Altiplano Reports Q1 2024 Operational Results at Farellon with 2.29% Copper Recovered in March
Altiplano Metals Inc. reported Q1 2024 operational results from the Farellon mine in Chile, with a copper grade of 1.74% and record 2.29% in March. Production totaled 8,600 tonnes with $716,200 revenue, a 10% decrease from Q4 2023. Waste removal increased by 65% as development progresses. The El Peñón processing plant now has full power support. Stockpiles are ready for processing, and the company generated over $14.9 million from copper sales since 2018.
The company achieved a record high copper grade of 2.29% in March 2024, indicating potential for increased revenue from higher-grade material.
The completion of power installation at the El Peñón processing plant ensures full operational power support, enhancing processing efficiencies.
The stockpiles of processed material at Farellon and El Peñón sites provide opportunities for future revenue generation and operational optimization.
Copper prices have increased by over 25% in the past two months, signaling a positive market trend that could benefit Altiplano's revenue and profitability.
The reduction in copper grade from 1.87% in Q4 2023 to 1.74% in Q1 2024 may impact the overall revenue generated by the company.
A 10% decrease in revenue from $798,919 in Q4 2023 to approximately $716,200 in Q1 2024 highlights a potential financial challenge for the company.
A 5.6% decrease in total material produced and a 3.7% decrease in processed material compared to Q4 2023 could impact the company's overall production output.
Edmonton, Alberta--(Newsfile Corp. - May 7, 2024) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q1 2024 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile.
For the Q1 2024 period, the copper grade produced at Farellon was recorded at
Production in Q1 2024 totalled 8,600 tonnes of mineralized Cu-Au material and processed material totalled 7,822 tonnes. These figures represent a decrease of
El Peñón Processing Plant
The Company also provides an update on the progress at the El Peñón processing plant located 15 kms from the Farellon mine with final power installation completed at the plant. This work was finalized recently after a several month delay by the power supplier. The plant now receives the designed 1,000 kVA to support the full operational power requirements. The diesel generators used for the start up phase have been returned.
President and CEO Alastair McIntyre comments: "Q1 2024 was a busy quarter finalizing the processing plant for startup and optimizing the development and production at Farellon. Excellent copper grades averaging
Stockpiles
At the end of March 2024, the Company had 218 tonnes in stockpiles at the Farellon site and a total of 1,200 tonnes of stockpiles at the El Peñón mill site. An additional 8,500 tonnes of lower-grade material are stockpiled at Farellon site and ready to be shipped for processing at the El Peñón facility over the next several months. These stockpiles will be blended with newly mined material to optimize processing efficiencies. In addition, the Company currently has 710 tonnes of material in process with third party processors. This material will be processed for copper sales and the revenue will be realized in the coming months.
Figure 1. Quarterly Review of US$ Revenue and Copper Pounds Sold
Period | Mined | USD Revenue* | Cu Pounds Sold | Copper Grade |
Q1 2023 | 7,675 | 307,104 | ||
Q2 2023 | 8,315 | 294,162 | ||
Q3 2023 | 8,116 | 263,232 | ||
Q4 2023 | 9,114 | 325,358 | ||
Q1 2024 | 8,600 | 292,884 |
* After processing costs
Figure 2. 2024 Monthly Copper Grade
Period | Tonnes Processed | Copper Grade |
January 2024 | 7,675 | |
February 2024 | 8,315 | |
March 2024 | 8,116 |
Figure 3. Mined, Processed, Waste Removed and Cu Grade by Quarter 2022-2024
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/208202_altiplanofig3.jpg
Figure 4. Processed Material, Income vs. Mining Costs by Quarter 2022-2024
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/208202_altiplanofig4.jpg
Q1 2024 Mining Activity
Mining activity during the first quarter focused on production from the 336 m level where a total 8,612 tonnes were extracted. This amount included 6692 tonnes from the north advance and 1920 tonnes from the south advance. High grade copper in amounts exceeding
Development continues on the extension of the Hugo tunnel, advancing 43 meters towards the next mining level located a 326 m elevation. Approximately 15 m remain to reach the production zone where where mining is planned on drifts to the NE and SW directions. The added production level will provide opportunity to mine at several operational work faces to improve production output.
Copper Markets Waking Up
Copper prices have risen greater than
Figure 6. Two Year Copper Price
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/208202_d777368cd456980e_003full.jpg
Figure 7. Chalcopyrite with Bornite in Stockpiles/Underground Miners Prepare the Advance in the 336m North Mining Area
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/208202_altiplanofig7.jpg
Altiplano has generated over US
About Altiplano
Altiplano Metals is a growing gold, silver, and copper company focused on the Americas. The Company has a diversified portfolio of assets that include an operating copper/gold/iron mine and a state-of-the-art operating copper/gold and iron processing facility in the final stages of completion. Altiplano is focused on creating long-term stakeholder value through developing safe and sustainable production, reinvesting into exploration, and pursuing acquisition opportunities to complement its existing portfolio. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value. Altiplano trades on the TSX.V under the symbol APN and the Frankfurt Exchange under the symbol A2JNFG.
John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed, and approved the technical contents of this document.
Altiplano is part of the Metals Group of Companies, led by a dynamic group of resource sector professionals with a long record of success in evaluating and advancing mining projects from exploration through to production, attracting capital, and overcoming adversity to deliver exceptional shareholder value.
ON BEHALF OF THE BOARD
/s/ "John Williamson"
Chairman
For further information, please contact:
Alastair McIntyre, CEO
alastairm@apnmetals.com
Tel: (416) 434 3799
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. The Farellon mine was previously in production dating back to the 1970's with a reported historical production (to a depth of 70 m) yielding approximately 300,000 tonnes at an average grade of
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/208202
FAQ
What was the copper grade produced at Farellon in Q1 2024?
The copper grade produced at Farellon in Q1 2024 was 1.74%, with a record grade of 2.29% achieved in March.
How much revenue was generated from copper sales in Q1 2024?
The company generated approximately $716,200 in revenue from copper sales in Q1 2024, a 10% decrease from Q4 2023.
Where is the El Peñón processing plant located?
The El Peñón processing plant is located 15 km from the Farellon mine in Chile.
What is the total amount of stockpiles at the Farellon and El Peñón sites?
At the end of March 2024, the company had 218 tonnes of stockpiles at the Farellon site and a total of 1,200 tonnes at the El Peñón mill site.
How much has Altiplano generated from copper sales since 2018?
Altiplano has generated over $14.9 million from the recovery and sale of more than 6.55 million pounds of copper with an average grade of 1.8% Cu from 2018 Q1 to 2024 Q1.