Mining (TSX: ARIS, NYSE-A: ARMN) a rapporté une solide performance au premier trimestre 2025 avec une production totale de 54 763 onces d'or, marquant une augmentation de 8 % par rapport au premier trimestre 2024. La production était composée de 47 549 onces provenant de Segovia et de 7 214 onces de la Mine Supérieure de Marmato.

Les points opérationnels clés incluent:

  • La centrale de traitement de Segovia a traité 167 000 tonnes avec un grade d'or de 9,37 g/t et un taux de récupération de 96,1 %
  • La Mine Supérieure de Marmato a traité 74 000 tonnes avec un grade d'or de 3,32 g/t et un taux de récupération de 91,7 %
  • L'entreprise maintient ses prévisions de production pour 2025 à 230 000-275 000 onces

L'entreprise prévoit une croissance supplémentaire avec la mise en service de la centrale de traitement agrandie de Segovia au deuxième trimestre 2025. Segovia devrait contribuer avec 210 000-250 000 onces, tandis que la Mine Supérieure de Marmato devrait produire 20 000-25 000 onces en 2025.

Aris Mining (TSX: ARIS, NYSE-A: ARMN) berichtete über eine starke Leistung im ersten Quartal 2025 mit einer Gesamtproduktion von 54.763 Unzen Gold, was einem Anstieg von 8% im Vergleich zum ersten Quartal 2024 entspricht. Die Produktion bestand aus 47.549 Unzen aus Segovia und 7.214 Unzen aus der oberen Mine von Marmato.

Wichtige betriebliche Highlights sind:

  • Die Verarbeitungsanlage in Segovia verarbeitete 167.000 Tonnen mit einem Goldgehalt von 9,37 g/t und einer Rückgewinnungsrate von 96,1%
  • Die obere Mine von Marmato verarbeitete 74.000 Tonnen mit einem Goldgehalt von 3,32 g/t und einer Rückgewinnungsrate von 91,7%
  • Das Unternehmen hält die Produktionsprognose für 2025 bei 230.000-275.000 Unzen

Das Unternehmen erwartet weiteres Wachstum mit der Inbetriebnahme der erweiterten Verarbeitungsanlage in Segovia im zweiten Quartal 2025. Es wird prognostiziert, dass Segovia 210.000-250.000 Unzen beitragen wird, während die obere Mine von Marmato voraussichtlich 20.000-25.000 Unzen im Jahr 2025 produzieren wird.

Positive
  • 8% year-over-year growth in gold production
  • Q1 2025 production exceeded budget targets
  • Improved recovery rates at both operations
  • Expanded Segovia processing facility on track for Q2 2025 commissioning
Negative
  • Slight decrease in Segovia's average gold grade from 9.42 g/t in Q1 2024 to 9.37 g/t in Q1 2025

Insights

Aris Mining's 8% year-over-year gold production growth to 54,763 ounces represents solid operational execution across both mining operations. The company's primary Segovia operation contributed 47,549 ounces (87% of total production) while processing 1,966 tonnes per day, a 8.2% increase in throughput compared to Q1 2024.

Two critical operational metrics show particular strength: First, the processing capacity utilization continues to improve, with tonnage increasing at both operations. Second, recovery rates remain excellent at 96.1% for Segovia and 91.7% for Marmato, representing incremental improvements over the previous year.

The imminent commissioning of Segovia's expanded processing facility in Q2 2025 represents a significant inflection point. This capacity expansion should drive production increases in the second half of 2025, positioning the company to achieve its full-year guidance of 230,000-275,000 ounces.

Q1 2025 performance exceeded internal budget targets, demonstrating management's operational control and realistic planning capabilities. With consistent grade profiles at Segovia (9.37 g/t vs. 9.42 g/t in Q1 2024) and slight grade improvement at Marmato (3.32 g/t vs. 3.27 g/t), the company is maintaining ore quality while increasing throughput – a challenging balance in underground mining operations.

Aris Mining's Q1 production results signal robust operational momentum that should translate to improved financial performance. The 8% production growth year-over-year provides a solid foundation for revenue expansion, particularly with gold prices near historic highs.

The production profile shows improving scale economics, with Segovia's tonnage increasing 8.4% year-over-year while maintaining nearly identical grade (9.37 g/t vs 9.42 g/t). The Marmato operation showed even stronger throughput growth of 19.4% alongside improved recoveries, suggesting optimization efforts are yielding results.

The upcoming Segovia processing facility expansion represents a key inflection point that should accelerate production volumes in the latter half of 2025. This positions Aris to potentially achieve the upper end of its 230,000-275,000 ounce guidance range, which would represent up to 30.6% growth from 2024's combined production of 210,955 ounces.

Sales volumes align closely with production figures (47,390 ounces sold vs. 47,549 ounces produced at Segovia), indicating efficient inventory management and revenue conversion. The operational metrics suggest Aris Mining has established a solid growth trajectory with clear catalysts for near-term expansion as the company executes on its processing capacity investments.

VANCOUVER, BC, April 8, 2025 /PRNewswire/ - Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS) (NYSE-A: ARMN) reports gold production of 54,763 ounces (oz) for the first quarter of 2025 (Q1 2025), with 47,549 oz from Segovia and 7,214 oz from the Marmato Upper Mine.

Q1 2025 Gold Production Highlights:

  • Positive trends across both the Segovia and Marmato operations, with a total gold production of 54,763 oz in Q1 2025, up 8% compared to 50,767 oz in Q1 2024.
  • Q1 2025 production reflects strong operational momentum heading into 2025. With the commissioning of the expanded Segovia processing facility on track for Q2 2025, additional production growth is anticipated in the coming quarters.
  • Aris Mining's 2025 full-year production guidance is between 230,000 to 275,000 oz, with Segovia expected to produce 210,000 to 250,000 oz and the Marmato Upper Mine expected to contribute 20,000 to 25,000 oz.  

Chart 1: Q1 2025 Gold Production (oz) Year-over-Year (CNW Group/Aris Mining Corporation)

*The Q1 2025 results provided in this news release are approximate and may differ from the final results to be included in the Company's 2025 interim financial statements and MD&A, which the Company expects to release in early May 2025.

Neil Woodyer, CEO of Aris Mining, commented "We kicked off 2025 with strong momentum, highlighting our ability to effectively execute while advancing major growth initiatives. Q1 production came in slightly ahead of our budget target reflecting a solid operational start to the year. With the expanded Segovia processing facility set to be commissioned this quarter, we are well on track to deliver on our full-year production guidance of 230,000 to 275,000 oz."

Chart 2: Segovia Operations – Quarterly Production Data  

Operating Information

Q1 2025

Q1 2024

Q2 2024

Q3 2024

Q4 2024

FY 2024

Tonnes processed (kt)

167

154

156

167

168

645

Tonnes per day (tpd)

1,966

1,817

1,834

1,940

1,949

1,885

Average gold grade processed (g/t)

9.37

9.42

9.14

9.23

9.84

9.41

Recoveries (%)

96.1 %

95.6 %

96.0 %

95.9 %

96.6 %

96.0 %

Gold produced (ounces)

47,549

44,908

43,705

47,493

51,477

187,583

Gold sold (ounces)

47,390

45,288

43,366

48,059

50,409

187,122

Chart 3: Marmato Upper Mine – Quarterly Production Data  

Operating Information

Q1 2025

Q1 2024

Q2 2024

Q3 2024

Q4 2024

FY 2024

Tonnes processed (kt)

74

62

61

70

60

254

Average gold grade processed (g/t)

3.32

3.27

3.18

3.06

3.61

3.28

Recoveries (%)

91.7 %

90.2 %

89.2 %

89.4 %

90.7 %

89.9 %

Gold produced (ounces)

7,214

5,859

5,511

6,115

5,887

23,372

Gold sold (ounces)

6,891

5,756

6,103

5,710

5,925

23,494

*The Q1 2025 results provided in this news release are approximate and may differ from the final results to be included in the Company's 2025 interim financial statements and MD&A, which the Company expects to release in early May 2025.

About Aris Mining

Founded in September 2022, Aris Mining was established with a vision to build a leading Latin America-focused gold mining company. Our strategy blends current production and cashflow generation with transformational growth driven by expansions of our operating assets, exploration and development projects. Aris Mining is listed on the TSX (ARIS) and the NYSE-A (ARMN) and is led by an experienced team with a track record of value creation, operational excellence, financial discipline and good corporate governance in the gold mining industry.

Aris Mining operates two underground gold mines in Colombia: the Segovia Operations and the Marmato Upper Mine, which together produced 210,955 ounces of gold in 2024. With expansions underway, Aris Mining is targeting an annual production rate of more than 500,000 ounces of gold following the ramp-up of the Segovia mill expansion, expected during the second half of 2025, and the new Marmato Lower Mine, which is expected to start ramping up production in the second half of 2026. In addition, Aris Mining operates the 51% owned Soto Norte joint venture, where studies are underway on a new, smaller scale development plan, with results expected in mid-2025. In Guyana, Aris Mining owns the Toroparu gold/copper project, further diversifying its asset portfolio.

Colombia is rich in high-grade gold deposits and Aris Mining is actively pursuing partnerships with the Country's dynamic small-scale mining sector. With these partnerships, we enable safe, legal, and environmentally responsible operations that benefit both local communities and the industry.

Aris Mining intends to pursue acquisitions and other growth opportunities to unlock value through scale and diversification.

Additional information on Aris Mining can be found at www.aris-mining.com, www.sedarplus.ca, and on www.sec.gov.

Forward-Looking Information

This news release contains "forward-looking information" or "forward-looking statements" within the meaning of Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-looking statements, including, without limitation, statements relating to the timeline and potential benefits of the expanded Segovia processing facility; the Company's 2025 production guidance; and statements included in the "About Us" section of this news release relating to the Segovia Operations, the new Marmato Lower Mine and the Soto Norte project. Generally, the forward-looking information and forward looking statements can be identified by the use of forward looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", "will continue" or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". The material factors or assumptions used to develop forward looking information or statements are disclosed throughout this news release.

Forward looking information and forward looking statements, while based on management's best estimates and assumptions, are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Aris Mining to be materially different from those expressed or implied by such forward-looking information or forward looking statements, including but not limited to those factors discussed in the section entitled "Risk Factors" in Aris Mining's Annual Information Form dated March 12, 2025 which is available on SEDAR+ at www.sedarplus.ca and in the Company's filings with the SEC at www.sec.gov. These factors should be considered carefully, and readers should not place undue reliance on the Company's forward-looking statements. The Company has no intention and undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/aris-mining-reports-q1-2025-gold-production-achieving-8-year-over-year-growth-302423917.html

SOURCE Aris Mining Corporation

FAQ

What was Aris Mining's (ARMN) gold production in Q1 2025?

Aris Mining produced 54,763 ounces of gold in Q1 2025, with 47,549 oz from Segovia and 7,214 oz from the Marmato Upper Mine.

How much did ARMN's gold production grow year-over-year in Q1 2025?

Aris Mining's gold production grew 8% year-over-year, from 50,767 oz in Q1 2024 to 54,763 oz in Q1 2025.

What is Aris Mining's (ARMN) production guidance for 2025?

Aris Mining's 2025 production guidance is 230,000-275,000 oz, with Segovia contributing 210,000-250,000 oz and Marmato Upper Mine adding 20,000-25,000 oz.

When will ARMN's expanded Segovia processing facility be commissioned?

The expanded Segovia processing facility is scheduled to be commissioned in Q2 2025.

What were the recovery rates at ARMN's Segovia and Marmato mines in Q1 2025?

In Q1 2025, Segovia achieved 96.1% recovery rate while Marmato Upper Mine reached 91.7% recovery rate.
Aris Mining Corp

NYSE:ARMN

ARMN Rankings

ARMN Latest News

ARMN Stock Data

927.01M
163.64M
4.85%
58.79%
2.59%
Gold
Basic Materials
Link
Canada
Vancouver